Westar Energy Inc

Westar Energy — UBS Electric Power Conference 2011

50 slides from Westar Energy's conference presentation, Mar 2, 2011

  1. Slide 1: UBS Electric Power Conference

    Slide 1: UBS Electric Power Conference

    1 UBS Utilities Conference UBS Electric Power Conference March & 3, 2011 Dallas, TX Exhibit 99.1

  2. Slide 2: Forward Looking Disclosures

    Slide 2: Forward Looking Disclosures

    2 UBS Utilities Conference Forward Looking Disclosures Forward-looking statements: Certain matters discussed in this presentation are “forward- looking statements.” The Private Securities Litigation Reform Act of 1995 has established that these statements qualify for safe harbors from liability. For

  3. Slide 3: Recent Events

    Slide 3: Recent Events

    3 UBS Utilities Conference Recent Events Reported strong 2010 results well above last year Issued 2011 earnings guidance of $1.65 to $1.80 Dividend increased for th consecutive year Updated 3-year capital expenditures Added $270 million revolving credit facility Outlined active 2011 regulatory agend

  4. Slide 4: 2010 Results Well Above 2009

    Slide 4: 2010 Results Well Above 2009

    4 UBS Utilities Conference EPS from continuing operations of $1.81 vs. $1.28 last year Retail MWh sales increased 6% – Above plan Warmer than normal weather Signs of economic recovery – Industrials up 6% Implemented all planned price adjustments (annualized amts): – Abbreviated rate case - $17 milli

  5. Slide 5: 2011 Earnings Guidance of $1.65 to $1.80

    Slide 5: 2011 Earnings Guidance of $1.65 to $1.80

    5 UBS Utilities Conference 2011 Earnings Guidance of $1.65 to $1.80 Expect price adjustments via tracking adjustments Weather adjusted retail sales grow 1% O&M increase 1% SG&A flat to decrease 1% Depreciation increases $15 million AFUDC equity decreases $2 million COLI proceeds of $0.10 per share I

  6. Slide 6: Dividend

    Slide 6: Dividend

    6 UBS Utilities Conference $0.92 $1.00 $1.08 $1.16 $1.20 $1.24 $1.28 $0.75 $0.85 $0.95 $1.05 $1.15 $1.25 $1.35 2005 2006 2007 2008 2009 2010 2011 Dividend Quarterly dividend increased 3% effective April 1 Long-standing dividend payout target of 60%-75% of earnings – 2011 guidance implies payout at u

  7. Slide 7: Capital Expenditure Forecast 2011 - 2013

    Slide 7: Capital Expenditure Forecast 2011 - 2013

    7 UBS Utilities Conference Capital Expenditure Forecast 2011 - 2013 Actual Forecast Forecast Forecast Forecast 2010 2011 2012 2013 2011 - 2013 Method of Cost Recovery Generation replacements and other 83.4 $ 130.4 $ 146.4 $ 150.6 $ 427.4 $ General Rate Case (GRC) Westar environmental 107.7 181.1 200

  8. Slide 8: Capital Expenditure Forecast 2011 - 2013

    Slide 8: Capital Expenditure Forecast 2011 - 2013

    8 UBS Utilities Conference Capital Expenditure Forecast 2011 - 2013 $0 $100 $200 $300 $400 $500 $600 $700 $800 $900 2010 2011 2012 2013 $540 $722 $826 $823 Environmental Other Transmission 62% 65% 61% 57%

  9. Slide 9: New $270 Million Revolving Credit Facility

    Slide 9: New $270 Million Revolving Credit Facility

    9 UBS Utilities Conference Four year maturity 2 options to extend term up to 1 year Accordion option allows for increase up to $400 million Increased total credit lines to $1 billion – Existing $730 million facility – New $270 million facility New $270 Million Revolving Credit Facility

  10. Slide 10: Significant Planned Regulatory Agenda

    Slide 10: Significant Planned Regulatory Agenda

    10 UBS Utilities Conference Significant Planned Regulatory Agenda Seek predetermination for 370MW of renewables Update TDC tariff KCC docket reviewing retrofit economics for coal plants Request siting authority for Prairie Wind Transmission line Update ECRR tariff Update energy efficiency rider Plan

