Acdc Metals Ltd · ASX:ADC
Acdc Metals — Investor Presentation (October 2026)
21 slides from Acdc Metals's investor presentation, Oct 26, 2026
Slide 1: Developing critical & precious metal projects globally
rsonal use only Developing critical & precious metal projects globally Investor Presentation | October 2026 ASX: ADC
Slide 2: Important Information and Disclaimer
Important Information and Disclaimer Disclaimer: The material in this presentation has been prepared by ACDC Metals Ltd (“Company”). This This presentation has been prepared by the Company based on information currently available to it. No (“Company”). This presentation may not be reproduced, redist
Slide 3: Investment Highlights
Investment Highlights A resource-backed critical minerals asset, paired with gold-silver discovery upside in Nevada rsonal use only Key Projects Au · Ag · REE Q4 2026 G o schen C entral (V ictoria) - D evelo p m ent Victoria, Australia and Nevada, USA Maiden RC drilling, up to 2,500m M o unt Jackso
Slide 4: Corporate Strategy
Corporate Strategy ACDC Metals is a diversified exploration company advancing the rsonal use only advancing the Goschen Central rare earths and mineral sands sands project in Victoria and gold-silver exploration at Mount Mount Jackson in Nevada’s Walker Lane. A resource-backed critical minerals asse
Slide 5: Project Overview
Project Overview Mount Jackson | Gold & Silver Walker Lane, Nevada, USA rsonal use only • 164 BLM lode claims (~13.3 km²); option to earn up to 100%. • Airborne magnetics defined three target zones; CSAMT survey under way. • BLM permit received: 15 holes, up to 2,500m RC drilling in Q4 CY2026. Gosch
Slide 6: Mount Jackson Project
Mount Jackson Project MOUNT JACKSON | NEVADA, USA ACDC’s first acquisition in the United States, in the Walker Lane Trend of southwestern rsonal use only southwestern Nevada, 25 km from Goldfield. • Right to earn up to a 100% interest; 164 BLM lode mining claims covering ~13.3 km² (3,280 acres) in E
Slide 7: Mount Jackson: epithermal system with scale potential
Mount Jackson: epithermal system with scale potential MOUNT JACKSON | NEVADA, USA Key historical intercepts H o le Intercep t • Low-sulphidation epithermal gold-silver system; multiple prospect areas across the broader rsonal use only broader system. PC 34A 25.9m @ 1.94 g /t A u fro m 97m (including
Slide 8: Mount Jackson: ready to drill
Mount Jackson: ready to drill MOUNT JACKSON | NEVADA, USA Maiden drill program, Q4 CY2026 rsonal use only • FTE Drilling USA Inc contracted for up to 2,500m of RC drilling. • BLM environmental permit received 1 October 2026; 15 holes permitted at Pegasus and 3 Shaft. • KLM Geoscience 12 line-km CSAM
Slide 9: Goschen Central Project
Goschen Central Project GOSCHEN CENTRAL | VICTORIA, AUSTRALIA • Located in the globally significant Murray Basin, ~50 km south-southwest rsonal use only of Swan Hill, with mineralisation hosted in WIM-style (Wimmera-type) deposits. • JORC Mineral Resource of 620Mt @ 2.2% THM containing zircon, titan
Slide 10: Goschen Central: Mineral Resource
Goschen Central: Mineral Resource GOSCHEN CENTRAL | VICTORIA, AUSTRALIA C lassificatio n To nnes To tal H M S lim es % O versize R utile Leuco xene Ilm enite Z irco n M o nazite X eno tim e rsonal use only (M t) % % Ind icated 210 2.3 21 4.3 9.1 10 22 24 3.4 0.45 Inferred 410 2.1 21 4.2 8.1 12 20 21
Slide 11: Goschen Central Scoping Study: two-stage development
