Oil & Natural Gas Corp. Ltd. · NSE:ONGC

Oil & Natural Gas — Shareholder Meeting (September 2009)

78 slides from Oil & Natural Gas's shareholder meeting presentation, Sep 23, 2009

  1. Slide 1: Post AGM Media interaction

    Slide 1: Post AGM Media interaction

    Post AGM Media interaction New Delhi 23rd September 2009

  2. Slide 2: Presentation overview

    Slide 2: Presentation overview

    Presentation overview Industry scenario ONGC: Highlights Performance Initiatives Recognitions Concerns Growth prospects sitvorsttett onGcc

  3. Slide 3: Industry scenario

    Slide 3: Industry scenario

    Industry scenario

  4. Slide 4: Energy demand shift

    Slide 4: Energy demand shift

    Energy demand shift In last 25 years World energy consumption increased by 70% CAGR @ 2.1%; Asia Pacific: @ 4.8%; Europe & America: @0.2% 4,500 2003:Asia-Pacific the largest 3982 4,000 energy consuming region rasia 3,500 & E u pe 3,000 E u ro Million Tonnes 2,500 a orth Americ N 2,000 a P acific Asi

  5. Slide 5: West East

    Slide 5: West East

    West East Energy consumption centre shifts from West to East due to demand from developing economies 1970 2008 Source: BP Statistical Review of World Energy-2009 5

  6. Slide 6: Crude oil consumption

    Slide 6: Crude oil consumption

    Crude oil consumption World crude oil consumption increased by 27% in last 20 yrs Demand destruction? 2007 85 million bbl per day 2008 84 million bbl per day Marginal & Temporary! Source: BP Statistical Review of World Energy-2009 6

  7. Slide 7: Supply scenario

    Slide 7: Supply scenario

    Supply scenario Non-OPEC fields (excl. FSU) which were producing in 2000 declined @ 9.4% a year. ƒ FSU countries decline rate @ 6.6% ƒ Decline rate increasing steadily since last five years ƒ Percent decline in production from fields producing in 2000 & 2008 ◦ Europe: more than 30% ◦ Non-OPEC Middle

  8. Slide 8: Supply outlook

    Slide 8: Supply outlook

    Supply outlook Dependence on OPEC crude to increase Demand (mmb/d) 120 1.5% 1.0% 100 0.5% 80 OPEC Liquids 60 40 Non-OPEC Liquids 20 0 1995 2000 2005 2010 2015 2020 2025 2030 Non-OPEC Crude, NGL, & Condensate * OPEC Crude, NGL, & Condensate Non-OPEC Oil Sands Biofuels & Other Liquids 0.5% Demand Grow

  9. Slide 9: Surplus capacity

    Slide 9: Surplus capacity

    Surplus capacity OPEC surplus capacity & Oil price y Present demand destruction is only temporary y Demand to strengthen as soon as world economy comes out of recession y Sustaining future supplies would require continued investment in E&P ventures Source: Global Data 9

  10. Slide 10: Oil price syndrome

    Slide 10: Oil price syndrome

    Oil price syndrome Speculators drove the prices up, subsequently, massive de-leveraging by financial institutions contributed to collapse in Crude oil prices Petro-dollars in commodity exchanges Hoarding Hoarding l es ile ru lat n o tio e v Speculation gains u la ric momentum p ec il p S eo r ud c C

  11. Slide 11: The meltdown effect

    Slide 11: The meltdown effect

    The meltdown effect y Financial crisis led oil price crash y Weaker revenue streams for oil companies; less internal accruals y Shrinking E&P investment y Testing time for smaller E&P operators & Service providers dependent on credits y Postponement and cancellation of E&P projects y Oil prices star

  12. Slide 12: Industry outlook

    Slide 12: Industry outlook

    Industry outlook y Economy showing signs of revival y Consequently, energy demand is bound to go up y Energy players’ task is cut out 12

