Vision Lithium, Inc. · TSXV:VLI

Vision Lithium — Investor Presentation (March 2018)

30 slides from Vision Lithium's investor presentation, March 2018

  1. Slide 1: Corporate Presentation

    Corporate Presentation BATTERY MINERAL EXPLORATION MARCH 2018

  2. Slide 2: Forward Looking Statement

    TSXV: VLI — 2 visionlithium.com FORWARD LOOKING STATEMENT Caution regarding forward-looking information: This presentation certain “forward-looking statements” under applicable Canadian securities legislation. Forward-looking statements include, but are not limited to, statements with respect to: th

  3. Slide 3: Vision Lithium Focused on Battery Mineral Exploration

    TSXV: VLI — 3 visionlithium.com VISION LITHIUM FOCUSED ON BATTERY MINERAL EXPLORATION • A junior exploration company focused on exploring and developing high quality battery mineral assets in safe jurisdictions, primarily Canada • Led by skilled and qualified mineral exploration and business profess

  4. Slide 4: Mining Properties

    TSXV: VLI — 4 visionlithium.com Mining Properties Sirmac Dome Lemieux Surface Properties Claims Ownership polygon (Ha) Sirmac 194 100% 10,350 Dome 225 100% 12,056 Lemieux St. 189 100% 3,000 Stephens

  5. Slide 5: Corporate structure

    TSXV: VLI — 5 visionlithium.com Corporate APRIL 14, 2018 structure Shares issued Warrants 78.935,670 41,700,400 Options 4,312,500 Fully diluted 124,948,570 Market capitalization (March 29/18) $38 Million Share price $0.48 52-week low $0.175 52-week high $0.79

  6. Slide 6: Management and Board of Directors

    TSXV: VLI — 6 visionlithium.com MANAGEMENT AND BOARD OF DIRECTORS YVES J. ROUGERIE, B.SC., GEO. President and Chief Executive Officer (Val-d’Or, Quebec) Yves Rougerie, P.Geo. is a graduate of the University of Quebec in Earth Sciences and brings 35 years of experience in the mining exploration and d

  7. Slide 7: Management and Board of Directors (continued)

    TSXV: VLI — 7 visionlithium.com ROBERT C. BRYCE, ING., MBA Director (Val-d’Or, Quebec) Robert C. Bryce, P.Eng., MBA is a graduate of the University of Toronto (B.Sc. Mining Engineering 1960) and of Western University (MBA 1964) withmore than 50 years of practical and executive mining experience at a

  8. Slide 8: Property One: Sirmac Lithium Project

    TSXV: VLI — 8 visionlithium.com PROPERTY ONE SIRMAC LITHIUM PROJECT

  9. Slide 9: Property location

    TSXV: VLI — 9 visionlithium.com Property location

  10. Slide 10: Sirmac Definitive Agreement

    TSXV: VLI — 10 visionlithium.com SIRMAC DEFINITIVE AGREEMENT On December 14, 2017, Vision LIthium announced the signing of a definitive asset purchase agreement for a 100% undivided interest in the Sirmac Lithium Property from Nemaska Lithium Inc. — VLI issued $250,000 cash payment and 15,000,000 co

  11. Slide 11: Sirmac Lithium project

    TSXV: VLI — 11 visionlithium.com Sirmac Lithium project 1 The Sirmac Property consists of 194 mining claims 3 The campaign was very successful with multiple (10,350 hectares) located about 180km NW of intersections over 2% Li2O. One hole intersected Chibougamau, in the province of Québec mineralizat

  12. Slide 12: Nemaska Lithium drilling results

    TSXV: VLI — 12 visionlithium.com Nemaska Lithium drilling results Some of the best diamond drill hole results from Dyke #5 included: • SIR-12-01:1.30% Li2O over 35.05 m, including 2.30% Li2O over 12.35 m • SIR-12-03:1.19% Li2O over 32.35 m, including 2.06% Li2O over 9.0 m • SIR-12-17:1.53% Li2O over

  13. Slide 13: Nemaska Lithium drilling results

    TSXV: VLI — 13 visionlithium.com Nemaska Lithium drilling results The Laurisha Extension (West of Dyke #5). Three holes were drilled: • SIR-12-18:1.27% Li2O over 5.7 m • SIR-12-19:1.50% Li2O over 4.1 m SIR-12-20: 1.69% Li2O over 5.0 m On the North Extension of Dyke #5, a total of 12 holes were repor

