Synergia Energy Ltd · LSE:SYN

Synergia Energy — Oilex — Shareholder Meeting (November 2013)

16 slides from Synergia Energy's shareholder meeting presentation, November 2013

  1. Slide 1: Focused on Value, Methodical in Delivery

    Focused on Value Methodical in Delivery ASX / AIM: OEX November 2013

  2. Slide 2: Important Information

    Important Information Disclaimer The presentation in this projected form and as verbally presented (Presentation) is provided on the basis that none of the Company Directors nor its respective officers, shareholders, related bodies corporate, partners, affiliates, employees, representatives and advi

  3. Slide 3: Board and Management Team

    Board and Management Team Max Cozijn Pete Bekkers Appointed as Non- Appointed Chief Executive Chairman Geoscientist in 2007 in 2003. Over 31 more than 16 years years experience in experience. administration of listed companies Sundeep Rob Ierace Bhandari Appointed as Chief Appointed as Vice Financia

  4. Slide 4: Investment Highlights

    Investment Highlights \ Asset portfolio, focused on onshore tight/unconventional petroleum \ Large discovered independently certified resource base \ Objective: grow production, cash flow and reserves \ Cambay Project (INDIA – OEX Operator, 45% decreasing to a minimum of 30%) • Sale of up to 15% equ

  5. Slide 5: NSAI Independent Resource Estimate for Cambay

    NSAI Independent Resource Estimate for Cambay Unrisked Contingent Resource Estimates (the near term production and cash) Low (1C) Best (2C) High (3C) Oil Gas Oil Gas Oil Gas MMstb BCF MMstb BCF MMstb BCF Gross in place 831 672 1,633 1,314 2,888 2,297 Gross recoverable 31 180 83 495 179 1,073 Net OEX

  6. Slide 6: Cambay Asset: Overview

    Cambay Asset: Overview \ Acreage • Cambay Basin: large producing province • Cambay Field: 161 km² (~40,000 acres) • Oilex drilled first horizontal Sabarmati Field multi-stage frac well in India \ Commercial Environment • Gujarat industrial heartland Cambay Field • Significant gas demand • Infrastruc

  7. Slide 7: Cambay-77H: Update

    Cambay-77H: Update \ Critical Items • 4 ½ inch casing ordered, delivery expected at site in December • Drill Rig − Technical evaluation complete − 2 rigs technically qualified, both readily available − Commercial bids opened and evaluation in progress • Fracture stimulation tenders − Technical evalu

  8. Slide 8: The Magna Deal: Update

    The Magna Deal: Update \ The Deal • Sold 10% equity for US$4million and option over additional 5% for US$2million • Subject to pre-emption under JOA and GOI approvals under PSC • If GOI approval is not obtained by 1 May 2013, Magna cash payment may be converted into OEX shares up to 19.9% of Oilex I

  9. Slide 9: Bhandut-3: Gas Production Leads To Cash Flow

    Bhandut–3: Gas Production Leads To Cash Flow \ Bhandut Contract Area Bhandut PSC Area • 6km2 (~1,482 acres) • 19,385bbls cum. oil produced since acquisition in 2007 \ Isochronal test of 3.5m sand ☼ Possible Channel Sands • Below seismic resolution • Flowed 6.5MMscfd of dry gas Potential for addition

  10. Slide 10: Active forward work programme to production and cashflow

    Active forward work programme to production and cashflow 2013 2014 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 JV and Government Approvals  3 Work-Over Wells   Ongoing Bhandut–3 Preparation Production & Sales Ongoing Cambay–73 Preparation Production & Sales Drill, Frac, Ongoing Prepare Cambay–77H & Mobilise Clean-Up

  11. Slide 11: Wallal Graben Play Fairway: Moving forward at steady pace

    Wallal Graben Play Fairway: Moving forward at steady pace \ Strategic rationale: • Low-cost, low-risk entry • Concentrated prospectivity • Long-term growth potential and diversity \ Oilex awarded Canning Basin acreage • SPA-0055 ~ 2.8 million acres • STP-EPA-0106 ~ 700,000 acres • STP-EPA-0107 ~ 900

  12. Slide 12: Wallal Graben: Seismic tells story

    Wallal Graben: Seismic tells story \ Jump correlations with regional seismic data infer: • A near-complete Ordovician sequence is preserved L12-08 • Possible thick Goldwyer Formation - primary source rock L12-09 • Potential for additional organic-rich formations \ Low resolution gravity/magnetics da

  13. Slide 13: Why the Wallal Graben Fairway?

    Why the Wallal Graben Fairway? Cairn’s Rajasthan acreage at same scale \ Overlooked prospectivity: 7.3 Billion boe in-place 26 separate discoveries • Sparse gravity/magnetic data Production = 175,000 bopd • Vintage 2D seismic data • Analogous to Cairn India’s Rajasthan Play • Undrilled play fairway

  14. Slide 14: Updated scorecard as at AGM

    Updated scorecard as at AGM Goals and Objectives Status Production × Cambay–73 GSA signed, competitive tenders required  Bhandut–3 tested 6.2MMscfd, tenders issued for sales  Work-overs on 3 Cambay wells limited success Cost Control/Cashflow  Net corporate overheads reduced ~ 25% from 2012  Indi

  15. Slide 15: Oilex's Investment Proposition

    Oilex’s Investment Proposition \ Strategic focus on the Cambay Asset centred on production, cash flow and reserves \ Cambay drilling operations tenders issued, bids received, evaluations in progress and critical award made \ Use proven technology de-risks active forward work plan \ Growth potential

  16. Slide 16: www.oilex.com.au

    www.oilex.com.au Phone: +61 8 9485 3200 Email: [email protected] Twitter: @oilexltd

Oilex — Shareholder Meeting (November 2013) on 6ix