  13. Slide 13: Highlights: FY'09

    Slide 13: Highlights: FY'09

    Highlights: FY’09

  14. Slide 14: Highlights - FY'09

    Slide 14: Highlights - FY'09

    Highlights - FY’09 ONGC: Domestic ƒ 28 discoveries in FY’09 ƒ Reserve Accretion • In-place : 284.81 MTOE, highest in 20 years • Ultimate reserve : 68.90 MTOE, highest in 18 years ƒ Reserve Replacement Ratio (RRR) more than 1 for the 5th th consecutive year ƒ Production (excluding JV) ƒ Financials (i

  15. Slide 15: Highlights: FY'09 MRPL and OVL

    Slide 15: Highlights: FY'09 MRPL and OVL

    Highlights : FY’09 MRPL ƒ Highest ever throughput (130%) ƒ Attained overall growth of 23%, covering 4 products under direct marketing OVL ƒ Acquired 7 properties, 2 of them producing ƒ Ultimate reserve buildup highest (135.08 MTOE) ƒ 2nd nd oil discovery in North Ramadan, Egypt 15

  16. Slide 16: Performance ONGC Group

    Slide 16: Performance ONGC Group

    Performance ONGC Group

  17. Slide 17: Reserve accretion

    Slide 17: Reserve accretion

    Reserve accretion FY’09: Ultimate Reserve Accretion (3P) = 206.806 MTOE the highest in last 18 years Domestic Overseas 70.33 70.33 71.72 71.72 64.01 64.01 63.48 63.48 51.65 51.65 34.00 34.00 MTOE: Million Tonnes of Oil Equivalent 17

  18. Slide 18: Reserve Position

    Slide 18: Reserve Position

    Reserve Position As on 01.04.2009, Total Reserves (3P): 1,591.53 MTOE Oil Gas Total ONGC 569.51 569.27 1138.77 PSC JV 22.93 23.06 45.99 OVL 236.75 170.02 406.77 Total 829.19 762.35 1591.53 18

  19. Slide 19: O+OEG production

    Slide 19: O+OEG production

    O+OEG production Marginal shortfall in production during FY’09 Aggregate: (-1%); ONGC: (-0.9%) 60.73 60.73 61.85 61.85 61.23 61.23 MTOE: Million Tonnes of Oil Equivalent 19

  20. Slide 20: Financials: ONGC Group

    Slide 20: Financials: ONGC Group

    Financials: ONGC Group Turnover, PAT, Net worth Rs. Crore 7.4% 0.4 % 18% 20

  21. Slide 21: Performance ONGC: Domestic

    Slide 21: Performance ONGC: Domestic

    Performance ONGC: Domestic

  22. Slide 22: Discoveries: FY'09

    Slide 22: Discoveries: FY'09

    Discoveries: FY’09 28 New Discoveries 13 Prospects 15 Pools + One CBM discovery Assam Self 3 1 Tripura 2 0 Western Onshore 2 4 CBM CBM Discovery Discovery Jharia Jharia block block KG Offshore 3 3 Western Offshore 0 3 KG Onshore 2 1 Cauvery Onshore 1 3 22

  23. Slide 23: Reserve Accretion

    Slide 23: Reserve Accretion

    Reserve Accretion FY’09: In-place hydrocarbon volume: 284.81 MTOE, highest in last 2 decades Ultimate Reserves: 68.90 MTOE, highest in last 18 years 23

  24. Slide 24: Domestic production

    Slide 24: Domestic production

    Domestic production O+OEG production level maintained MTOE 53.23 51.12 52.79 52.96 52.45 24

  25. Slide 25: Financials

    Slide 25: Financials

    Financials Turnover (CAGR 8%) Net Profit (CAGR 6%) Rs. Crore Rs. Crore +6% +6% -3% 25

  26. Slide 26: Financials

    Slide 26: Financials

    Financials Net worth (CAGR: 14%) Rs. Crore +12% 26

  27. Slide 27: Capex

    Slide 27: Capex

    Capex Capex: Rs. 76,546 Crore in last 5 years 21,820 21,820 Capex FY’09 17,651 17,651 13,305 13,305 11,421 11,421 10,681 10,681 27