  11. Slide 11: 2011 Plans

    Slide 11: 2011 Plans

    11 UBS Utilities Conference 2011 Plans

  12. Slide 12: Seeking Predetermination for 370 MW of Renewables

    Slide 12: Seeking Predetermination for 370 MW of Renewables

    12 UBS Utilities Conference Statute requires 200 MW additional renewables Seeking predetermination from KCC for MW through PPAs – Tentative agreements for 2 projects Post Rock Wind Farm - 201 MW Ironwood Wind Farm – 168 MW – Expect both projects to be in-service by end 2012 KCC Staff and CURB agree

  13. Slide 13: Annualized Rate & Revenue Changes

    Slide 13: Annualized Rate & Revenue Changes

    13 UBS Utilities Conference Annualized Rate & Revenue Changes Actual and Estimated 2010 2011 (Estimated) 2012 (Estimated) Base rates $17 million Feb (Abbreviated rate case) TBD Transmission rates $16 million Jan 1 $17 million Jan 1 $17 million Jan 1 ECRR $14 million June 1 $10 million June 1 $29 mil

  14. Slide 14: Major Construction Projects Underway

    Slide 14: Major Construction Projects Underway

    14 UBS Utilities Conference Major Construction Projects Underway Environmental – Lawrence Energy Center Install fabric filters, rebuild scrubbers, precipitator, low NOx system – Jeffery Energy Center Install SCR on 1 unit – La Cygne Energy Center Scrubbers, fabric filters, common chimney, SCR and lo

  15. Slide 15: Projected Rate Base 2010 – 2015

    Slide 15: Projected Rate Base 2010 – 2015

    15 $3.5 $3.5 $3.5 $3.6 $3.7 $3.8 UBS Utilities Conference Projected Rate Base 2010 – 2015 (in billions) 2010 2011 2012 2013 2014 2015 Base Environmental Transmission $6.7 $6.3 $5.9 $5.4 $5.0 $4.5

  16. Slide 16: Transmission

    Slide 16: Transmission

    16 UBS Utilities Conference Transmission

  17. Slide 17: Major Transmission Investments Underway

    Slide 17: Major Transmission Investments Underway

    17 UBS Utilities Conference Major Transmission Investments Underway Rose Hill – Oklahoma Under construction Target completion mid 2012 Investment $100 million Prairie Wind Transmission 50/50 JV with ETA Siting request Feb 2011 Begin construction mid 2012 Estimated completion 2014 Project cost $225 m

  18. Slide 18

    Slide 18

  19. Slide 19: Prairie Wind Transmission, LLC

    Slide 19: Prairie Wind Transmission, LLC

    19 UBS Utilities Conference Prairie Wind Transmission, LLC Received FERC incentives – Abandonment costs – Recovery of pre-commercial development costs – CWIP recovery in rate base – 50/50 capital structure – Allowed ROE of 12.8% KCC – Siting request filed Feb 28, 2011 Southwest Power Pool – Regional

  20. Slide 20: Next Steps and Tentative Schedule for Prairie Wind JV

    Slide 20: Next Steps and Tentative Schedule for Prairie Wind JV

    20 UBS Utilities Conference Next Steps and Tentative Schedule for Prairie Wind JV Obtain siting authority from KCC Engineer and design Acquire rights-of-way Construction – Anticipated to start by mid 2012 – Target completion late 2014

  21. Slide 21: Profile

    Slide 21: Profile

    21 UBS Utilities Conference Profile

  22. Slide 22: Strategic Approach

    Slide 22: Strategic Approach

    22 UBS Utilities Conference Strategic Approach Embrace uncertainty and acknowledge inability to predict the future Place a high value on flexibility – Operational – Financial – Regulatory Leverage actions and strategies around intrinsic advantages Seek collaborative and constructive approaches to re

  23. Slide 23: Pure-play, vertically integrated, rate-regulated

    Slide 23: Pure-play, vertically integrated, rate-regulated

    23 UBS Utilities Conference Pure-play, vertically integrated, rate-regulated 7,000 MW of generation 6,200 miles transmission 687,000 customers Kansas’ Largest Electric Provider

