Greenland Mines — Investor Presentation (October 2026)

20 slides from Greenland Mines's investor presentation, October 2026

  1. Slide 1: Rare by nature.

    Greenland Mines N AS DAQ GRML I N V E S T O R P R E S E N T AT I O N Rare by nature. Developing Greenland’s rare earths and precious metals for the industries that depend on them. 46 79 78 60 59 Pd Au Pt Nd Pr Greenland Mines / Investor presentation 01 / 20

  2. Slide 2: An Arctic position. A wider industrial significance.

    Greenland G R E E N L A N D / T H E S T R AT EG I C S E T T I N G Mines A R C T I C S EC U R I T Y / I N D US T R I A L R ES I L I E N C E An Arctic position. A wider industrial significance. Greenland sits between Europe and North America. Its established security role and mineral potential place i

  3. Slide 3: A global industry. A concentrated supply.

    Greenland R A R E - E A R T H S U P P LY / C H I N A · 2 0 2 4 Mines S U P P LY C O N C E N T R AT I O N A C R O S S T H E C H A I N A global industry. More diverse mineral sources are part of the A concentrated supply. answer. Resilient supply also requires separation, refining, and magnet manufact

  4. Slide 4: Greenlandic resources. A transatlantic strategy.

    Greenland N O R T H AT L A N T I C C R I T I C A L M E T A L S C O R R I D O R / C O M PA N Y S T R AT EGY Mines R E S O U R C E S / P R O C E S S I N G / I N D US T R I A L M A R K E T S Greenlandic resources. A transatlantic strategy. Greenland’s mineral potential sits between two major industrial

  5. Slide 5: Precious metals. Magnet rare earths.

    Greenland THE PORTFOLIO / NASDAQ: GRML Mines O N E C O M PA N Y. T W O G EO L O G I C A L SYS T E M S . Precious metals. Magnet rare earths. 01 S O U T H E AS T G R E E N L A N D 02 S O U T H W ES T G R E E N L A N D Skaergaard Sarfartoq Pd / Au / Pt Nd / Pr A large layered intrusion hosting palladi

  6. Slide 6: Two coasts. Distinct geology.

    Greenland T H E P R O J E C T AT L A S / G R E E N L A N D Mines T W O C O A S T S / D I S T I N C T G EO L O GY Two coasts. ARCTIC OCEAN Distinct geology. Sarfartoq’s rare-earth carbonatite lies in southwest Greenland. Skaergaard’s palladium–gold–platinum intrusion lies on the southeast coast. KALA

  7. Slide 7: Decades of work. A substantial foundation.

    Greenland T H E W O R K A L R E A DY B E H I N D T H E P R O J E C T S Mines RESEARCH / DRILLING / TECHNICAL STUDIES Decades of work. A substantial foundation. Successive programs have built the geological knowledge that the next phase draws upon. Skaergaard 1930s 1986–2021 2026 42,050 Scientific st

  8. Slide 8: The materials behind the magnet.

    Greenland 02 / SARFARTOQ Mines N EO DY M I U M / P R A S EO DY M I U M / M A G N E T R A R E E A R T H S The materials Nd Pr + behind the magnet. C OMPL ET ED / SEPT EMBER 2026 01 I N D I CAT E D INFERRED Fieldwork & sampling 6.9 At 1.60% TREO Mt 5.341 At 0.96% TREO Mt Geological mapping, outcrop su

  9. Slide 9: A resource in Greenland. A relationship in Europe.

    Greenland S A R FA R T O Q / N EO P E R F O R M A N C E M AT E R I A L S Mines A N E X I S T I N G R E L AT I O N S H I P / A P OT E N T I A L P R O C ES S I N G PAT H WAY A resource in Greenland. A relationship in Europe. N EO ’S R E TA I N E D O F F TA K E R I G H T S 60 ARCTIC OCEAN Silmet KALAAL

  10. Slide 10: An economic framework. A basis for the next studies.

    Greenland S A R FA R T O Q / I N I T I A L AS S ES S M E N T Mines S T 1 / E F F EC T I V E J U LY 3 1, 2 0 2 6 An economic framework. A basis for the next studies. The Initial Assessment models a nine-year operation. Base and high-case sensitivities show the importance of prices, costs, and geologi

