  1. Slide 1: Results NFS SDR 15-16 & recent evolutions

    Results NFS SDR 15-16 & recent evolutions TF iSR 16-17 2 september 2015

  2. Slide 2: 1. Results NFS SDR 15-16

    1. Results NFS SDR 15-16 Customer Contract Check (can be requested at any time!) 213 CCC’s sent proactively by DSO’s to the DGU’s having already taken part in a previous NFS (R3DP 2014 or 2015) 122 additional CCC’s delivered on request of DGU’s (directly or via an FSP) Requests for NFS 128 unique EA

  3. Slide 3: 1. Results NFS SDR 15-16

    1. Results NFS SDR 15-16 Results of NFS 126 Green EAN’s 532 MW qualified 0 Orange 1 Red (partially) Reason : requested flexibility volume > contractual connection capacity 0,2 MW not qualified Offers to Elia (from DGU’s) 39 EAN’s 51 MW 3 2015-09-02 - TF iSR 16-17 - Results NFS SDR 15-16 & recent evo

  4. Slide 4: 2. Data services from DSO – SDR 15-16

    2. Data services from DSO – SDR 15-16 Certification process Measurement data of the three last winterperiodes was delivered to Elia and the FSP (if requested and mandated by the DGU) Monthly services Link EAN-FSP-ARP is send to Elia (load and injection EAN) Possibility to update the pool of an SDR-u

  5. Slide 5: 3. Recent evolutions

    3. Recent evolutions Validity of qualification Previously (until R3DP 2015), the qualification of an EAN was void If the EAN was not included in the pool (annex of the contract FSP-DSO) At the expiration date of the Elia product Now (since the recent changes introduced for R3DP 2016), the qualificat