Venus Metals Corporation Limited · ASX:VMC
Venus Metals — Investor Presentation (September 2007)
14 slides from Venus Metals's investor presentation, September 2007
Slide 1: Venus Resources (ABN 99 123 250 582)
ABN 99 123 250582
Slide 2: Disclaimer
Disclaimer • This presentation has been prepared by Venus Resources Limited (ABN 99 123 250 582) (“Venus”) based on information available to it. No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and concl
Slide 3: Exploring for Proterozoic Aged Diamond Bearing Lamproite Pipes under Devonian Cover
Exploring for Proterozoic Aged Diamond Bearing Lamproite Pipes under younger Devonian Cover Rocks north of the Argyle Diamond Mine
Slide 4: Venus Resources Location Plan
Venus Resources Location Plan “Nearology” Factor…..Tenements adjacent to Argyle Mining Lease
Slide 5: Venus Resources Tenement Location Plan
Venus Resources Tenement Location Plan The Argyle North tenement area is secured by EL80/3253, a 224 km2 area located 20 km north of the Argyle Diamond Mine and covering 31 km of Nth-Sth strike. Argyle Mining Lease
Slide 6: Company Details Directors and Management
Company Details Directors and Management • Shares on Issue : 25,237,501 • Terry Hogan (Chairman) • Options (ex 20/25c) : 7,100,000 • Simon Coxhell (Exec Director) • Top 20 hold : 17,793,858 (70.50%) • Matthew Hogan (Director) • Current Share Price : 70 cents • Craig Rosendorff (Director) • Year Low
Slide 7: Achievements to Date
Achievements to Date • Native Title Negotiations to commence exploration successfully completed • On Ground Heritage Survey completed (no sites of significance) • Programme of Work lodged with DOIR. Approved • DIA Negotiations concluded. Approved • 30 kilometres of Access Tracks Completed • Drill Ri
Slide 8: Devonian Cover Rocks: Venus Tenement E80/3253
Devonian Cover Rocks: Venus Tenement E80/3253 Younger rocks cover approximately 80% of the Venus tenement and cover the northerly extension of the Glenhill Fault system
Slide 9: Drill Targets on Aerial Photo
Drill Targets on Aerial Photo 2 km
Slide 10: Target 1 and Geological Model
Target 1 and Geological Model
Slide 11: Spine of Quartz Breccia adjacent to Target 1
1430 ppm Barium Spine of Quartz Breccia adjacent to Target 1 and location of anomalous geochemistry result
Slide 12: Traditional Owners of E80/3253 during Heritage Clearance Survey
Traditional Owners of E80/3253 with Matthew Hogan during Heritage Clearance Survey
Slide 13: Drill Access tracks over Target 1: Drill Ready
Drill Access tracks over Target 1: “Drill Ready”
Slide 14: Game Plan Second Quarter 2007
Game Plan Second Quarter 2007 • Commence Drilling Mid September • 6 Targets • Approximately 4000 metres of RC Drilling • Drill Through Devonian Cover (50-100m?) • Testing Underlying Proterozoic Rocks • Geochemistry and Petrology • Other elements: Uranium ? • Results due: Late November/Early December
Venus Metals — Investor Presentation (September 2007) on 6ix