Nevada Sunrise Metals Corporation · TSXV:NEV

Nevada Sunrise Metals — Investor Presentation (April 2023)

46 slides from Nevada Sunrise Metals's investor presentation, Apr 2, 2023

  1. Slide 1: Welcome to Nevada Sunrise Metals Corp.

    NEVADA SUNRISE METALS CORP. Welcome to Nevada Sunrise Metals Corp. DISCOVERING NEVADA TSXV: NEV, OTC: NVSGF.

  2. Slide 2: Forward Looking Statements

    NEVADA SUNRISE METALS CORP. FORWARD LOOKING STATEMENTS All statements in this document regarding Nevada Sunrise Metals Corp.’s lithium, gold, copper, and cobalt exploration projects, and its Nevada water right, other than statements of historical fact, are "forward‐looking information" with respect

  3. Slide 3: Nevada: The Right Place, The Right Time

    NEVADA SUNRISE METALS CORP. Nevada: The Right Place, The Right Time All of Nevada Sunrise Metals Corp.’s mineral projects are located in a “superior” mining jurisdiction (Fraser Institute, 2021). Good access and infrastructure exists for every project, thanks to more than a century of exploration ac

  4. Slide 4: NEV's Mineral Property Assets

    NEVADA SUNRISE METALS CORP. NEV’s Mineral Property Assets • Gemini Lithium Project: 100% interest. • Jackson Wash Lithium Project: 100% interest. • Badlands Lithium Project: 100% interest. • Coronada VMS Project – NEV has an option to earn a 100% interest. Joint Ventures • Kinsley Mountain Gold Proj

  5. Slide 5: Our Exploration Philosophy

    Our Exploration Philosophy 1: Identify Prospective Geology 2: Confirm Presence of Target Minerals 3: Acquire Geophysical Data 4: Integrate Data for Drill Targets .

  6. Slide 6: Board and Management is Experienced with M&A

    NEVADA SUNRISE METALS CORP. Board and Management is Experienced with M&A Warren Stanyer, President and CEO of Nevada Sunrise, has worked with three junior mining companies where he contributed to their eventual acquisition by larger public companies: 1) Pioneer Metals Corporation – a timely staking

  7. Slide 7: Directors & Management

    NEVADA SUNRISE METALS CORP. Directors & Management Warren W. Stanyer President, CEO and Director: Warren Stanyer is a mineral exploration industry executive with over 26 years of experience in Canadian public company administration. He previously served as an officer of Pioneer Metals Corporation, w

  8. Slide 8: Suraj P. Ahuja, Director

    NEVADA SUNRISE METALS CORP. Suraj P. Ahuja Director: Suraj Ahuja, M.Sc., P.Geo., is President and Principal Geological Consultant of SKAN Consulting Inc., based in West Vancouver, BC, Canada. Mr. Ahuja has over 40 years of mineral exploration and management experience in Canada, the U.S., and South

  9. Slide 9: Directors: Michael Sweatman and Charles Roy

    NEVADA SUNRISE METALS CORP. Michael D. Sweatman Director and Chairman: Michael Sweatman is a Chartered Professional Accountant and has operated MDS Management Ltd., a Vancouver-based management consulting company, since November 1992. He obtained his Bachelor of Arts degree in economics and commerce

  10. Slide 10: Nevada Sunrise Technical Advisors

    NEVADA SUNRISE METALS CORP. Nevada Sunrise Technical Advisors • Robert (“Chip”) Allender, Jr., CPG – Chip has a 40-year career as a geologist on six continents and 20 countries in exploration and mine development. Authored technical reports for Neptune and Jackson Wash lithium projects in 2016 and s

  11. Slide 11: Technical Advisor Dan Zampirro

    NEVADA SUNRISE METALS CORP. Dan Zampirro, of Carson City, Nevada, is a technical advisor specializing in the field of lithium brines exploration. Mr. Zampirro is a Certified Professional Geologist with the American Institute of Professional Geologists and a California licensed Professional Geologist

  12. Slide 12: About Lithium in Nevada

    NEVADA SUNRISE METALS CORP. About Lithium in Nevada Nevada Sunrise is focussed on developing projects in Nevada to supply the future demand for lithium. Lithium is one of the most in-demand commodities in the world today. Nevada is currently the only source for lithium production in the U.S. Nevada

  13. Slide 13: It's all about the demand for lithium!

    NEVADA SUNRISE METALS CORP. It’s all about the demand for lithium! With the ongoing shift to electric vehicles manufacturers are rushing to secure their EV supply chains as demand for lithium soars. TSXV: NEV, OTC: NVSGF.

