Slide 1: Quarterly Environment Report
Angas Zinc Mine Quarterly Environment Report Quarter 4: October -December 2012 M. Daniel TERRAMIN AUSTRALIA LIMITED
Slide 2: Environmental Activities
Environmental Activities PEPR review - Closure Plan and revised PEPR submitted Waste Management Plan updated in-line with PEPR review TSF Rehabilitation (vegetation growth) trial - harvested and Annual report drafted Commencement of rabbit fumigation in December Control burning in conjunct
Slide 3: Community Interactions
Community Interactions Community Interaction Victor harbor high school, yr 10 science students -presentation and surface bus tour SACOME Mining for non-miners site visit - underground and surface tour Sponsorships Strathalbyn softball club Strathalbyn district basketball Strathalbyn fo
Slide 4: Dust Deposition Gauges
Dust Deposition Gauges 10 Total Insoluble solids Gauges 11 and 12 over 4g/m2/month (Australian Best Practice guidelines) Gauge 12 located in an 1 agricultural field adjacent to 2 12 unpaved access road 5 Gauge 11 located on 3 4 neighboring land on front 7 yard (dry and dusty in 11 6 summer) 8
Slide 5: Dust Monitoring – Dust Deposition Gauges Lead to Total Dust Ratio
Dust Monitoring – Dust Deposition Gauges Lead to Total Dust Ratio Lead levels within compliance Lead to dust ratios have been examined Highest 7 located closest to the mill Gauge 11 and 12 lowest lead: dust ratio Ratio Calculation = Lead deposition (mg/m2/month) Total Dust Deposition (g/m2/m
Slide 6: West results (Boxcut side) - December Monitoring
West results (Boxcut side)- December Monitoring A number of peaks typically before 7am associated with shift change TERRAMIN AUSTRALIA LIMITED
Slide 7: East results (Mill side) - December Monitoring
East results (Mill side) - December Monitoring Associated with the use of Idling an air lance to cool mill equipment motor bearing Wind peak Mill shut down TERRAMIN AUSTRALIA LIMITED
Slide 8: Noise Mitigation Strategies
Noise Mitigation Strategies Three noise complaints from one individual during the quarter - regarding noise at night Consultant from a noise mitigation strategies company (Flexshield) came to site in December Mill gear box produced the highest on-site noise levels Acoustic curtains were inst
Slide 9: Community feedback & environmental incidents
Community feedback & environmental incidents 2 community incidents 3 noise complaints from same complainant – Constant rhythmic noise is keeping resident awake at night Two stope blasts occurred after the 6pm cut off time due to a problem with the firing line. 2 internal environmental events
Slide 10: Upcoming Activities for Q1 2013
Upcoming Activities for Q1 2013 Completion of 2012 MARCR by 31st of March 2013 Waste Management- implement updated waste management plan Continuation of recycling of historic waste - 168 200 litre plastic drums were recycled in January Extensive feral animal control - 133 burrows fumigated i
Slide 11: Outcome Measurement Criteria 'breakdown' table
Outcome Measurement Criteria ‘breakdown’ table: Mining Regulations 2011—1.7.2011; Part 7—Programs for environment protection and rehabilitation; 65—Preparation of programs; (2) (d) set out the criteria that will be used to measure the outcomes specified in the program, including details about— i) wh