  11. Slide 11: A defined resource. The next level of detail.

    Greenland S A R FA R T O Q / D E V E LO P M E N T P R O G R A M Mines D E F I N E D R ES O U R C ES / P R E L I M I N A RY AS S ES S M E N T / N E X T S T U D I ES A defined resource. The next level of detail. A preliminary Initial Assessment and updated resource provide the starting point for the n

  12. Slide 12: Precious metals. Remarkable scale.

    Greenland 01 / SKAERGA ARD Mines PA L L A D I U M / G O L D / P L AT I N U M Precious metals. Remarkable scale. A large, layered intrusion with defined palladium, gold, and platinum resources. New field data and recovery studies build on that foundation. I N D I CAT E D INFERRED 15.00 Moz 17.49 Moz

  13. Slide 13: The fieldwork is complete. The next questions are technical.

    Greenland S K A E R GA A R D / 2 0 2 6 F I E L D P R O G R A M Mines F I E L DWO R K C O M P L E T E D / R E P O R T E D O C T O B E R 1, 2 0 2 6 The fieldwork is complete. The next questions are technical. 4,480 Diamond drilling m 17 Completed holes >100 Bulk material collected t 01 02 03 Resource

  14. Slide 14: Inside the component. Into everyday life.

    Greenland M AT E R I A L S / I N D US T R I A L A P P L I CAT I O N S Mines M OT I O N / E M I S S I O N S C O N T R O L / E L EC T R I CA L P E R F O R M A N C E Inside the component. Into everyday life. Nd · Pr Pd · Pt Au Move the machine. Transform the exhaust. Protect the connection. Permanent m

  15. Slide 15: A strategic interest. A wider materials opportunity.

    Greenland A N O R T EC H / S T R AT EG I C EQ U I T Y I N V ES T M E N T Mines A N O R T H O S I T E / M AT E R I A L S R ES E A R C H A strategic interest. A wider materials opportunity. Anorthosite. A broader materials opportunity. 01 Alumina AnorTech’s Gronne Bjerg project hosts anorthosite, a pl

  16. Slide 16: Capital for the next phase.

    Greenland C O R P O R AT E P L AT F O R M / CA P I TA L Mines CA P I TA L F O R T H E N E X T P H AS E Capital for the next phase. CA P I TA L R A I S E D / R E P O R T E D S E P T E M B E R 2 9, 2 0 2 6 01 Project execution US$59m+ Exploration, metallurgical, and engineering work across the Greenla

  17. Slide 17: Corporate leadership. Financial and technical direction.

    Greenland L E A D E R S H I P / C O R P O R AT E Mines C O R P O R AT E L E A D E R S H I P Corporate leadership Financial and technical direction. 01 02 03 Dr. Joseph Sinkule Bo Møller Stensgaard, Jeffrey LeBlanc Ph.D. Chief Executive Officer & Chairman President Chief Financial Officer An executiv

  18. Slide 18: Geological depth. Experience on the ground.

    Greenland L E A D E R S H I P / T EC H N I CA L & G R E E N L A N D Mines T EC H N I CA L E X P E R T I S E / LO CA L K N OW L E D G E Geological depth Experience on the ground. 01 Dr. Gustavo Delendatti 02 Jakob Kløve Keiding, Ph.D. Vice President, Exploration Chief Geologist A geologist with more

  19. Slide 19: The next catalysts. The decisions they enable.

    Greenland THE NEX T CHAPTER Mines C O M P L E T E D WO R K / N E X T T EC H N I CA L D EC I S I O N S The next catalysts. The decisions they enable. Work completed in the field now feeds the next technical decisions. These are the milestones to follow. S A R FA R T O Q I N P L AC E N E X T CATA LYS

  20. Slide 20: Technical basis. Investor information.

    Greenland T EC H N I CA L N OT ES / I N V ES T O R I N F O R M AT I O N Mines R E A D A LO N G S I D E T H E O R I G I N A L D I S C LO S U R ES Technical basis. Investor information. Resources are not reserves Development and transactions Mineral resources do not demonstrate economic viability. Inf