Iluka Resources Limited · ASX:ILU

Iluka Resources — TZMI 2009 Congress

38 slides from Iluka Resources's conference presentation, Oct 22, 2009

  1. Slide 1: Iluka Resources – Past, Present and Future

    Iluka Resources – Past, Present and Future TZMI 2009 Congress David Robb, Managing Director 22 October 2009

  2. Slide 2: Disclaimer – Forward Looking Statements

    Disclaimer – Forward Looking Statements This document contains forward-looking statements that are subject to risk factors associated with exploring for, developing, mining, processing and sale of minerals. Forward-looking statements include those containing such words as anticipate, estimates, shou

  3. Slide 3: South African Origins

    South African Origins Cecil John Rhodes (1853 - 1902) Charles Rudd (1844 -1916)

  4. Slide 4: Australian Origins

    Australian Origins George Renison Bell (1890 - 1958)

  5. Slide 5: Antarctica

    Antarctica’

  6. Slide 6: Iluka 1998

    lluka 1998 ILUKA ILUKA 43.1% _ Australian Overseas CRE pe Non-Mineral Mineral Sands | | Mineral Sands Mineral Sands. Sands * Capel Mining and *Green Cove Springs *North Stradbroke — * Koba Tin (Indonesia) Processing (WA) (Florida, USA) Island (QId) (75%) *Eneabba Mining *Old Hickory *Sierra Rutile ¢

  7. Slide 7: Iluka 2009

    Iluka 2009 P S Total Shareholder Return G t Create en itm In and Deliver te m g Value for Shareholders m r it Co y Responsibility B C A C Customer Employee Value Resources Achievement Leadership P E

  8. Slide 8: Industry Demand Drivers

    Industry Demand Drivers Global GDP vs Pigment since 1972 Pigment/US paint GDP grow th grow th 10.0% 20% 7.5% 15% 5.0% 10% 2.5% 5% 0.0% 0% -2.5% -5% -5.0% -10% -7.5% -15% -10.0% -20% 1972 1975 1978 1981 1984 1987 1990 1993 1996 1999 2002 2005 2008 GDP Pigment (kt) US Paint Source: IMF, Access Economi

  9. Slide 9: Pigment

    Pigment Major Producers Revenue Results % Total Revenue Change (YoY) 20% 10% 0% -10% -20% -30% -40% Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 07 07 07 07 08 08 08 08 09 09 07 07 07 07 08 08 08 08 09 09 07 07 07 07 08 08 08

  10. Slide 10: Ceramics

    Ceramics Opacifier Pricing Trends Nominal US$ / t 1500 1200 900 600 300 0 1985 1987 1989 1991 1993 1995 1997 1999 2001 2003 2005 2007 Opacifier (Europe FOB) Zircon (Australian FOB) Flour (Europe FOB) Source: TZMI and Roskill

  11. Slide 11: Pigment

    Pigment Major Producers Chloride Plants Sulfate Plants 2008 Capacity = 3,166 kt Pigment 2008 Capacity = 2,764 kt Pigment Various Huntsman 10% 14% Kronos DuPont Cristal Global 12% 33% 6% Tronox 4% Kronos 5% Tronox 17% Huntsman Various 6% 71% Cristal Global 22% Source: TZMI

  12. Slide 12: ILUKA

    ILUKA

  13. Slide 13: Key Demand Drivers

    Key Demand Drivers Latest GDP Growth Forecasts Annual Growth Global GDP Growth 6% 5% 3% 2% 0% -2% -3% 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 2006 2008 2010 2012 Global GDP Growth 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 IMF (Octob

  14. Slide 14: Economic Update

    -15 -10 -5 0 5 10 15 20 25 30 0 4 8 12 16 Jan-90 Mar-90 China (%) Jan-92 (%) Mar-92 Annual Growth Annual Growth Jan-94 Mar-94 Jan-96 Mar-96 Jan-98 Mar-98 Source: NSBC, Dragonomics, UBS, CFLP Jan-00 Mar-00 Economic Update GDP Jan-02 Mar-02 Jan-04 Mar-04 Electricity Generating Capacity Jan-06 Mar-06 J

  15. Slide 15: Industry Demand Drivers

    Industry Demand Drivers Pigment/Person vs GDP/Capita (1970-2008) Pigment (kg) / person 0.8 0.7 2000 2008 0.6 1990 0.5 1980 1970 0.4 0.3 5,000 6,000 7,000 8,000 9,000 10,000 11,000 GDP / Capita (Real US$) Source: IMF, TZMI and Artikol

  16. Slide 16: Ceramics

    Ceramics Tile Production Trends Zircon in Glazed Tiles = 335kt (approx) Zircon in Ceramics = 674 kt Zircon in Porcelain Tiles = 335kt (approx) Other* 11% Tableware ROW Sanitaryware Indonesia Global Tiles Produced 8.0 b sqm Mexico 5yr CAGR = 5.5% Turkey India Brazil Tiles 89% Italy Spain China ROW It

  17. Slide 17: China Tile Production Trends

    Ceramics China Tile Production Trends 0.2 40% % Chinese Tile Production (RHS) China Tile Production (% of Total) 0.16 35% Zircon kg / Tile sqm Global Zircon 0.12 Intensity of Use 30% (LHS) 0.08 25% 0.04 20% 0 15% 1980 1983 1986 1989 1992 1995 1998 2001 2004 2007 *Note: Global Intensity of Use = Glob

  18. Slide 18: Italian Tile Production Trends

    Ceramics Italian Tile Production Trends Tiles (million sqm) 700 600 500 400 300 200 100 0 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 Glazed Porcelain - Enamel Porcelain - Non-Enamel Other Source: CWR, Confindustria Ceramica