  14. Slide 14: Current examples of the future supply and demand for lithium

    NEVADA SUNRISE METALS CORP. Current examples of the future supply and demand for lithium: TSXV: NEV, OTC: NVSGF.

  15. Slide 15: Gemini Project: A New Lithium Discovery

    NEVADA SUNRISE METALS CORP. Gemini Project: A New Gemini Claims Map with Lithium Discovery Target Zones The Gemini Lithium Project (“Gemini”) consists of 288 lode claims and 294 placer claims for a total area of 5,700 acres (2,307 hectares) located approximately 6 miles (10 kilometres) east of the t

  16. Slide 16: Gemini Project 2016 Geophysical Interpretation

    NEVADA SUNRISE METALS CORP. Gemini Project 2016 Geophysical EM Survey Results Showing Conductive Interpretation Zones and 2022 Drill Holes at Gemini In early 2016, Nevada Sunrise received results from two TDEM surveys carried out at Gemini. The moving-loop TDEM surveys detected conductive zones with

  17. Slide 17: 2022 Gemini Lithium Project Drilling Program

    NEVADA SUNRISE METALS CORP. 2022 Gemini Lithium Project Drilling Program The results from the first two boreholes at Gemini represent a new discovery of lithium-bearing sediments in the western Lida Valley, which has not been historically drill tested for lithium mineralization. Lithium-in-sediment

  18. Slide 18: Final results from boreholes GEM22-01 & GEM22-02

    NEVADA SUNRISE METALS CORP. Gemini Lithium Project: Final results from boreholes GEM22-01 & GEM22-02 TSXV: NEV, OTC: NVSGF.

  19. Slide 19: 2022 Boreholes with Lithium Values - April 2022

    NEVADA SUNRISE METALS CORP. 2022 Boreholes with Lithium Values - April 2022 TSXV: NEV, OTC: NVSGF.

  20. Slide 20: 2022 Gemini Lithium Project Drilling Program

    NEVADA SUNRISE METALS CORP. 2022 Gemini Lithium Project Drilling Program In addition to the lithium-in-sediments, both boreholes contain dissolved lithium in a calcium/magnesium carbonate-type brine that was not easily recognized on site during the drilling program due to the presence of high levels

  21. Slide 21: Lithium-in-Water results from GEM22-01 & GEM22-02

    NEVADA SUNRISE METALS CORP. Gemini Lithium Project: Lithium-in-Water results from GEM22-01 & GEM22-02

  22. Slide 22: 2023 Phase 2 Drilling Plan

    NEVADA SUNRISE METALS CORP. 2023 Phase 2 Drilling Plan TSXV: NEV, OTC: NVSGF.

  23. Slide 23: Geophysical TDEM Model Showing Conductive Zones and 2022 Drill Holes

    NEVADA SUNRISE METALS CORP. Geophysical TDEM Model Showing Conductive Zones and 2022 Drill Holes at Gemini TSXV: NEV, OTC: NVSGF.

  24. Slide 24: Phase 2 Drilling Highlights of Borehole GEM22-03

    NEVADA SUNRISE METALS CORP. Gemini Lithium Project: Phase 2 Drilling Highlights of Borehole GEM22-03 • Borehole GEM22-03 intersected 929.80 parts per million (“ppm”) lithium-in- sediment over 1,130 feet from 280 feet (85.37 metres) to 1,410 feet (344.51 metres), including 1,342.20 ppm lithium over 3

  25. Slide 25: Final Lithium-in-Sediment Results from Borehole GEM22-03

    NEVADA SUNRISE METALS CORP. Gemini Lithium Project: Final Lithium-in-Sediment analytical Results from Boreholes GEM22-03 TSXV: NEV, OTC: NVSGF.