Goschen Central Scoping Study: two-stage development GOSCHEN CENTRAL | VICTORIA, AUSTRALIA Phase 1 produces a zircon-titania heavy mineral concentrate and a rare earth mineral concentrate for existing markets. Phase 2 adds downstream hydrometallurgical processing to produce mixed rare earth oxides a
Slide 12: Goschen Central Scoping Study: key economics
Goschen Central Scoping Study: key economics GOSCHEN CENTRAL | VICTORIA, AUSTRALIA Dual revenue 14-year LoM A$287M | 23%IRR Up to 82% REE recovery to REMC rsonal use only Rare earths (REMC) and mineral sands (HMC) Phase 1 only, pre-tax NPV8, base case Low Cost conventional physical Utilising only ~1
Slide 13: Catalysts and news flow
C atalysts an d n ews flo w An active six months across both projects, led by maiden drilling at Mount Jackson rsonal use only Oct 2026 Q4 CY2026 30 Nov 2026 Q1 CY2027 Ongoing 2027 CSAMT survey to commence Maiden RC drill program: up Annual General Meeting, Mount Jackson assay results DIBC onboardin
Slide 14: Critical minerals: rare earths and mineral sands
Critical minerals: rare earths and mineral sands Zircon and zirconium Titanium minerals Rare earth elements rsonal use only • Nuclear fuel cladding and clean energy • Aerospace, defence and medical applications • Permanent magnets for EVs, wind turbines and defence • National defence (missiles, subm
Slide 15: REE projects aren't all alike
REE projects aren’t all alike M ineral sand s (A C D C ) H ard rock Ionic clay hosted W eathering and erosion of p rim ary hard rock d ep osits, then Prim arily m ag m atic (carb onatites, alkaline Intense in- situ weathering of REE- rich Fo rm ation fluvial or m arine transp ort and concentratio n
Slide 16: Corporate Structure
C o rp o rate S tru ctu re Capital structure Share register S hares o n issue 120,144,226 13% Retail and other ~68% rsonal use only S hare p rice (26 O ctober 2026) A $0.043 Vendors ~19% M arket cap italisation A $5.17M Management and directors ~13% 19% C ash (30 S ep tem b er 2026) A $2.744M Top 20
Slide 17: Contact
ASX: ADC rsonal use only Contact Tom Davidson Andrew Shearer ACDC Metals Ltd Chief Executive Officer Executive Chair ACN 654 049 699 [email protected] [email protected] Level 2, 480 Collins Street +61 499 256 645 Melbourne VIC 3000 T +61 3 8548 7880 www.acdcmetals.com.au
Slide 18: Appendix A: external references
Appendix A: external references 1 N evad a g o ld p ro d uctio n E& M J, N evad a: a lead er in g o ld p ro d uctio n. http s://www.e - m j.co m /features/nevad a- a- lead er- in- g o ld - p ro d uctio n Fraser Institute, A nnual S urvey o f M ining C o m p anies 2025 (released Feb ruary 2026). http
Slide 19: Appendix B: Goschen Central JORC Mineral Resource
Appendix B: Goschen Central JORC Mineral Resource C lassificatio n To nnes (M t) To tal H M % S lim es % O versize % R utile Leuco xene Ilm enite Z irco n M o nazite X eno tim e Ind icated 210 2.3 21 4.3 9.1 10 22 24 3.4 0.45 rsonal use only Inferred 410 2.1 21 4.2 8.1 12 20 21 2.8 0.45 To tal 620 2
Slide 20: Appendix C: Douglas Project
Appendix C: Douglas Project VICTORIAN PROJECTS | DOUGLAS Targeting high-grade strands in an active region of significant discoveries and mining. rsonal use only • Tenements EL7544 and EL7545 (to be confirmed by the Company; previously shown as EL7908 and EL7544) • Drilling in 2023 and 2024 totalled
Slide 21: Appendix C: Watchem North Project
Appendix C: Watchem North Project VICTORIAN PROJECTS | WATCHEM NORTH Targeting high-grade strands in an active region of significant discoveries. rsonal use only • Tenements EL7685 and EL7687 cover over 952 km². • Venice Beach strandline: shallow, high-grade heavy mineral sand strandline with a 9 km