  14. Slide 14: Historical resource estimate

    TSXV: VLI — 14 visionlithium.com Historical resource estimate Cut-Off Grade Category T o n n a g e ( t ) (1)(3) Average Grade A v e r a g e G r a d e T a 2O 5 L i 2O % (1) (1)(2) L i 2O % (1) ( p p m ) (1)(4) 0.50 Measured 185,000 1.40 70 0.50 Indicated 79,000 1.40 80 0.50 Inferred 40,000 1.10 60 No

  15. Slide 15: Exploration plan

    TSXV: VLI — 15 visionlithium.com Exploration • Conduct close-spaced high resolution Mag survey to better define the geometry and extent of the numerous pegmatite dykes on the plan property • Plan drill program to confirm known mineralization and test other dyke potential • Metallurgy to confirm ore

  16. Slide 16: Property Two: Dôme Lemieux Copper Project

    TSXV: VLI — 16 visionlithium.com PROPERTY TWO DÔME LEMIEUX COPPER PROJECT

  17. Slide 17: Property location

    TSXV: VLI — 17 visionlithium.com Property location

  18. Slide 18: Dôme Lemieux project

    TSXV: VLI — 18 visionlithium.com Dôme Lemieux project 1 The Dome Lemieux property consist of 225map- 3 Easy road access by way of the main highway designated claims totaling 12,056ha, an area of >120 square kilometers. — Recently 16 more (908 ha) have been added 2 The property is located in the Gasp

  19. Slide 19: Dôme Lemieux project

    TSXV: VLI — 19 visionlithium.com Dôme Lemieux project 5 Large land package never been consolidated into 7 Mineralization presents different characteristics that one company, VLI now has a view of the entire are likely related to different genesis. mineralization and structural system — Possible skar

  20. Slide 20: Dôme Lemieux project: two-phase exploration program

    TSXV: VLI — 20 visionlithium.com Dôme Lemieux project A TWO-PHASE EXPLORATION PROGRAM IS PLANNED Phase I: Phase II: • 2,225 m drilling program on Big Pioneer, Dionne, Vein • Verification and assaying if necessary of the #6, Véronique, Guillaume, Eagle Gaspésie and Ruisseau remaining 63 holes drilled

  21. Slide 21: Property Three: St. Stephen Nickel Copper Cobalt Project

    TSXV: VLI — 21 visionlithium.com PROPERTY Three ST. STEPHEN NICKEL COPPER COBALT PROJECT

  22. Slide 22: Property location

    TSXV: VLI — 22 visionlithium.com Property location

  23. Slide 23: St. Stephens project

    TSXV: VLI — 23 visionlithium.com St. Stephens project 1 The St. Stephens property consist of 189 mining 3 Easy year round road access via Provincial Highway claims totaling 3,000 ha, in New Brunswick. 3 and several other asphalt roads that transect the —Nickel Copper Cobalt property 2 Maximum grades

  24. Slide 24: Lithium Ion Batteries

    TSXV: VLI — 24 visionlithium.com LITHIUM ION BATTERIES BATTERY MINERALS SUPPLY DEMAND

  25. Slide 25: Mega factories under construction

    TSXV: VLI — 25 visionlithium.com Mega factories under construction BENCHMARK MINERALS OCTOBER 2017

  26. Slide 26: Battery Grade Lithium 2017-2021: Phase 1 of Lithium Ion Battery Growth

    TSXV: VLI — 26 visionlithium.com BATTERY GRADE LITHIUM 2017 - 2021 PHASE 1 OF LITHIUM ION BATTERY GROWTH BENCHMARK MINERALS OCTOBER 2017

  27. Slide 27: Battery Grade Lithium 2021-2026: The Path to 650GWh

    TSXV: VLI — 27 visionlithium.com BATTERY GRADE LITHIUM 2021-2026: PHASE 1 + PHASE 2 = THE PATH TO 650GWH BENCHMARK MINERALS OCTOBER 2017

  28. Slide 28: Battery Grade Lithium Salts Prices Global Scenario

    TSXV: VLI — 28 visionlithium.com BATTERY GRADE LITHIUM SALTS PRICES GLOBAL SCENARIO BENCHMARK MINERALS AUGUST 2017

  29. Slide 29: Copper Supply Shortage Predicted

    TSXV: VLI — 29 visionlithium.com COPPER SUPPLY SHORTAGE PREDICTED HUDBAY DECEMBER 2017 Copper market moves into a significant deficit anticipated near the end of the decade after last of new supply absorbed

  30. Slide 30: Thank You

    TSXV: VLI — 30 visionlithium.com Thank You CONTACT US AT 514 831 3809 VICTOR . CANTORE @ BAYCAPITALMARKETS . COM

Vision Lithium — Investor Presentation (March 2018) on 6ix