Metro Mining Limited · ASX:MMI

Metro Mining — Investor Presentation (May 2017)

27 slides from Metro Mining's investor presentation, May 10, 2017

  1. Slide 1: Investor Presentation

    Investor Presentation May 2017 1 ASX:MMI

  2. Slide 2: Executive Summary

    Executive Summary Positive Fundamentals, Simple & Compelling Project, Proven Team, Near Term Production & Excellent Investment 1 Bauxite fundamentals & strong price outlook given rising China seaborne demand 2 Simple DSO project well located in Cape York with low operating and logistics costs 3 Comp

  3. Slide 3: Corporate Snapshot

    Corporate Snapshot Capital Structure Share Register Share Price (04-May -17) $0.13 Shares on Issue 1,004.0m Greenstone 20% Market Cap $130M Other Shareholders 41% Options Unlisted 7.5m Balanced Property 20% Cash (18-April-17) $21.5M Unsecured Debt (18-April-17) $15.0M 11% 8% Enterprise Value $124M A

  4. Slide 4: Bauxite Hills Mine Snapshot

    Bauxite Hills Mine Snapshot Location Key Statistics Ownership: Metro (100%) Location: Cape York, Qld Project Overview Commodity Bauxite Product Type DSO Mine Type Surface mining Contained mineral: • Reserves 92.2Mt* • Resources 144.8Mt* Status BFS completed Construction H2 2017 First Production Apri

  5. Slide 5: Simple DSO Project

    Simple DSO Project  Operational simplicity and specialist mining and transhipment contractors enables easy to manage operations  Proven, well known operator TSA to be transhipment contractor and will supply all vessels Mining Clear vegetation & remove overburden Return overburden & replace topsoil

  6. Slide 6: World Class Bauxite Jurisdiction

    World Class Bauxite Jurisdiction  Located in the world class Weipa bauxite region of western Cape York, Qld  90km north of Rio’s Weipa mine and approx 130km from Rio’s Amrun development  Weipa bauxite brand well established and highly regarded in China BHM Weipa Amrun Aurukun Cairns Townsville ~1

  7. Slide 7: Low Logistics Costs

    Low Logistics Costs  Metro’s low cost logistics are a sustainable cost advantage to China relative to competing bauxite producers 7 ASX : MMI | Investor Presentation | May 2017

  8. Slide 8: Existing Infrastructure Benefit

    Existing Infrastructure Benefit  Existing infrastructure provides numerous development advantages Port & Load Out Area Camp Site Airstrip 8 ASX : MMI | Investor Presentation | May 2017

  9. Slide 9: BFS Summary

    BFS Summary Bankable Feasibility Study Highlights*  Completed by MEC Mining in March 2017  6Mtpa steady state (initial 2Mtpa)**  Contract mining and transhipment  8 months per year dry season operation (April to November)  5 month construction period Key Results and Assumptions Description Resu

  10. Slide 10: Strong Cost Curve Positioning

    Strong Cost Curve Positioning  2nd quartile cost curve positioning provides attractive long term competitive advantage China Seaborne Bauxite Supply Cost Curve 2019 – Value-in-use Adjusted US$/Dmt (CFR) 1St Quartile 2nd Quartile 3rd Quartile 4th Quartile 70.0 60.0 50.0 40.0 US$/DMT 30.0 20.0 10.0 0

  11. Slide 11: Near Term Production Pathway

    Near Term Production Pathway Well Established Pathway Early works now underway No Red Flags Production On Track For H1 2018 2014 2015 2016 2017 2018 Activity Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Project Acquisition  DFS for 2Mtpa  Off-Take Agreement  Native Title Agreement Metro  Transhi

  12. Slide 12: Off-take Secured & Attractive

    Off-take Secured & Attractive*  Foundation off-take secured with Xinfa, China’s second largest private bauxite importer  Xinfa off-take covers ~50% of production for first 4 years and has attractive market linked pricing  Strong off-take interest from traders and end users, within and outside of

  13. Slide 13: Proven Management Team

    Proven Management Team  Metro’s Board & management have collectively been involved in the development and operation of over 30 mines globally  Significant bauxite knowledge and expertise, focused on Cape York bauxite operations and product marketing into China  Strategy is to develop and operate

  14. Slide 14: Significant Progress Since BFS

    Significant Progress Since BFS Project Early Works Now Underway Contracts placed for fabrication of piles and associated steel works, and camp Detailed engineering and design contracts awarded for conveyor and barge load out facility Firm bids received for electrical and marine installation Costs to