  24. Slide 24: Favorable Supply Portfolio

    Slide 24: Favorable Supply Portfolio

    24 UBS Utilities Conference Favorable Supply Portfolio $56.37 $17.45 $6.50 Uranium Coal Gas Ave. Fuel Cost $18.37/MWh Fuel Mix Coal 49% Gas 39% Wind 4% Uranium 8% MW Capacity 5.0¢ 6.0¢ 7.0¢ 8.0¢ 9.0¢ 10.0¢ Westar Energy Kansas City Power and Light (KS) Empire District Electric (KS) National Average

  25. Slide 25: Diverse Energy Sales (MWh)

    Slide 25: Diverse Energy Sales (MWh)

    25 UBS Utilities Conference Diverse Energy Sales (MWh) Chemical & oil Food processing Aerospace Consumer manufacturing Other Commercial 38% Residential 35% Industrial 27% 39% 17% 16% 16% 12% 12% 18% 8% 7% 3% 4% 48% Other General merchandise Grocery/ Convenience Real estate Health care Government Edu

  26. Slide 26: Strong Service Territory

    Slide 26: Strong Service Territory

    26 UBS Utilities Conference Strong Service Territory Overall economic conditions significantly better than nation – No real estate crash – State unemployment remains 2+ pts favorable to nation Industrial sales showing signs of recovery – ’10 up 6% over ‘09 levels Pentagon awards refueling tanker con

  27. Slide 27: Capitalization and Liquidity

    Slide 27: Capitalization and Liquidity

    27 UBS Utilities Conference Capitalization and Liquidity Target 50/50 capital structure Solid investment grade credit Total credit facility capacity $1 billion No bonds mature before 2014 December 31, 2010 (a) (millions) Long-term, net $2,491 Preferred Common 2,383 Total Capitalization $4,895 Debt 5

  28. Slide 28: Potential for High Voltage Transmission Growth

    Slide 28: Potential for High Voltage Transmission Growth

    28 UBS Utilities Conference Potential for High Voltage Transmission Growth A. JEC to Iatan Energy Center B. JEC to Concordia C. Concordia to Salina D. Salina to Hays E. JEC to Swissvale F. Hutchinson to Spearville G. Wichita to Rose Hill H. Wolf Creek to Emporia F G A B C E D H

  29. Slide 29: Westar’s Value Proposition

    Slide 29: Westar’s Value Proposition

    29 UBS Utilities Conference Westar’s Value Proposition Solid, transparent business strategy Strong, experienced utility management team Thoughtful, disciplined approach to operations, capital planning and financing Constructive regulatory and policy environment – Results in lower prices for customer

  30. Slide 30: Rates and Regulation

    Slide 30: Rates and Regulation

    30 UBS Utilities Conference Rates and Regulation

  31. Slide 31: Regulatory Approach

    Slide 31: Regulatory Approach

    31 UBS Utilities Conference Regulatory Approach A sound regulatory and energy policy platform – KCC and FERC Ultimately results in lower rates for customers Time Traditional GRC Riders coupled with GRC Ultimately, lower rates

  32. Slide 32: Methods of Cost Recovery

    Slide 32: Methods of Cost Recovery

    32 UBS Utilities Conference Methods of Cost Recovery Revenue Requirement Method of Recovery Comment 1. Fuel, purchased power and environmental consumables Quarterly adjustment based on forecasted cost, with annual true-up Adjusts prices for actual costs, protecting both customers and investors from

  33. Slide 33: Retail Energy Cost Adjustment (RECA)

    Slide 33: Retail Energy Cost Adjustment (RECA)

    33 UBS Utilities Conference Retail Energy Cost Adjustment (RECA) Provides timely price adjustments for fuel and purchased power costs Retail rates based on forecast of fuel and purchased power costs and retail sales – Set quarterly – Difference between forecast and actual is deferred Quarterly appro

  34. Slide 34: Environmental Cost Recovery Rider Mechanics

    Slide 34: Environmental Cost Recovery Rider Mechanics

    34 UBS Utilities Conference Environmental Cost Recovery Rider Mechanics ECRR adjusts retail rates annually to reflect capital investments in emission controls – Investments as of December 31 recovered in rates subsequent June – Eliminates need to file a rate case to capture rate base additions Retur