  19. Slide 19: Closing Slide Closing Statement

    Closing Slide Closing Statement

  20. Slide 20: Project Inducement

    Project Inducement Iluka’s View 100 75 50 Rutile Price (% Change) 25 0 -25 -50 -75 -100 -100 -75 -50 -25 0 25 50 75 100 Zircon Price (% Change)

  21. Slide 21: Major Producers

    0 400 800 1200 1600 2002 ktpa 2003 2004 Source: TZMI 2005 RBM 2006 2007 2008 2002 2003 2004 QIT 2005 2006 2007 Note: 2008 based on Iluka estimates. 2008 2002 2003 Major Producers 2004 2005 Namakwa 2006 2007 2008 2002 2003 2004 2005 KZN 2006 2007 2008 2002 TiO2 2003 2004 Mining and Processing – TiO2

  22. Slide 22: Industry Dynamics

    Industry Dynamics Zircon:TiO2 Ratio mt of TiO2 or Zircon Ratio t Zircon/t TiO2 7.0 0.35 TiO2 Historical Supply Zircon Historical Supply 6.0 0.3 Zircon/TiO2 Ratio All 5.0 Feedstock Producers 0.25 (including J-A) 4.0 0.2 3.0 0.15 Zircon/TiO2 Ratio Excluding Iluka 2.0 0.1 1.0 0.05 0.0 0 1990 1995 2000

  23. Slide 23: Major Producers – Zircon Production

    Major Producers – Zircon Production Zircon produced (ktpa) 2002 2003 2004 2005 2006 2007 2008 RBM 300.3 235.3 219.6 234.2 237.7 239.4 240.0 Namakwa 106.3 93.3 119.1 128.6 128.1 114.5 130.0 KZN - 48.1 49.3 47.0 49.9 34.3 34.0 Iluka MW 130.0 245.7 238.5 203.9 244.6 197.2 167.8 Iluka SW 53.4 55.6 44.3

  24. Slide 24: Commodity Prices

    Commodity Prices 1990 to 2009, US$, Index 2004=100 500 450 400 350 Index 2004=100 300 250 200 150 100 50 0 Jan-90 Jan-92 Jan-94 Jan-96 Jan-98 Jan-00 Jan-02 Jan-04 Jan-06 Jan-08 Gold (US$/oz) Copper (US$/t) Nickel (US$/t) Zinc (US$/t) Lead (US$/t) Rutile (US$/t A us. FOB) Zircon (US$/t A us. FOB) Sil

  25. Slide 25: Iluka Investment

    Iluka Investment Capex and D&A A$m 600 Capex D&A 500 400 300 200 100 0 2003 2004 2005 2006 2007 2008 2009

  26. Slide 26: Murray Basin Stage 2

    Murray Basin Stage 2 ILUKA SOUTH AUSTRALIA eeroken Hill NEW SOUTH WALES Murray Basin Mildura Portland 50 VICTORIA Douglas Mine N Hamitt Ballarat A i e 2 ummon Melbourne Mineral Separation Plant Kilometres a 100

  27. Slide 27: Murray Basin

    Murray Basin Physical Characteristics Mineral Resources 47.8 million tonnes of heavy mineral (HM) Ore Reserves 8.7 million tonnes of HM Average Ore Reserve HM 20.6% Grade Average HM Assemblage 15% rutile 11% zircon Planned Mining and Production Commencement Stage 2 – third quarter 2009 Expected Cape

  28. Slide 28: Jacinth-Ambrosia

    Jacinth-Ambrosia Eucla Basin Tenement Position Source: Iluka

  29. Slide 29: Jacinth-Ambrosia

    Jacinth-Ambrosia Physical Characteristics Mineral Resources 9.5 million tonnes of HM Ore Reserves 6.4 million tonnes of HM Avg Ore Reserve HM Grade 6.5% Avg HM Assemblage 50% zircon 28% ilmenite 5% rutile Planned Commencement First half 2010 Expected Capex <$400 million Expected Mine Life Ten years

  30. Slide 30: Murray Basin Stage 2

    Murray Basin Stage 2 ILUKA

  31. Slide 31: Jacinth - Ambrosia

    Jacinth - Ambrosia

  32. Slide 32: 2007 Asset Configuration

    2007 Asset Configuration Largely Old / Short Life Non Integrated Asset Base MSP = Mineral Separation Plant HMC = Heavy Mineral Concentrate SR = Synthetic Rutile SSC = South Secondary Concentrator

  33. Slide 33: 2011-2013 Asset Configuration

    2011-2013 Asset Configuration Expected Asset Configuration 1 Expected to complete 2011 with Douglas MUP/WCP decommissioned/redeployed 2 Expected to complete 2013 with Concord MUP/WCP decommissioned/redeployed 3 Potential mine development, subject to Board approval. Indicative timing: 2013 commenceme

  34. Slide 34: Antarctica

    Antarctica’

  35. Slide 35: Iluka Investment: Exploration Expenditure

    Iluka Investment Exploration Expenditure A$m 25 Expensed Capitalised 20 15 10 5 0 2003 2004 2005 2006 2007 2008 2009 Notes: Forecasts indicative only, based on 2009 Corporate Plan

  36. Slide 36: ILUKA

    ILUKA

  37. Slide 37: Product and Technical Development

    Product and Technical Development Sales and Marketing Victor Hugo Chris Cobb General Manager, General Manager, Product and Technical Development Sales and Marketing

  38. Slide 38: Iluka Resources – Past, Present and Future

    Iluka Resources – Past, Present and Future TZMI 2009 Congress David Robb, Managing Director 22 October 2009 www.iluka.com

Iluka Resources — TZMI 2009 Congress on 6ix