  1. Slide 1: Acquisition of Yulleroo 4 Cement Bond Log

    Acquisition of Yulleroo 4 Cement Bond Log www.buruenergy.com August 2015

  2. Slide 2: Proposed Work at Yulleroo 4

    Proposed Work at Yulleroo 4 Background • The Buru Energy/Mitsubishi joint venture (JV) are the holders of exploration permit EP436, where the Yulleroo 4 well is located • Between January and March 2013, the Y4 well was drilled to a depth of 3,846m. • The Yulleroo 4 well has 3 sets of steel casing ce

  3. Slide 3: What is a Cement Bond Log?

    What is a Cement Bond Log? What is a Cement Bond Log (CBL)? • It is a routine well operation that records the cement bond of the well casing. • It works just like a medical ultrasound. • A pipe containing the ultrasound device is lowered down the well on a wire. • The wire transmits the readings bac

  4. Slide 4: What is Involved?

    What is Involved? • The CBL at Yulleroo 4 will involve the following equipment and personnel: – CBL measuring device, – 3 trucks, – 1 crane, – 4 light vehicles, – 10 personnel, • The CBL will take about 3 days and will involve reconfiguring the well head to allow the tool to be run. • After the data

  5. Slide 5: Cement bond logging equipment

    Cement bond logging equipment Control Centre (Wireline Unit) Sensor that is lowered down the well on the end of the wire Example of readings from the sensors.

  6. Slide 6: Summary

    Summary • The JV wishes to double check the results of the CBL undertaken in 2013 immediately following drilling of the Yulleroo 4 well. This will be done by re- running the CBL. • The Government want the CBL to be undertaken. • The Yawuru independent specialists also recommended that the CBL be re-