Ctp N.v. · EURONEXT:CTPNV

Ctp — Investor Presentation (December 2022)

32 slides from Ctp's investor presentation, December 2022

  1. Slide 1: Building

    Building

  2. Slide 2: Vlněna is a new office, retail and lifestyle campus

    Vlněna is a new office, retail and lifestyle campus, bridging Brno’s historical centre with the developing South Brno commercial zone.

  3. Slide 3: Modern design and state-of-the-art technical solutions

    The most modern design and the-state- of-the-art technical solutions including smart office spaces of the BUILDING in Vlněna are atrractive for major multi- nationals or other prestigeious brands looking to establish a HQ in Brno.

  4. Slide 4: Overview

    Overview Building TOTAL OFFICE SPACE NUMBER OF FLOORS ABOVE GROUND 8,850 m2 16 TYPICAL OFFICE AVAILABILITY FLOOR FROM 700 m2 149 m2 Q4 2023

  5. Slide 5: Features

    Features Building ACCESSIBILITY FLOORS Central reception Kitchenettes 24/7 security Wheelchair access Smart access system Opennable windows Magnetic cards access Individual heating & cooling PARKING TECHNOLOGY OTHER Underground parking Smart office spaces Canteen & Amenities Reservation system IoT R

  6. Slide 6: Sustainability

    Sustainability Building BREEAM RAINWATER CERTIFICATE COLLECTION OUTSTANDING BLUE GREEN GREY WATER EXTESIVE OWN WATER ELEMENTS USABILITY GREEN ROOF SOURCE WELL

  7. Slide 7: Smart Office Spaces (to choose)

    Smart Office Spaces Building (to choose) TYPE/FUNCTION BASIC / STANDARD SMART 1 / ABOVE STANDARD SMART 2 / ABOVE STANDARD MULTIFUNCTIONAL Button with display Remote control CONTROL PANEL (analog) (including a mobile application) LIGHTS LED lights with DALI control Addition of sensors and control Cha

  8. Slide 8: Building

    Building

  9. Slide 9: Siteplan

    Siteplan Mlýnská Building E 2 D BOCHNER 4 PALACE C Ponávka Stream F Přízova Y 1 B 5 G A Vlněna X H K na Vlně Dornych 1 Courtyard Buildings ABCDEFGH & Bochner Palace 2 Old Mill House Building (Under construction) Clubco Garden 5 Residences KXY (Planned) 4 Sport Court Underground Parking / Charging St

  10. Slide 10: Building Types

    Building Types ABCD IQ Buildings E Side Street Bochner FGH Palace

  11. Slide 11: Building Types

    Building Types Building

  12. Slide 12: Building Elevation

    Building Building Elevation 61 m Floor 15 Building E Floors 7 — 14 Typical upper floor 27 m Floor 6 Floors 2–5 Typical floor Floor 1 Ground floor

  13. Slide 13: Building Elevation - West View

    Building Building Elevation West View

  14. Slide 14: Building Elevation - East View

    Building Building Elevation East View

  15. Slide 15: Building Elevation - North View

    Building Building Elevation North View

  16. Slide 16: Building Elevation - South View

    Building Building Elevation South View

  17. Slide 17: Floor Plans - Ground floor

    Floor Building Plans Ground floor Retail floor Reception / Lobby Retail A 195 m2 Retail B Dornych ul. 65 m2 Vlněna ul.

  18. Slide 18: Floor Plans - Terrace floor

    Floor Building Plans Floor 1 Terrace floor Terrace 140 m2 Office Dornych ul. 149 m2 Vlněna ul.

  19. Slide 19: Floor Plans - Typical floor

    Floor Building Plans Floors 2–5 Typical floor Office 555 m2 Dornych ul. Vlněna ul.

  20. Slide 20: Floor Plans - Terrace floor

    Floor Building Plans Floor 6 Terrace floor Terrace 209 m2 Office 260 m2 Dornych ul. Vlněna ul.

