Slide 2: Generating power from waste heat & biomass with zero emissions
OTCQB : CETY A better cleaner and environmentally sustainable future Generating power from waste heat & biomass with zero emissions
Slide 3: The Company Mission
The Company Mission To be the leading company in designing, building & marketing clean energy products & solutions focused on energy efficiency & environmental sustainability. Confidential 3
Slide 4: Company Highlights
Company Highlights • Strong Sales pipeline o US, United Kingdom, Spain, Belgium, Turkey, Hungary, Pacific Islands, Russia, and China. • Optimistic revenue projections for 2021 • Joint Ventures, cross sales & distribution agreements o Technology and solution diversification supporting growth and scal
Slide 5: Company History
Company History Founded as an electronics product design & manufacturing company, the company repositioned itself in 2015 to focus on clean energy and related technologies. Acquisitions, OEM Agreements, IP Development, Equity Commercial Opportunities Overview of historic milestones 2020: • Continued
Slide 6: The Challenge
The Challenge Billions of dollars worth of heat is wasted every year. “20 to 50% of industrial energy input is lost as waste heat.”1 It’s found at industrial facilities, high rise buildings, & biomass plants, … And at power generation & microgrid facilities ~3/5 of the primary energy used in power p
Slide 7: Value Proposition – Why not turn the heat into power?
Value Proposition – Why not turn the heat into power? Heat is Money! Cleaner power Quickly add generation capacity with no added fuel, no added emissions Base-load generation Typically, 24x7 operation; little to no grid balancing required Low maintenance often be done by existing site personnel; unm
Slide 8: The Solution: Product Competitive Advantage
The Solution Clean CycleTM Magnetic Bearing Generator • Generates 1 GWh of electricity per year from waste heat. • Reduces approximately 350 metric tons of CO2 depending on the application Product Competitive Advantage • Best-in-class technology with 14% efficiency, versus 8% industry average; • Pat
Slide 9: Existing Patents
Existing Patents Country Application Number Patent Number Title Application Date Issue Date Expiration Date US 11/735854 8839622 FLUID FLOW IN A FLUID EXPANSION SYSTEM 4/16/2007 9/23/2014 4/16/2027 EP 08745846.9 2147194 Fluid Flow in a Fluid Expansion 10/12/2009 8/5/2015 4/15/2028 DE 08745846.9 2147
Slide 10: Customer Profiles
Customer Profiles • Landfill Operators – Landfill gas (LFG) o Waste heat from flare stack o Waste heat from biogas engines • Wastewater Treatment Plants o Waste heat from biogas engine • Industrial Facilities o Factories (i.e., cement, glass, steel, etc.) • Combined Heat to Power Applications from E
Slide 11: Current Installations
Current Installations APPLICATIONS REGION UNITS BIOMASS/ DIESEL TURBINES INDUSTRIAL LANDFILL EUROPEAN UNION 68 65 3 EASTERN EUROPE 11 11 NORTH AMERICA 17 12 1 4 LATIN AMERICA 1 1 PACIFIC 4 4 TOTAL 101 88 4 5 4 Confidential 11
Slide 12: Applications
APPLICATIONS > 100 units installed / >1 million fleet operating hours. Some examples include: Diesel Reciprocating Engines Gas Reciprocating Engines Biomass Often 10+ engines per site Landfill & biogas applications Wood & harvest waste 1 unit on CAT diesel 1 unit on 2 GE engines 2 units on biomass b
Slide 13: Pacific Island reciprocating engine installation
2 units on 2 reciprocating engines on a Pacific Island ($2.3M Lease over 10 years) • ( Annual ~1.5GW of Elec. Power) • Pay as you save model over 10 years • Dispose ~3.5M liters of fuel (Displace 10K tons of CO2)
Slide 14: Woolwich Bio-En (Ontario/Canada)
Woolwich Bio-En (Ontario/Canada) Two digester gas fired 1426 kW (Jenbacher 420) CHP units under a Feed-In-Tariff (FIT) contract. Installed 140 kW Clean Cycle II (Completed Nov. 2018) Annualized Electricity Savings 890,330 kWh Confidential 14
Slide 15: Waste-to-Energy Plant (Lebanon, Tennessee)
Waste-to-Energy Plant (Lebanon, Tennessee) 64 Tones/day downdraft gasification system on one-acre facility • Input: Waste wood, producing Syngas to heat water, which drives the CETY Clean Cycle II. • Output: Total output capacity of 420 Kw/Hour that offsets the electrical usage at the waste water tr
Slide 16: 1540 Broadway, 1.3M Sq-ft High Rise (New York City)
1540 Broadway, 1.3M Sq-ft High Rise (New York City) 1.5 MW Combined Heating and Power (CHP) system • Self Generation while reducing the buildings carbon footprint utilizing CETY Clean Cycle 140kW waste heat recovery. • Heat Recovery Incentives for the building owners and management companies with su
Slide 17: CETY / ENEX Waste to Energy Power Plants
CETY / ENEX Waste to Energy Power Plants Confidential 17
Slide 18: Market Validation – Why Now?
Market Validation – Why Now? • USA o A clean energy revolution is taking place across America, o Moving forward, the Energy Department will continue to drive strategic investments in the transition to a cleaner, domestic and more secure energy future. • Europe o Targets for 2030 to reach a reduction
Slide 19: California Policy and Incentives
California Policy and Incentives • California State Bill o Generate 100% of its electricity by renewable sources by 2045. o SB 100 (Renewable Electricity Policies) ✓ 60% Renewable Energy by 2030; ✓ 100% by 2045 o SB 32 (Climate Policies) ✓ 40% reduction in GHG emission by 2030 (SB 32) ✓ 20% reductio
Slide 20: Waste Heat to Power Investment Tax Credit (ITC)
Waste Heat to Power Investment Tax Credit (ITC) • December 21, 2020, Congress passed the Consolidated Appropriations Act, 2021 enacted waste energy recovery Sec. 48 Investment Tax Credit: • Extended Investment Tax Credit out two years, including Waste Heat to Power • Provides a dollar-for-dollar off
Slide 21: Market Size – Bottom Up
Market Size – Bottom Up • USA (Cogeneration & OEM Opportunity) o 2G - < 500 installed MWM engines, 100 engine potential ~$30M o Vertical markets, hospitals, incentives, independence from district heat, 50 systems ~ $15M o Landfill opportunities, 100 systems ~ $30M o BioMat Tariff in California or ot
Slide 22: Capital Requirement
Capital Requirement Capital Requirements and Use of Proceeds Growth Capital Requirements Global Sales and Marketing $ 3,000,000 Operating Capital $ 3,000,000 Service Center and Commissioning $ 2,000,000 R&D, JV, COGEN, Patent Support $ 2,000,000 Capital Requirement $ 10,000,000 Raise at a discount t
Slide 23: Heat is Money!
Heat is Money! For additional question please contact: Kam Mahdi at [email protected] T: 949-273-4990 X 814 QUESTIONS? www.heatrecoverysolutions.com www.cetyinc.com