  28. Slide 28: Dividend

    Slide 28: Dividend

    Dividend Dividend payout Dividend payout ratio ratio 43.9 % 44.5 % 42.4 % 40.9 % 42.4 % without dividend without dividend tax tax Dividend payout Dividend payout ratio ratio 49.9 % 50.7 % 48.9 % 47.9 % 49.7 % with dividend with dividend tax tax Govt. share 320% 320% Rs. 5,074 Crore 310% 450% 400% *

  29. Slide 29: Corporate Governance

    Slide 29: Corporate Governance

    Corporate Governance “NIL” comments from Statutory Auditors & C&AG Audit for FY’09 third time in a row fifth time in last six years. 29

  30. Slide 30: ONGC: Value creator

    Slide 30: ONGC: Value creator

    ONGC: Value creator ONGC tops the list of stocks that bested 2-year performance since Sept’07 … Economic Times (21 Sept’09) ONGC share price (Rs.) Investors’ wealth increased by Rs. 55,483 Sensex Crore 30

  31. Slide 31: Performance ONGC Videsh Ltd.

    Slide 31: Performance ONGC Videsh Ltd.

    Performance ONGC Videsh Ltd.

  32. Slide 32: Overseas Reserves

    Slide 32: Overseas Reserves

    Overseas Reserves FY’09: Ultimate Reserve accretion 135.08 MTOE … the highest-ever Reserves position (as on 31.03.09) (MTOE) Oil Gas O+OEG Ultimate 267.77 180.05 447.83 Reserve Cumulative 31.02 10.04 41.06 Production Balance 236.75 170.01 406.77 Reserves 32

  33. Slide 33: Equity Oil & Gas

    Slide 33: Equity Oil & Gas

    Equity Oil & Gas 40* Projects in 16 Countries 5 Discovered/ 25 Exploration 9 Producing Development Venezuela 1 2 Russia Cuba 2 2 3 Myanmar Colombia 5 1 1 2 Vietnam Brazil 4 1 Libya 3 1 Iran Nigeria 2 Nigeria JDZ 1 1 Iraq Congo Br 1 1 1 Syria Sudan 2 Egypt 2 * 40th Project is Sudan’s 741 km long comp

  34. Slide 34: Producing Properties

    Slide 34: Producing Properties

    Producing Properties 9 producing assets with OVL 34

  35. Slide 35: Imperial Energy

    Slide 35: Imperial Energy

    Imperial Energy New Acquisition y Producing Asset in West Siberia y 946 MMBoe of Oil & Gas Reserves y Acquired in Jan 2009 for US $ 2.1 Billion y Production up from 6,000 bpd on acquisition to 11,500 bpd y Largest Overseas Corporate Acquisition by any Indian PSU 35

  36. Slide 36: San Cristobal

    Slide 36: San Cristobal

    San Cristobal New Acquisition y JV of OVL (40%) and PdVSA (60%) y 146 MMBoe of Oil Reserves y Acquired in April 2008 y Production 32,000 bpd likely to go to 40,000 bpd 36

  37. Slide 37: BC-10 Production through Development

    Slide 37: BC-10 Production through Development

    BC-10 Production through Development y Water Depth 1,400 m to 2,100m. y FPSO, for oil production, floating at 1,780m y Cluster sub-sea development y Surface Blow-out Preventer (SBOP) used y First oil production on 12th July 2009. 37

  38. Slide 38: Equity Oil & Gas

    Slide 38: Equity Oil & Gas

    Equity Oil & Gas 5.06 6.34 7.95 8.80 8.78 CAGR: 14.8% 38

  39. Slide 39: OVL: Financials

    Slide 39: OVL: Financials

    OVL: Financials Highest ever Turnover (Rs.18,144 Cr.) & Net Profit (Rs.2,807 Cr.) 39

  40. Slide 40: Performance MRPL

    Slide 40: Performance MRPL

    Performance MRPL

  41. Slide 41: MRPL: Highlights FY'09

    Slide 41: MRPL: Highlights FY'09

    MRPL: Highlights FY’09 (@-oy-leiavam ¢ 130% (12.59 MMT) Vieliv4-jatelam Highest-ever e Rs. 42,719 Crore (+14%) Turnover Highest-ever e Rs. 1,193 Crore (-6.4%) Fall due to inventory valuation loss 41

