Devex Resources Ltd · ASX:DEV

Devex Resources — Uranium Equities — Shareholder Meeting (November 2012)

19 slides from Devex Resources's shareholder meeting presentation, Nov 27, 2012

  1. Slide 1: 2012 AGM Presentation

    AGM Presentation – 27November 2012 2012 AGM Presentation 27 t h N ovember 2012

  2. Slide 2: Disclaimer and Competent Person Statement

    AGM Presentation – 27November 2012 Disclaimer and Competent Person Statement  Forward Looking Statements This Presentation may include statements that could be deemed “forward-looking statements”. Although the Company believes the expectations expressed in such forward-looking statements are based

  3. Slide 3: 2013 - Positioned For Growth

    AGM Presentation – 27November 2012 2013 - Positioned For Growth • The PhosEnergy Process (UEQ 27% and Manager) • Demonstration Plant operated in 2012 – confirmed cost assumptions and scalability • PFS level Engineering Study to be completed Jan 2013 • Exploration Consolidation • Land swap with Camec

  4. Slide 4: The PhosEnergy Process

    AGM Presentation – 27November 2012 The PhosEnergy Process …..reviving uranium recovery from the phosphate fertiliser industry…… 4

  5. Slide 5: Scale of the Opportunity

    AGM Presentation – 27November 2012 Scale of the Opportunity More than $1 billion in potential revenue per annum. • Worldwide >140Mt phosphate processed annually.  ~20 million lb of contained U3O8 3.5 $140  Proven reliable uranium source 3.0 $120 • Multiple potential development 2.5 $100 opportunit

  6. Slide 6: The PhosEnergy Process

    AGM Presentation – 27November 2012 The PhosEnergy Process The change required to rejuvenate an industry. • Developed by UEQ in partnership with: • Australian Nuclear Science and Technology Organisation (ANSTO). • A major US based phosphate producer. • PhosEnergy is a “bolt on process” to recover U3O

  7. Slide 7: UEQ's Share Funded

    AGM Presentation – 27November 2012 UEQ’s Share Funded Technology developed and funding in place. • Partnered with Cameco – One of the world’s largest uranium producers (Invested US$12.5M of which ~US$2M on hand June 2012) • Cameco can fund an additional US$4M to complete its earn-in to 73% of the te

  8. Slide 8: Moving PhosEnergy into Production

    AGM Presentation – 27November 2012 Moving PhosEnergy into Production 2012/2013 Development Plan • Demonstration Plant – Operated in the USA through August 2012 • Process successfully replicated • Confirmed high uranium recovery of over 90% • Supported operating cost assumptions • PFS level engineeri

  9. Slide 9: Commercialisation Strategy 2013

    AGM Presentation – 27November 2012 Commercialisation Strategy 2013 • USA Focus Near term production visibility  Existing regulatory framework and precedent – shorter lead time  ~ 6Mlb/a of recoverable uranium  Existing synergies with Cameco operations in the USA • Commercial model based on demons

  10. Slide 10: Exploration

    AGM Presentation – 27November 2012 Exploration Australia’s Premier Uranium Districts. Near mine exploration and externally funded Greenfields exploration in world class uranium provinces with enviable partners… Nabarlek Mine Lease 1988 10

  11. Slide 11: Nabarlek Project

    AGM Presentation – 27November 2012 Nabarlek Project The place to find world class deposits. • Alligator Rivers: A world class Uranium province. • Nabarlek Mine: Closed in 1988. Mined 24.8Mlb U3O8 @ 1.84% with surface projection of 200m x 50m • Nabarlek Project: 477 km2 in the heart of the Alligator

  12. Slide 12: WAJV – U40 Prospect

    AGM Presentation – 27November 2012 WAJV – U40 Prospect U40 and structural repetitions. • 2010 diamond drilling returned (see ASX release 21/12/2010): Pitchblende NAD7492 blebs in NAD7492 6.8m @ 6.71 % U3O8 from 75m core 7.3m @ 1.68 % Cu from 74.5m 4.5m @ 0.91 ppm Au from 76.5m • 2011 Exploration res

  13. Slide 13: WAJV – U40 Prospect

    AGM Presentation – 27November 2012 WAJV – U40 Prospect 2013 Drilling program. • Following up from 6%+ uranium found in the Quarry Fault Zone in 2010 • Additional targets on the Quarry Fault have been identified. • U40 East • U40 Southeast • U42 • Proposed Work Program: 4000m RC drilling on U40 East

  14. Slide 14: Oodnadatta & Marla Projects

    AGM Presentation – 27November 2012 Oodnadatta & Marla Projects • ~16,000 km2 of ELs & ELAs on the northern margin of the Gawler Craton (UEQ 100%) • Prospective for IOCGU deposits • Co-incident magnetic and gravity highs identified in Todmorden Target Area (Right) • $90,000 PACE 2020 co-funding grant

  15. Slide 15: Rudall River JV

    AGM Presentation – 27November 2012 Rudall River JV Brownfields exploration adjacent the Kintyre Deposit Project: Rudall River JV • UEQ Free Carried 15% • Cameco Earning to 85% Previous Exploration: • Excellent geochem database • Recent GA Airborne EM survey over Patterson's district • Adjacent the K

  16. Slide 16: Strategic Investment in EMX

    AGM Presentation – 27November 2012 Strategic Investment in EMX Strong Preliminary Resource – view to expansion • Energia Minerals (ASX:EMX)  UEQ acquired 15% in EMX via placement;  Subsequent to current rights UEQ to hold up to 21.1% of EMX expanded capital • Carley Bore Uranium Deposit:  Current

  17. Slide 17: Carnarvon Basin ISR District

    AGM Presentation – 27November 2012 Carnarvon Basin ISR District Australia’s next ISR District • Carnarvon Basin • ISR amenable conditions • Relatively shallow – low capital intensity • Manyingee - Paladin Energy (ASX:PDN) • Resource*: 24Mlb @ 0.09% U3O8 • Additional Target*: 11Mlb @ 0.1% U3O8 • Prog

  18. Slide 18: 2012/13 Strategy

    AGM Presentation – 27November 2012 2012/13 Strategy High Impact Exploration and PhosEnergy Commercialisation PhosEnergy:  Progress the Technology through Demonstration and PFS level Engineering Study;  Seek additional pipeline projects to utilise Demonstration Plant asset. Exploration:  focus on:

  19. Slide 19: Capital Structure and People

    AGM Presentation – 27November 2012 ASX:UEQ Capital Structure and People Capital Structure Board Shares 265M Tony Kiernan Chairman Fully Diluted 274M Bryn Jones Managing Director Market Cap @ 3.5c $9.3M Tim Goyder Non Exec Director Cash (30 Sep) $1.8M Tom Pool Non Exec Director ______________________

Uranium Equities — Shareholder Meeting (November 2012) on 6ix