  15. Slide 15: Native Title & Land Access

    Native Title & Land Access Positive & Supportive Relationships with Local Community Native Title & Land Access Agreement reached jointly with: Key Features of the Agreement include:  Ankamuthi People, the traditional owners; and  Cultural Heritage Management Plan  Old Mapoon Aboriginal Corporatio

  16. Slide 16: Key Structural Change in China

    Key Structural Change in China  China’s seaborne bauxite imports are forecast to grow from ~50mtpa in 2015 to ~150mtpa by 2030 Chinese Aluminium Production & Growing Seaborne Bauxite Demand Declining Chinese Bauxite Reserve Life Years 50.0 Imported Alumina as Bauxite Imported Bauxite 60 53 Domestic

  17. Slide 17: Positive Bauxite Price Outlook

    Positive Bauxite Price Outlook  Bauxite has experienced relatively steady and positive price growth since the GFC with growing Chinese demand to support longer term price growth CM Group historic CBIX price & forecast USD$/DMT CFR 80.0 CM Group CBIX CM Group CBIX Forecast 70.0 60.0 50.0 40.0 30.0 2

  18. Slide 18: Regional Exploration

    Regional Exploration  Metro’s exploration exposure covers >2,500km2 of regional tenement holdings (including Bauxite Hills)  All tenements are well located on the lateritic plateaus that host bauxite mineralisation  Close proximity to the coast  Potential to duplicate Bauxite Hills – organic gro

  19. Slide 19: Project Financial Metrics

    Project Financial Metrics After-Tax NPV10 After-Tax IRR Initial CAPEX A$601Million 81% A$35.8Million Average Annual EBITDA A$145Million Initial LOM LOM EBITDA LOM Average on-site costs 17 Year A$2.5Billion A$16.42/t Metro Market Cap = A$130 Million 19 ASX : MMI | Investor Presentation | May 2017

  20. Slide 20: Summary

    Summary Metro is Well Positioned & Compelling 1 Strong bauxite fundamentals driven by structural change in China 2 Metro has significant advantages and is backed by leading investors 3 Compelling BFS metrics provides significant share price upside 4 Financing strategy well advanced & early works now

  21. Slide 21: Background Slides

    Background Slides 21 ASX : MMI | Investor Presentation | May 2017

  22. Slide 22: Board of Directors

    Board of Directors Stephen Everett  Chemical engineer with 40+ years experience in the resources and construction industries both in Australia and overseas Chairman  Formerly Chair of BeMaX Resources, Australian Solomons Gold, JMS Civil &Mining & IronRidge Resources  Mining executive with +30 yea

  23. Slide 23: BFS Capital Cost Estimates

    BFS Capital Cost Estimates* Capital Cost Item Amount Capital Cost Item Amount Initial Capital Expansion Capital (in years 2 and 3) Integrated Truck dump and Site establishment and haul A$3.1M screens and upgraded haul A$13.9M roads roads Key infrastructure including BLF A$25.8M Transhipment upgrades

  24. Slide 24: BFS Operating Cost Estimates

    BFS Operating Cost Estimates* Operating Cost Item BFS LOM Average Mining, haulage and operation of BLF A$7.07/t Transhipment activities A$6.71/t Site and administrative costs A$2.65/t Total Operating Costs (ex-royalties and ocean freight) A$16.42/t Royalties A$6.57/t Ocean Freight A$11.71/t Total Op

  25. Slide 25: Reserves & Resources

    Reserves & Resources* Bauxite Hills – DSO Mineral Resource &Ore Reserve Estimates DSO Bauxite Qualities (Dry Basis) Area Category DSO2 Tonnes (Mt)1 Total Al2O3 (%) Total SiO2 BH1 & BH6 Measured Resource 54.7 50.0 11.9 BH1, BH2 & BH6 Indicated Resource 66.4 49.2 14.5 BH1 & BH6 Inferred Resource 23.7

  26. Slide 26: Disclaimer

    Disclaimer FORWARD LOOKING STATEMENT Statements and material contained in this ASX Announcement, particularly those regarding possible or assumed future performance, production levels or rates, commodity prices, resources or potential growth of Metro Mining Limited, industry growth or other trend pr

  27. Slide 27: For Further Information

    For Further Information Contact: Simon Finnis – Chief Executive Officer & Managing Director Finance & Business Development – Duane Woodbury 27 Ph: +61 (0) 7 3009 8000 Head Office: Lvl 2, 247 Adelaide Street, Brisbane Q 4000 GPO Box 10955, Brisbane Q 4000