  42. Slide 42: MRPL: Financials

    Slide 42: MRPL: Financials

    MRPL: Financials PAT: PAT: down down 6.4% than 6.4% than FY’08 FY’08 (inventory (inventory valuation valuation loss) loss) 42

  43. Slide 43: Performance Q1: FY'10

    Slide 43: Performance Q1: FY'10

    Performance Q1: FY’10

  44. Slide 44: ONGC: Discoveries Q1 FY'10

    Slide 44: ONGC: Discoveries Q1 FY'10

    ONGC: Discoveries Q1 FY’10 7 New Discoveries 3 Prospects 4 Pool Western Onshore 2 Assam Self 1 KG Offshore 1 Western Offshore 1 KG Onland 1 Cauvery Onshore 1 44

  45. Slide 45: ONGC: Production Q1 FY'10

    Slide 45: ONGC: Production Q1 FY'10

    ONGC: Production Q1 FY’10 Oil (MMT) Gas (BCM) Oil (MMT) Gas (BCM) Q1- FY’10 Q1-FY’09 FY’09 Q1- FY’10 Q1-FY’09 FY’09 ONGC 6.12 6.41 25.37 5.75 5.63 22.48 JV (ONGC Share) 0.43 0.43 1.76 0.64 0.76 2.95 Total 6.55 6.84 27.13 6.39 6.39 25.43 45

  46. Slide 46: ONGC: Financials Q1 FY'10

    Slide 46: ONGC: Financials Q1 FY'10

    ONGC: Financials Q1 FY’10 Turnover (Rs. Crore) PAT (Rs. Crore) 46

  47. Slide 47: MRPL: Q1 FY'10 Dispatch

    Slide 47: MRPL: Q1 FY'10 Dispatch

    MRPL: Q1 FY’10 Dispatch (MMT) 47

  48. Slide 48: MRPL: Q1 FY'10

    Slide 48: MRPL: Q1 FY'10

    MRPL: Q1 FY’10 Turnover (Rs. Crore) PAT (Rs. Crore) 10,747 6,170 48

  49. Slide 49: Initiatives

    Slide 49: Initiatives

    Initiatives

  50. Slide 50: Recent Discoveries

    Slide 50: Recent Discoveries

    Recent Discoveries Since 2003 No. of new discoveries: 117 117 discoveries 50

  51. Slide 51: Arresting decline

    Slide 51: Arresting decline

    Arresting decline Natural decline arrested to great extent by IOR/ EOR campaign & redevelopment projects Investment more than Rs. 30,000 Crore 14 Projects completed 7 under implementation Cumulative investment: Rs.14,065 Cr. Envisaged investment: Rs. 16,377 Cr. 1. MH North Ph-1 (Dec’2006) 2. MH Sout

  52. Slide 52: Arresting decline

    Slide 52: Arresting decline

    Arresting decline IOR/ EOR Campaign yielding results Incremental gain from IOR/EOR in FY’09: 7.45 MMT Cumulative Gain through IOR/ EOR ~ 48 MMT Offshore Onshore • 15 major fields: Producing 60% of country’s total oil for more than 30 years put on IOR/ EOR. Natural decline of these fields @ about 7%

  53. Slide 53: Arresting decline

    Slide 53: Arresting decline

    Arresting decline ONGC fields defy global trends l d s d fie ered t ure gist ma s re 15 year from 5-30 t i on st 2 6% oduc e la f 1. p r in c o , s s e ra st NGC rea o nt y O i nc c In ted b p e ra o 53

  54. Slide 54: Recognitions

    Slide 54: Recognitions

    Recognitions

  55. Slide 55: Recognitions

    Slide 55: Recognitions

    Recognitions Global Energy Company 2008 #1 E&P Company in the world ONGC 25th in the List of Top Energy Companies in the World Ranked on assets, revenue, profit & ROC 55