  21. Slide 21: Floor Plans - Typical upper floor

    Floor Building Plans Floors 7 — 14 Typical upper floor Office 701 m2 Dornych ul. Vlněna ul.

  22. Slide 22: Floor Plans - Roof floor

    Floor Building Plans Floor 15 Roof floor Terrace 81 m2 Office 341 m2 Dornych ul. Vlněna ul.

  23. Slide 23: Technical Specification

    Technical Building Specification BASIC DATA Land owner CTP Vlněna Business Park, spol. s r.o. CTPark Humplolec 1571 Humpolec 39601 Building I Number of floors 16 upper floors Floor area 8,850 sqm of rentable area Parking 1 underground floor for parking GENERAL TECHNICAL DATA Structural system In-sit

  24. Slide 24: General Technical Data - Load

    GENERAL TECHNICAL DATA Load Typical floors – offices 300 kg/m2 Local areas for servers – 600-700 kg/m2 (close to shorter sides of concrete cores) Reserve for load of partitions 150 kg/m2 Permanent load typical floor Concrete: 1,75 Double floor: 0,50 Ceiling: 0,10 Technologies:0,20 Partitions: 0,65kN

  25. Slide 25: General Technical Data - Reception and Entrance Hall

    GENERAL TECHNICAL DATA Reception and Entrance Hall Finishes in the entrance hall are made of high standard materials. (continued) The hall to be equipped with contemporary designed furniture and an artwork when appropriate. The main staircase for connection between the ground floor Staircase and the

  26. Slide 26: External Areas and Interior Finishes

    Lifts (continued) Cabin interior: - Cabin corners – mirror, width ¼ of rear side of cabin - Wood cladding panels - Floor – marble “Grigio” - Lights: Indirect light around the ceiling EXTERNAL AREAS External areas All external areas, i.e. access communications, pavements etc. meet the general require

  27. Slide 27: Interior - Final Structures and Materials

    INTERIOR – FINAL Toilets High standard finishes. Number according to CZ standards. STRUCTURES AND MATERIALS Outer (perimeter) partitions: double gypsum board from the floor (FINISHING) to concrete ceiling Inner partitions: standard one (single, up to suspending ceiling). Walls + floor: ceramic tilin

  28. Slide 28: Interior - Technology: Air-handling

    INTERIOR – TECHNOLOGY Air-handling (continued) Interior conditions: Air temperature: - Heating season 22°C +/-1,0°C - Outside heating season 24,5°C +/- 1,5°C - Fresh air supply – office (permanent working place 36 m3/h.prs (8 m2/prs) - Office (meeting room) 36 m3/h.prs (2,5 m2/prs) - Retail 36 m3/h.

  29. Slide 29: Interior - Technology: Back-up and Lighting

    INTERIOR – TECHNOLOGY Back – up Diesel-generator on the underground floor in neighbouring building. Total reserved capacity for clients – 400kVA/320kW. Lighting/ Lighting requirements: offices 500 lux halls 200 lux reception 300 lux parking 125 lux Sockets/ Lights are embedded in the suspended ceili

  30. Slide 30: Access for Employees / Visitors

    ACCESS FOR EMPLOYEES / Location/ Easy access VISITORS Direct access from Dornych Street 3 min. walking distance from the Man Train Station, Main Bus Station and Main Tram station. Main entrance Access from the parkings from underground parkings directly to a reception from outside parking through ma

  31. Slide 31: CTP — A Trusted Partner

    CTP — A Trusted Partner CTP is continental Europe’s largest owner, developer and manager of logistics and industrial real estate by gross lettable area, with over 9.5 million m2 of space under ownership in ten countries as at 31 December 2021. CTP is the only developer in the Central and Eastern Eur

  32. Slide 32: Commercial Contact

    Commercial Contact For more information Petr Jurza visit our websites Business Developer vlnena.eu +420 602 141 490 ctp.eu [email protected]

CTP — Investor Presentation (December 2022) on 6ix