  26. Slide 26: 2023 Phase 2 Drilling Operations at Borehole GEM23-04

    NEVADA SUNRISE METALS CORP. 2023 Phase 2 Drilling Operations at the Site of Borehole GEM23-04 TSXV: NEV, OTC: NVSGF.

  27. Slide 27: Phase 2 Drilling Highlights of Borehole GEM23-04

    NEVADA SUNRISE METALS CORP. Gemini Lithium Project: Phase 2 Drilling Highlights of Borehole GEM23-04 • Borehole GEM23-04 intersected 1,412.38 parts per million (“ppm”) lithium-in-sediment over 1,440 feet (439.02 metres) from 510 feet (155.49 metres) to 1,950 feet (594.51 metres), including 3,556.82

  28. Slide 28: Nevada Sunrise Engages Duyvesteyn and McClelland Laboratories for Metallurgy

    NEVADA SUNRISE METALS CORP. Nevada Sunrise Engages Willem Duyvesteyn and McClelland Laboratories Inc. for Metallurgical Services at the Gemini Lithium Project Nevada Sunrise Metals has contracted Willem Duyvesteyn and McClelland Laboratories Inc. (“MLI”) to perform metallurgical leach tests on sampl

  29. Slide 29: Jackson Wash Lithium Project

    NEVADA SUNRISE METALS CORP. Jackson Wash Lithium Project The Jackson Wash Lithium Project consists of 49 unpatented claims totaling approximately 980 acres (397 hectares). The Project is located in the Lida Valley on the east side of the Montezuma Range approximately 20 miles (30 kilometers) southea

  30. Slide 30: Jackson Wash Lithium Project

    NEVADA SUNRISE METALS CORP. Jackson Wash Lithium Project Claims Map Historical Geophysical Survey TSXV: NEV, OTC: NVSGF.

  31. Slide 31: Badlands Lithium Project 100% Owned

    NEVADA SUNRISE METALS CORP. Badlands Lithium Project 100% Owned The Badlands Lithium Project (“Badlands”) consists of 54 unpatented claims on Bureau of Land Management land totaling approximately 1,200 acres (485.6 hectares) and lies roughly halfway between the Company’s Gemini and Jackson Wash Lith

  32. Slide 32: Badlands Lithium Project

    NEVADA SUNRISE METALS CORP. Badlands Lithium Project Samples were collected in a reconnaissance prospecting program, from which six outcrop samples were randomly selected for analysis and subsequently returned anomalous values of lithium ranging from 70.0 parts per million (“ppm”) to 165.8 ppm lithi

  33. Slide 33: Coronado VMS Project

    NEVADA SUNRISE METALS CORP. Coronado VMS Project Coronado is located in the Tobin and Sonoma Range of Pershing County, Nevada, approximately 48 kilometers (30 miles) southeast of Winnemucca. Access is excellent – historic past-producer Big Mike open-pit copper mine is nearby. TSXV: NEV, OTC: NVSGF.

  34. Slide 34: Big Mike Pit nearby VMS deposit

    NEVADA SUNRISE METALS CORP. Big Mike is a nearby VMS deposit discovered in the 1960s; high‐grade copper was mined‐out in 1970; Hist. resource estimate in 1969 by Cerro Corp.: 634,000 tons grading 3.41%. Big Mike Pit TSXV: NEV, OTC: NVSGF.

  35. Slide 35: Coronado VMS Project

    NEVADA SUNRISE METALS CORP. Coronado VMS Project Two highly conductive anomalies were detected by 2018 VTEM airborne survey TSXV: NEV, OTC: NVSGF.