  56. Slide 56: Recognitions

    Slide 56: Recognitions

    Recognitions Ranked 402nd nd in the Fortune Global 500 list of 2009 Fortune Global 500 List 2009 Only company from India to figure in the elite list of 40 global companies as per Return on Revenues (27th rank) & Return on Assets (30th rank) 56

  57. Slide 57: Recognitions

    Slide 57: Recognitions

    Recognitions ONGC sweeps Petrofed Corporate Awards 2008 Crowned -“Leading Oil & Gas Corporate of the Year” Leading performance in multiple segments Transparency & Governance, R&D & Innovation, HR & Finance Receives 3 out of 8 awards in Corporate Category “E&P Company of the Year” & “Project Manageme

  58. Slide 58: Recognitions

    Slide 58: Recognitions

    Recognitions SCOPE Meritorious Award for Corporate Governance for the year 2006-07 (awarded in Nov’08) Awarded gold trophy Citation reads “ONGC scripted India’s hydrocarbon saga and is the numero uno E&P company” 58

  59. Slide 59: Concerns

    Slide 59: Concerns

    Concerns

  60. Slide 60: Subsidy payout

    Slide 60: Subsidy payout

    Subsidy payout 28% increase in Subsidy Payout over FY’08 Discount on Impact on (Rs. Crore) sales PAT FY’04 2,690 1,596 FY’05 4,104 2,553 FY’06 11,956 7,210 FY’07 17,024 10,333 FY’08 22,001 13,241 FY’09 28,225 15,798 Q1, FY’10: Rs. 429 Crore; Low crude oil Impact on PAT: Rs. 242 Crore price regime 60

  61. Slide 61: Subsidy payout

    Slide 61: Subsidy payout

    Subsidy payout Realizable Realized Crude Oil Price USD per bbl Rates FY’06 FY’07 FY’08 FY’09 Q1 FY’10 Pre-discount 59.66 66.33 85.54 86.15 60.58 Discount 17.32 22.11 32.64 38.45 2.33 22% Post-discount 42.34 44.22 52.90 47.70 58.25 10% 61

  62. Slide 62: Gas pricing

    Slide 62: Gas pricing

    Gas pricing Tariff Commission recommendation yet to be implemented 62

  63. Slide 63: Growth Prospects

    Slide 63: Growth Prospects

    Growth Prospects

  64. Slide 64: XI Plan outlay

    Slide 64: XI Plan outlay

    XI Plan outlay Group outlay: Rs. 1,30,043 Crore against Rs. 74,060 Crore during X Plan X Plan (2002-07) XI Plan (2007-12) Domestic E&P includes ONGC’s investment for PSC JVs 64

  65. Slide 65: XI Plan outlay

    Slide 65: XI Plan outlay

    XI Plan outlay ONGC, XI Plan outlay*: Rs. 75,984 Crore BE BE Capex in first two years of XI Plan: Rs. 39,471 Crore (52% of total outlay) Capex in first three years estimated to be Rs.60,339 Crore (79% of total outlay) * ONGC: domestic E&P + Integration projects 65

  66. Slide 66: Major E&P projects

    Slide 66: Major E&P projects

    Major E&P projects Major Projects Rs. Crore 1. C-Series fields’ development 3,195 2. B-22 Cluster development 2,323 3. B-193 Clusters development 3,249 4. Heera & South Heera redevelopment 2,305 5. Development of B-46, B-48, B-105 & B-188 1,284 6. MH South redevelopment Ph-II 6,339 7. MH North redev

  67. Slide 67: Envisaged growth

    Slide 67: Envisaged growth

    Envisaged growth Crude oil production 2008-09 (Actual) : 25.4 MMT 2012-13 (Likely) : > 29 MMT Natural Gas production 2008-09 (Actual) : 62 mmscmd 2012-13 (Likely) : > 72 mmscmd 2015-16 (envisaged) : > 100 mmscmd 67

  68. Slide 68: East Coast Hub Development

    Slide 68: East Coast Hub Development

    East Coast Hub Development Development Plan for Oil Discoveries in the East Coast Integrated cluster development G-4-6 for oil discoveries in G-4-6, G-4-6 GS-29-1 GS-29-1, G-4-5, discoveries in KG-DWN-98/2, IB GS-29-1 KG-DWN-98/2-KT-1 Conceptualised in 3 phases Production commencement by 2011 68

