Slide 1: NorthWestern Energy – ETAC Meeting
NorthWestern Energy – ETAC Meeting February 23, 2022 1. Intro and Discussion of Ascend Analytics (9:00-9:10) 2. AMI Update (9:10-9:40) 3. DSM Update (9:40-9:55) 4. Break (5 min) 5. Portfolio Modeling Update (10:00-10:55) 6. Public Comments (10:55-11:05) 7. Break (5 min) 8. Resource Costs (11:10-11:5
Slide 2: AMI Update
r AMI Update NorthWestern in righ
Slide 3: DSM Update
DSM Update 3
Slide 4: Portfolio Modeling Update
Portfolio Modeling Update 4
Slide 5: Portfolio Modeling Plan
Portfolio Modeling Plan Task Description Target Month for Completion Resource Adequacy Calculation capacity requirements to maintain March adequacy targets for Loss of Load Hours (2.4 hours per year) Capacity Expansion Future resource additions to the portfolio May Production Cost Modeling Simulatio
Slide 6: Base Portfolio for 2022 - Capacity
Base Portfolio for 2022 - Capacity • NorthWestern is capacity long until 2028 • Starting in 2028 contracted capacity declines • Solar and wind provide a small portion of capacity due to the low ELCC values 6
Slide 7: Base Portfolio for 2022 - Energy
Base Portfolio for 2022 - Energy • NorthWestern expects an energy surplus until 2035 • Wind and hydro generation provide the majority of energy 7
Slide 8: Base Portfolio - Thermals
Base Portfolio - Thermals Thermal/Natural Gas Generation Nameplate Capacity (MW) Accredited Capacity (MW) End Year Basin Creek 52 49.4 2036 Dave Gates 150 145.5 Yellowstone (fka Laurel; 2024 COD) 165 159.6 Thermal/Coal Generation Colstrip 222 203.7 2042 Yellowstone Energy Limited 52 Partnership (BGI
Slide 9: Base Portfolio – Hydro
Base Portfolio – Hydro Hydro Generation Nameplate Capacity (MW) Accredited Capacity (MW) End Date Thompson Falls 94 56.4 Cochrane 62 37.2 Ryan 71 42.6 Rainbow 64 38.4 Holter 53 31.8 Morony 49 29.4 Black Eagle 21 12.6 Hauser 19 11.4 Mystic 12 7.2 Madison 8 4.8 Turnbull Hydro LLC 13 7.8 2032 State of
Slide 10: Base Portfolio - Wind
Base Portfolio - Wind Nameplate Capacity Accredited Capacity Wind Generation - Online End Year (MW) (MW) Judith Gap Energy LLC 135 17.6 2026 Stillwater Wind LLC (WKN) 80 10.4 2043 South Peak Wind LLC 80 10.4 2035 Spion Kop Wind 40 5.2 Greenfield Wind LLC 25 3.3 2041 Big Timber Wind LLC (Greycliff) 2
Slide 11: Base Portfolio - Solar
Base Portfolio - Solar Solar Generation - Online Nameplate Capacity (MW) Accredited Capacity (MW) End Date Green Meadow Solar LLC 3 0.2 2042 South Mills Solar 1 LLC 3 0.2 2042 Black Eagle Solar LLC 3 0.2 2042 Great Divide Solar LLC 3 0.2 2042 Magpie Solar LLC 3 0.2 2042 River Bend Solar LLC 2 0.1 20
Slide 12: Base Portfolio – Hybrid and Storage Resources
Base Portfolio – Hybrid and Storage Resources Solar Hybrid - Future Nameplate Capacity (MW) Accredited Capacity (MW) End Date Trident Solar (160MW Solar + 80MW BESS; 80 MW Tx) 80 63 2044 Broadview I (160 MW Solar + 50 MW BESS; 80 MW Tx) 80 37 2042 Meadowlark (30 MW Solar + 12.5 MW BESS) 30 8 2042 Wi
Slide 13: Candidate Resources
Candidate Resources Typical Size Technology (MW) Natural Gas Combined Cycle 250 Natural Gas Internal Combustion Engine 18 Natural Gas Aeroderivative Turbine 50 Pumped Hydro 100 Green Hydrogen TBD DSM 10 Geothermal 20 Li Ion Battery 25 Wind 100 Solar 100 Hybrid – (wind or solar plus storage) 100 Adva
Slide 14: Public Comments
Public Comments Key Themes 1. Concerned about climate change 2. Want to see decarbonization plan 3. Early retirement analysis of Colstrip 4. Renewable energy and storage 5. Energy efficiency and demand response 14
Slide 15: Specific Modeling Requests
Specific Modeling Requests # Model Request Other Requests 1 Close Colstrip at end of 2022, 2025, 2026, 2027, Access to model. Target absolute emissions 2028, and 2030. Modeling scenarios should reductions. Climate change risks. More efficient include renewable resources plus storage, utilization of
Slide 16: Specific Modeling Requests
Specific Modeling Requests # Model Request 5 1) Model a range of DR resources (irrigation, commercial, residential) to meet capacity needs after 2023. 2)Model a scenario that considers limited availability of hydro resources due to aggressive drought 3)Model standalone operation of Colstrip Unit 4 w
Slide 17: Specific Modeling Requests
