    AGM Meeting Company Update Presentation 27 June 2025 www.sundaenergy.com

  2. Slide 2: Important Notice & Disclaimer

    Important Notice & Disclaimer The information contained in this document (“Presentation”) has been prepared by Sunda Energy plc (the depend on circumstances that may or may not occur in the future. These forward-looking statements “Company”). The Company is a UK company quoted on AIM, a market opera

  3. Slide 3: Introducing Sunda Energy Plc (SNDA.L) and its gas strategy

    Introducing Sunda Energy Plc (SNDA.L) and its gas strategy Vietnam Sunda Energy is an independent E&P with a focus on gas in SE Asia and a key asset in Timor-Leste Thailand Cambodia Philippines Why Sunda and SE Asia? ✓ Robust energy demand growth ✓ Strong government alignment Brunei Bid blocks ✓ Mat

  4. Slide 4: Sunda Energy Plc: Operational and Financial Highlights for 2024

    Sunda Energy Plc: Operational and Financial Highlights for 2024 Operational ▪ Chuditch farm-in completed with TIMOR GAP, increasing working interest from 25% to 40% ▪ Memorandum of Understanding signed with MPRM and TIMOR GAP, setting the framework for joint evaluation of a development concept for g

  5. Slide 5: Chuditch Field: A Material Asset in the Timor Sea Gas Fairway

    Chuditch Field: A Material Asset in the Timor Sea Gas Fairway Sunda 60% (op), TIMOR GAP 40% 1 CPR prepared by ERC Equipoise Pte. Ltd., Feb. 2023; SPE PRMS compliant standard 2 SundaGas management estimates COMPANY PRESENTATION | 4 Note: resources are gross including off PSC area, not net attributabl

  6. Slide 6: Plan to drill and test the Chuditch-2 well

    Plan to drill and test the Chuditch-2 well ✓ Appraisal well location selected 5.1 km ENE from discovery, in 68m water depth ✓ 149m gas column expected (versus 30m gas column encountered at Chuditch-1) ✓ Drilling delayed, now expecting to drill and test Chuditch-2 by H1 2026 Depth to Top Plover Reser

  7. Slide 7: Export Concept: Pipeline via Bayu Undan to Timor-Leste LNG

    Export Concept: Pipeline via Bayu Undan to Timor-Leste LNG ✓ MOU signed with Ministry and TIMOR GAP, Dec 2024 ✓ Facilities Feasibility Study expected to complete June 2025 Timor-Leste LNG ✓ Simple phased development ✓ Gas export via pipeline to Bayu Undan, then to LNG facility on Timor-Leste ✓ Long

  8. Slide 8: New Business: Philippines Licence Round Applications

    New Business: Philippines Licence Round Applications ✓ Sunda actively pursuing new gas assets in SE Asia, targeting material gas assets with low entry costs ✓ Applications in Philippines 1st Bid Round (BARMM) ✓ Applications in Joint Venture with 3 other companies ✓ Sunda expects to hold a 37.5% non-

  9. Slide 9: Social Responsibility Initiatives in Timor-Leste

    Social Responsibility Initiatives in Timor-Leste January 2025 185 children attend this Pre-School Renovation project became complete rebuild Work commenced May 2025 in January; built in 4 months for $64k Inauguration ceremony 6 June COMPANY PRESENTATION | 8

  10. Slide 10: Thank You

    Thank You Contact Information UK Executive Office: Registered Office: Strategic Communications PO Box 404 201 Temple Chambers Advisor: Hastings, TN34 9LF 3-7 Temple Avenue Celicourt Communications United Kingdom London, EC4Y 0DT Email: [email protected] United Kingdom T: +44 (0) 20 7770 6424 COMPAN

  11. Slide 11: Glossary

    Glossary Term Definition Denotes the low estimate qualifying as Contingent Resources. Reflects a volume estimate that there is a 90% probability that the quantities actually recovered will equal 1C or exceed the estimate Denotes the low estimate qualifying as Prospective Resources. Reflects a volume