  36. Slide 36: Highlights of the 2020 Coronado Geochemical Survey

    NEVADA SUNRISE METALS CORP. Highlights of the 2020 Coronado Geochemical Survey In August 2020, 162 soil samples were collected from a grid established across the surface trace of the Coronado South conductor, an airborne electromagnetic anomaly defined by the Company’s helicopter-borne 2018 VTEM sur

  37. Slide 37: Kinsley Mountain Gold Project

    NEVADA SUNRISE METALS CORP. Kinsley Mountain Gold Project Nevada Sunrise owns a 20.01% interest The Kinsley Mountain project (“Kinsley Mountain”) is located in Elko County about 75 kilometres (45 miles) southeast of the Long Canyon gold mine. The Company’s Nevada subsidiary has the rights to a minin

  38. Slide 38: Kinsley Mountain Gold Project – History of Joint Venture

    NEVADA SUNRISE METALS CORP. Kinsley Mountain Gold Project – History of Joint Venture On October 28, 2013: Nevada Sunrise announced the signing of the Kinsley Mountain joint venture agreement (the “Joint Venture”) between the Company and Liberty Gold Corp. (“Liberty”, formerly Pilot Gold Corp.). A De

  39. Slide 39: Kinsley Mountain Gold Project – Gold Mineralization

    NEVADA SUNRISE METALS CORP. Kinsley Mountain Gold Project – Gold Mineralization TSXV: NEV, OTC: NVSGF.

  40. Slide 40: Kinsley Mountain Gold Project – 2020 Drill Results

    NEVADA SUNRISE METALS CORP. Kinsley Mountain Gold Project – 2020 Drill Results 2.63 g/t Au (sulphide) over 38.10 meters, including 10.22 grams/tonne gold (g/t Au) (sulphide) over 6.10 meters in KMR20-017; 3.38 g/t Au (oxide) over 21.34 metres, including 5.78 g/t Au over 6.10 metres in KMR20-016; 5.1

  41. Slide 41: Kinsley Mountain Gold Resources

    NEVADA SUNRISE METALS CORP. Kinsley Mountain Gold Project Kinsley Mountain Gold Resources Effective date of the mineral resource estimate is May 5, 2021, by Mine Development Associates) Indicated Resources Inferred Resources Tonnes Gold Oz. Tonnes Gold Oz. g/t Gold g/t Gold 4,948,000 2.63 418,000 2,

  42. Slide 42: Kinsley Mountain Gold Project – Geophysical Model

    NEVADA SUNRISE METALS CORP. Kinsley Mountain Gold Project – Geophysical Model TSXV: NEV, OTC: NVSGF.

  43. Slide 43: Lovelock Cobalt Mine and Treasure Box Projects

    NEVADA SUNRISE METALS CORP. Lovelock Cobalt Mine and Treasure Box Projects On January 15, 2019, the Company signed an option agreement with Global Energy Metals Corp. (TSXV: GEMC, “GEMC”) which granted GEMC the option to acquire working interest in the Lovelock Cobalt Mine and the Treasure Box proje

  44. Slide 44: Lovelock Cobalt Mine Project Treasure Box Copper Project

    NEVADA SUNRISE METALS CORP. Lovelock Cobalt Mine Project Treasure Box Copper Project Limited production of high‐grade cobalt, nickel, and Treasure Box totals approx. 1,200 acres (486 ha.) in copper began in 1883 until 1890 500 tons of high‐ size and forms part of GEMC option. High‐grade grade (>10%)

  45. Slide 45: Lovelock Cobalt Mine – 2021 Drilling Program

    NEVADA SUNRISE METALS CORP. Lovelock Cobalt Mine – 2021 Drilling Program GEMC intersected nickel, copper and cobalt mineralization during its Phase 1 drilling at the Lovelock Mine cobalt-nickel-copper project, targeting geophysical anomalies detected in 2017 TSXV: NEV, OTC: NVSGF.

  46. Slide 46: Thank you for your interest!

    NEVADA SUNRISE METALS CORP. Thank you for your interest! TSXV: NEV - Share Structure For further information, contact: Common Shares: 99,834,376 Warren W. Stanyer, President & CEO [email protected] Options: 6,195,000 PH: (604) 428‐8028 Cell: (604) 218‐5931 or Warrants: 10,494,958 Jason

Nevada Sunrise Metals — Investor Presentation (April 2023) on 6ix