  69. Slide 69: Growth Initiatives : Clean Coal

    Slide 69: Growth Initiatives : Clean Coal

    Growth Initiatives : Clean Coal CBM: Coal Bed Methane XI Plan (2007-12) production target: 1.24 BCM ƒ Operating in 5 CBM blocks ƒ FY’09: CBM discovery in Bokaro block ƒ CBM production from Parbatpur, Jharia (Pilot project) expected in this year. 69

  70. Slide 70: Growth Initiatives: Clean Coal

    Slide 70: Growth Initiatives: Clean Coal

    Growth Initiatives: Clean Coal UCG: Underground Coal Gasification y Collaboration with Skochinsky Institute of Mining (SIM), Russia y Site at Vastan, Gujarat selected for first pilot UCG station, after studying 14 Coal seams y 18 bore-holes drilled in the pilot area y Encouraging result obtained by

  71. Slide 71: 50 MW Wind Power Plant

    Slide 71: 50 MW Wind Power Plant

    50 MW Wind Power Plant Commissioned on 6 Sep’08 - in Gujarat ƒ Power to be wheeled to ONGC installations in Gujarat. ƒ 34 units of 1.5 MW each with investment of Rs.307 Crore 71

  72. Slide 72: Energy Centre

    Slide 72: Energy Centre

    Energy Centre ONGC Energy Centre Trust Holistic Research beyond Hydrocarbons ƒ Thermo-chemical reactor for Hydrogen ƒ Geo-bio Reactors x Project for Bio-synthesis of Methanogens in collaboration with reputed Institutes ƒ Fuel Cells x Collaboration with world leader in Proton Exchange Membrane Hon’bl

  73. Slide 73: Integration

    Slide 73: Integration

    Integration ONGC ONGC :: 26% 26% OPaL: ONGC Petro-additions Ltd. GSPC GSPC : : 5%5% SIs & FIs: 69% SIs & FIs: 69% Dual feed cracker & polymer plants. Feedstock: Naphtha stream from Uran, Hazira & C2+ Extraction Plant. Environmental clearance obtained Incorporated on 15.11.2006 503 hectares of land a

  74. Slide 74: Integration

    Slide 74: Integration

    Integration ONGC ONGC :: 46% 46% ONGC Mangalore Petrochemicals Ltd. MRPL MRPL : : 3% 3% To To be tied up: be tied up: 51% 51% Aromatic Petrochemical Complex within Mangalore SEZ for manufacturing paraxylene as ‘value added product’ with MRPL naphtha & aromatic streams as feed stock Environmental cle

  75. Slide 75: Integration

    Slide 75: Integration

    Integration ONGC ONGC :: 50% 50% IL&FS IL&FS : : 26% 26% ONGC Tripura Power Company Ltd GoT GoT : 0.5% : 0.5% IPO/ IPO/ PE :: 23.5% PE 23.5% 726.6 MW (2X363.3) Power Project in Tripura 196 acres of land acquired Incorporated Sept 27, 2004 Environmental clearance received in respect of forest land Ge

  76. Slide 76: Integration

    Slide 76: Integration

    Integration ONGC : 23% DSL: Dahej SEZ Limited GIDC : 26% To be tied up: 51% Proposed SEZ for petrochemical industries with ONGC Incorporated on Notification of multi product SEZ 21.09.2004 received Project cost Master plan Finalized ~Rs. 900 Crore Scheduled Tender for Infrastructure development comp

  77. Slide 77: Integration

    Slide 77: Integration

    Integration ONGC : 26% MSEZ: Mangalore SEZ Limited KIADB : 23% ILFS+KCCI: 51% Proposed SEZ for petrochemical industries with OMPL Incorporated on Notification of multi product SEZ 24.02.2006 received Draft Master plan prepared Project cost ~Rs. 1,500 Crore Environmental clearance received Scheduled

  78. Slide 78: Thank you

    Slide 78: Thank you

    Thank you

Source: Internet Archive copy of ongcindia.com