Slide 1: Deepwater Well Integrity Challenges: DeepAssurance Cementing Solution Suite
Deepwater Well Integrity Challenges DeepAssurance™ Cementing Solution Suite May 2014
Slide 2: Cementing – History of Innovation
Cementing – History of Innovation 1919 1922 1923 1930 1932 1938 1940 1947 First cementing job The two-plug Re-circulating Chemical First Cementing Bulk handling First truly transforms oil and gas system patented jet mixer research lab RedBook shallow-water of cement offshore well wellbore architectu
Slide 3: Wellbore Integrity Issues
Wellbore Integrity Issues CONDUCTOR CASING SURFACE CASING INTERMEDIATE CASING INTERMEDIATE CASING PRODUCTION CASING © Halliburton 2014. All rights reserved. 3
Slide 4: Deepwater Cementing Challenges
Deepwater Cementing Challenges Annular Pressures Corrosive Environments (CO2 / Salt) Narrow Pressure Margins Plug Setting Reliability – Wellbore Integrity Riserless Cementing Temperature Variance © Halliburton 2014. All rights reserved. 4
Slide 5: DeepAssurance Cementing Solution Suite
DeepAssurance™ Cementing Solution Suite © Halliburton 2014. All rights reserved. 5
Slide 6: DeepAssurance Cementing Solution Suite
DeepAssurance™ Cementing Solution Suite Overview Solutions Challenges © Halliburton 2014. All rights reserved. 6
Slide 7: New Technologies: Centralizer
New Technologies: Centralizer Protech™ Flex Centralizer
Slide 8: Protech Flex Centralizers
Protech™ Flex Centralizers Solid-type blades for standoff without compromise Withstand dynamic thermal-pressure environments with shear strength rated to 880 psi Torque and drag resistance reduced to 0.25 © Halliburton 2014. All rights reserved. 8
Slide 9: Bonded Directly to Casing, Liners, Drill Pipe
Bonded Directly to Casing, Liners, Drill Pipe Protech™ Flex Centralizers © Halliburton 2014. All rights reserved. 9
Slide 10: Enhanced Rig Floor Safety
Enhanced Rig Floor Safety Protech™ Flex Centralizers © Halliburton 2014. All rights reserved. 10
Slide 11: Uncompromised Standoff
Uncompromised Standoff Protech™ Flex Centralizers © Halliburton 2014. All rights reserved. 11
Slide 12: Enhanced Flow Area
Enhanced Flow Area Protech™ Flex Centralizers © Halliburton 2014. All rights reserved. 12
Slide 13: New Technologies: Offshore System
New Technologies: Offshore System HCS AdvantageOne™ Cementing Offshore System
Slide 14: HCS AdvantageOne Cementing System
HCS AdvantageOne™ Cementing System Advanced mixing system for accuracy and reliability Unit health monitoring Pre-job systems check, automated valve configuration Faster, simpler installation with a reduced footprint © Halliburton 2014. All rights reserved. 14
Slide 15: HCS AdvantageOne Cementing System
HCS AdvantageOne™ Cementing System HSE: – Dust collection – Non-radioactive densometer © Halliburton 2014. All rights reserved. 15
Slide 16: HCS AdvantageOne Cementing System
HCS AdvantageOne™ Cementing System Onboard high-pressure test system © Halliburton 2014. All rights reserved. 16
Slide 17: HCS AdvantageOne Cementing System
HCS AdvantageOne™ Cementing System Integrated liquid additive system with slide-out automated metering pumps © Halliburton 2014. All rights reserved. 17
Slide 18: HCS AdvantageOne Cementing System
HCS AdvantageOne™ Cementing System Integrated remote controls for off-unit operation © Halliburton 2014. All rights reserved. 18
Slide 19: New Technologies: Software Simulations
New Technologies: Software Simulations HCS AdvantageOne™ Cementing Offshore System
Slide 20: iCem Service
iCem® Service Predictive bond logs Lost Circulation Modeling Enhanced equivalent circulating density modeling Managed-pressure cementing operations module © Halliburton 2014. All rights reserved. 20
Slide 21: iCem Service – ECD
iCem® Service – ECD © Halliburton 2014. All rights reserved. 21
Slide 22: iCem Service – Hook Load
iCem® Service – Hook Load © Halliburton 2014. All rights reserved. 22
Slide 23: iCem Service – Displacement Efficiency
iCem® Service – Displacement Efficiency © Halliburton 2014. All rights reserved. 23
Slide 24: Actual Bond Log Comparison to iCem Service Data
Actual Bond Log Comparison to iCem® Service Data Bond Log iCem Service Bond Log iCem Service Bond Log iCem Service © Halliburton 2014. All rights reserved. 24
Slide 25: New Technologies: Cementing System
New Technologies: Cementing System SaltShield™ Cement
Slide 26: Salt Zone Challenges
Salt Zone Challenges Reactive salt zones could gel slurry during placement Formation salt could dissolve into slurry affecting curing Salt creep / movement could damage cement sheath and/or casing © Halliburton 2014. All rights reserved. 26
Slide 27: SaltShield Cement
SaltShield™ Cement Withstands loads due to salt creep Resistant to gelation upon salt contamination Low permeability and good compressive strength WellLife® Service – Modeling of Plastic Salt Flow © Halliburton 2014. All rights reserved. 27
Slide 28: SaltShield Cement – Remains Pumpable
SaltShield™ Cement – Remains Pumpable In Spite of Salt Contamination © Halliburton 2014. All rights reserved. 28
Slide 29: SaltShield Cement – Remains Pumpable
SaltShield™ Cement – Remains Pumpable In Spite of Salt Contamination © Halliburton 2014. All rights reserved. 29
Slide 30: SaltShield Cement – Remains Pumpable
SaltShield™ Cement – Remains Pumpable In Spite of Salt Contamination © Halliburton 2014. All rights reserved. 30
Slide 31: SaltShield Cement – Remains Pumpable
SaltShield™ Cement – Remains Pumpable In Spite of Salt Contamination © Halliburton 2014. All rights reserved. 31
Slide 32: Questions