Energy Resources of Australia Ltd. Class A · ASX:ERA

Energy Resources of Australia Ltd. Class A — Non-Deal Roadshow (September 2007)

15 slides from Energy Resources of Australia Ltd. Class A's roadshow presentation, September 2007

  1. Slide 1: Energy Resources of Australia Ltd (ERA) – Financial Community September 2007

    Slide 1: Energy Resources of Australia Ltd (ERA) – Financial Community September 2007

    Energy Resources of Australia Ltd (ERA) Chris Salisbury – Chief Executive Chris Bateman – Chief Financial Officer Financial Community – September 2007 Acknowledge Traditional Owners Energy Resources of Australia (Ltd) is located on Aboriginal land and is surrounded by, but separate from, Kakadu Nati

  2. Slide 2: Forward-looking statements

    Slide 2: Forward-looking statements

    Forward-looking statements This presentation contains statements which may include predictions as to the future, and which may constitute forward-looking statements within the meaning of Australian or US securities laws. Such statements include, but are not limited to, statements with regard to capa

  3. Slide 3: Background and safety performance

    Slide 3: Background and safety performance

    Background • World’s fourth largest uranium producer • Operations based in the Northern Territory, Australia • 380 employees • In 2006 A$43.6m (2005:$41.1m) in net profit after tax and A$74.9m (2005: $33.4m) in operating cash flow • Rio Tinto owns 68.4% of ERA 4 Safety performance ERA AIFR All Injur

  4. Slide 4: Location

    Slide 4: Location

    Location Australia Narb alek DARWIN Jab iluka Rum Jungle RANGER Koongarra Coronation Hill Westmoreland Ben Lomond Northern Valhalla Territory Mary Kathleen Manyingee Kintyre Queensland Western Angela Australia South Yeelirrie Australia BRISBANE BEVERLEY OLYM PIC DAM Honeymoon PERTH SYDNEY Victoria O

  5. Slide 5: Uranium fuel cycle and sources of uranium

    Slide 5: Uranium fuel cycle and sources of uranium

    Uranium fuel cycle Manufacturing Manufacturing of of rods, rods, pellets pellets and and Enrichment Enrichment ofof U 235 content U235 content fuel fuel assemblies assemblies from from 0.7% 0.7% to to 3–4% 3–4% byby gaseous gaseous diffusion diffusion or or centrifuge Reprocessed fuel centrifuge Re-

  6. Slide 6: Concentration of supply; primary/secondary supply

    Slide 6: Concentration of supply; primary/secondary supply

    Concentration of supply Uranium supply est. 2006 (tonnes U3O8) Top 10 by country (2006) Top 7 by company (2006) Canada 11,612 Cameco 9,479 Australia 8,936 6,169 Top 6 KazAtomProm 5,813 Kazakhstan share = Niger 3,674 80% Areva 5,267 Top 8 share = Russia 3,856 ERA 4,748 83% Namibia 3,620 2,676 TVEL 4,

  7. Slide 7: Uranium spot price

    Slide 7: Uranium spot price

    Uranium spot price 140 120 100 80 US$/lb 60 40 20 0 '68 '70 '72 '74 '76 '78 '80 '82 '84 '86 '88 '90 '92 '94 '96 '98 '00 '02 '04 '06 Spot price (nominal) Spot price (real $) Source: TradeTech 12 Outline • Background • Market • Current operations • Exploration • Summary 13 7

  8. Slide 8: ERA production; further opportunities

    Slide 8: ERA production; further opportunities

    ERA production Ore to waste (million tonnes) 18 • Process plant throughput capacity of 2.4 16 million tonnes per annum 14 Waste 12 Ore • Acid Plant: all sulphuric acid will be 10 imported commencing 3Q 2007 8 6 • Storage and management of water is one 4 of the biggest environmental challenges; a 2 w

  9. Slide 9: Production outlook; sales contract position

    Slide 9: Production outlook; sales contract position

    Production outlook • ERA declared Force Majeure on its sales contracts as a result of heavy rains at end of February and early March 2007 • The rainfall led to elevated water levels in Pit 3 • ERA has been successful in obtaining approval for, and implementing, a series of measures to increase the t

  10. Slide 10: Earnings and sales volumes; H1 2007 v H1 2006 profit

    Slide 10: Earnings and sales volumes; H1 2007 v H1 2006 profit

    Earnings and sales volumes Net profit after tax, A$m Sales, tonnes U3O8 50 6,000 5,605 5,688 5,760 43.6 41.1 5,145 5,259 45 37.0 5,000 40 35 4,000 30 25 21.2 19.9 3,000 20 2,200 2,000 15 10 5.7 1,000 5 0 0 '02 '03 '04 '05 '06 1H 07 '02 '03 '04 '05 '06 1H 07 Source: ERA 18 H1 2007 v H1 2006 profit 40

  11. Slide 11: Exploration – Ranger 3 drill holes

    Slide 11: Exploration – Ranger 3 drill holes

    Outline • Background • Market • Current operations • Exploration • Summary 20 Exploration Ranger 3 Drill Holes 2007 2006 Current Pit Design Inside the Road Ranger 3 Deeps 0 0.25 Operations Facilities km 21 11

  12. Slide 12: Ranger drilling intersects; exploration potential

    Slide 12: Ranger drilling intersects; exploration potential

    Ranger 3 drilling intersects 22 Exploration potential Ranger 18 East Electromagnetic target, drill tested in 2006 - Mineralised Ranger 4.1 - Small lateritic deposit identified Ranger 3 Deeps - R3 ore body extension Radiometric Anomaly U channel anomaly - Untested Ranger 1 Deeps - Conceptual target s

  13. Slide 13: Jabiluka deposit

    Slide 13: Jabiluka deposit

    Jabiluka deposit • One of the largest undeveloped uranium ore-bodies in the world • Accessed by a shallow underground mine • Long term care and maintenance agreement signed in early 2005 • Will only be developed with consent of Traditional Owners 24 Outline • Background • Market • Current operations

  14. Slide 14: Summary; Appendix 1 operational performance

    Slide 14: Summary; Appendix 1 operational performance

    Summary • 26 years of uranium mining experience in the Northern Territory • World’s second largest uranium mine • Ownership of one of the world’s largest undeveloped uranium resources • Additional on-site exploration activity currently underway - encouraging results to date • Various expansion oppor

  15. Slide 15: Appendix 2 – H1 2007 v H1 2006 total costs

    Slide 15: Appendix 2 – H1 2007 v H1 2006 total costs

    Appendix 2 H1 2007 v H1 2006 total costs 135 130 125 120 115 110 105 A$'m 100 95 90 85 80 75 70 124.7 43.2 (7.8) (3.0) (3.1) (3.9) (1.7) 2.4 1.2 (5.5) (1.3) (2.0) 106.1 2006 Invento ry Raw Water Emplo yee Explo ratio n Co nsultants Ro yalties Shipping Depreciatio n B o rro wing Other 2007 Co sts mo

Source: Internet Archive copy of energyres.com.au