Specific Modeling Requests # Model Request 6 1. Use automated resource selection 2. Include a proxy market capacity resource based on the Powerex contract recently acquired through an RFP process. NorthWestern should consider whether it would be reasonable to adjust the contract capacity rate to ref
Slide 18: Specific Modeling Requests
Specific Modeling Requests # Model Request 6 (cont) • The model should be set up with the objective of achieving resource adequacy while limiting the addition of new natural gas generating capacity to no more than 315 MW • To the extent NorthWestern assumes non-operational QF projects that have obta
Slide 19: Specific Modeling Requests
Specific Modeling Requests # Model Request 7 • The 2022 plan should include accurate ELCCs that are based upon actual performance of Montana wind and solar resources. Further, because battery storage increases ELCC it should be included in all modeled wind/solar portfolios. • The 2022 procurement pl
Slide 20: Proposed Scenarios
Proposed Scenarios Core Scenarios: Theme Detail “Unconstrained Capacity Meet reserve margin with NWE portfolio. Otherwise, unconstrained model Expansion” “Decarbonization Plan” 100% net carbon free by 2050, interim targets TBD “Early Colstrip Retirements” Retire Colstrip in 2025, 2030, 2035 Sensitiv
Slide 21: Capacity Accreditation
r Capacity Accreditation NorthWestern sonnise
Slide 22: E3 ELCCs from 2020 Supplement
E3 ELCCs from 2020 Supplement 22
Slide 23: Capacity Accreditation Review
Capacity Accreditation Review • ELCCs calculated by E3 with RECAP for 2020 Supplement • Refreshed by NorthWestern with RECAP in 2021 • Updated Portfolio and Load Forecast • Laurel Natural Gas (175 MW) • Powerex Contract (100 MW) • Expected QFs • 305 MW Wind (Teton, Pondera, Wheatland, Jawbone, CBC 2
Slide 24: Resource Costs
r Resource Costs NorthWestern in righ
Slide 25: MT 2022 Plan – Resource Cost Updates
MT 2022 Plan – Resource Cost Updates ETAC Review Meeting – February 23, 2022
Slide 26: New Resource – Cost Update Overview
New Resource – Cost Update Overview • Generation + storage + combinations • Renewables – wind, solar, geothermal • Storage – batteries, pumped hydro • Thermal – CT, RICE, combined cycle • Overnight installed costs in 2022$ and 2023$ • Earliest notice to proceed (NTP) of 2023 • EPC project costs + ow
Slide 27: New Resource – Sources Considered
New Resource – Sources Considered • Previous NorthWestern Plans • RFP bid data • Actual project developments • Regional IRPs • Industry publications • Indicative pricing from equipment suppliers NWE MT 2022 Plan – Resource Cost Updates 27
Slide 28: New Resource Cost Updates
NWE MT 2022 Electricity Supply Resource Procurement Plan (Plan) New Resource Cost Updates 1 2020 Plan Supplement 2022 Plan Inputs 2,3 2,3 Resource Type Scale Overnight Capex Scale Overnight Capex (MW) (2020 $/kW) (MW) (2022 $/kW) 100 $ 1,611 100 $ 1,623 Wind 300 $ 1,453 100 $ 1,325 100 $ 1,460 Solar
Slide 29: Slide 29
Slide 30: Portfolio Requests
r Portfolio Requests NorthWestern in righ
Slide 31: Stakeholder Portfolio Requests
Stakeholder Portfolio Requests • Submit requests by Dec 1 using new feedback form (link here and below) • We will review and follow up with any questions (can discuss at Dec mtg) • Key factors to consider: • To be comparable, portfolios must have the same level of reliability (capacity contribution)
Slide 32: Stakeholder Portfolio Requests
Stakeholder Portfolio Requests • Submit requests by Dec 1 using new feedback form (link here and below) • We will review and follow up with any questions (can discuss at Dec mtg) • Key factors to consider: • To be comparable, portfolios must have the same level of reliability (capacity contribution)
Slide 33: RA Program Update
r RA Program Update NorthWestern in righ
Slide 34: Western Resource Adequacy Program Update
Western Resource Adequacy Program Update www.westernpowerpool.org 34
Slide 35: New Website
New Website • Supply Planning Website: • https://www.northwesternenergy.com/about-us/gas-electric/electric-supply- resource-procurement-plan • Please sign up for the email distribution list: • https://lp.constantcontactpages.com/su/XE0SdNG • Submit portfolio requests and other feedback via the new f
Slide 36: NorthWestern Energy – ETAC Meeting
NorthWestern Energy – ETAC Meeting August 4, 2021 Thank you. 36