  35. Slide 35: Illustrative ECRR Mechanics

    Slide 35: Illustrative ECRR Mechanics

    35 UBS Utilities Conference Illustrative ECRR Mechanics (1) Illustration reflects only the projects publicly announced and assumes one-half of annual investment in service at year end (2) Illustration uses 12% pretax return and 4% depreciation recovery (3) Annual ECRR Tariff is effective June 1; ass

  36. Slide 36: Transmission Cost Recovery

    Slide 36: Transmission Cost Recovery

    36 UBS Utilities Conference Transmission Cost Recovery FERC formula transmission rate – Changes in cost of service reflected in annual update of FERC tariff Update posted each October using projected test year – Capital expenditures – O&M – Tariff based on year-end consolidated capital structure FER

  37. Slide 37: Transmission Formula Rate Mechanics

    Slide 37: Transmission Formula Rate Mechanics

    37 UBS Utilities Conference Transmission Formula Rate Mechanics Fixed formula with changing inputs – Updated annually using Form 1 data – Established protocols for updates Uses projected test year – Rate base (based on 13 month average) – O&M, depreciation and taxes – Cost of debt Annual true-up inc

  38. Slide 38: Statutes for Predetermination and CWIP

    Slide 38: Statutes for Predetermination and CWIP

    38 UBS Utilities Conference Statutes for Predetermination and CWIP Predetermination – Utilities can obtain order establishing ratemaking principles that will apply over the life of the asset Construction Work in Progress (CWIP) – Utilities can include CWIP in rate cases

  39. Slide 39: Pension Tracker

    Slide 39: Pension Tracker

    39 UBS Utilities Conference Pension Tracker Defer as regulatory asset shortfall between funding of GAAP pension/OPEB expense and pension/OPEB currently authorized in rates Maintain minimum funding level equal to GAAP pension/OPEB expense Recover deferred expenses through multi-year amortization as p

  40. Slide 40: Energy Efficiency Initiatives

    Slide 40: Energy Efficiency Initiatives

    40 UBS Utilities Conference Energy Efficiency Initiatives SmartStar Lawrence smart grid project – Installing 48,000 “smart” meters – Advanced outage management system – Total project cost of $40 million Reduced by 50% DOE match – Expect to implement over 2 - 3 years Deferred accounting for the cost

  41. Slide 41: Kansas’ Renewable Requirements

    Slide 41: Kansas’ Renewable Requirements

    41 UBS Utilities Conference Kansas’ Renewable Requirements Renewable Portfolio Standard established – Installed capability standard in lieu of energy standard 10% of peak load by 2011, 15% by 2016 and 20% after 2020 – Implies additional 150 to 200 MW for Westar – If generated in Kansas, treated at 1

  42. Slide 42: Capital Structure for Ratemaking (Per Recent Orders)

    Slide 42: Capital Structure for Ratemaking (Per Recent Orders)

    42 UBS Utilities Conference Capital Structure for Ratemaking (Per Recent Orders) Capitalization Ratio Cost of Capital Weighted Cost of Capital Pre-tax Weighted Cost of Capital Long-term debt 48.66% 6.55% 3.19% 3.19% Preferred 0.51 4.55 .02 .04 Common 50.83 10.40 5.29 8.77 100.00% 8.50% 12.00% Capita

  43. Slide 43: Background

    Slide 43: Background

    43 UBS Utilities Conference Background

  44. Slide 44: Westar Energy Legal Structure

    Slide 44: Westar Energy Legal Structure

    44 UBS Utilities Conference Westar Energy Legal Structure Kansas Gas and Electric Company Consolidated capital structure is used for ratemaking (Rate regulated utility) (Rate regulated utility) Westar Energy, Inc. Parent Subsidiary Combined company does business under the name “Westar Energy”

  45. Slide 45: Westar’s Plants

    Slide 45: Westar’s Plants

    45 UBS Utilities Conference Westar’s Plants Westar's MW Operator Years Installed Pulverized coal Jeffrey Energy Center 1,992 Westar 1978, 1980, 1983 Lawrence Energy Center Westar 1954, 1960, 1971 Tecumseh Energy Center Westar 1957, 1962 LaCygne Station KCPL 1973, 1977 Nuclear Wolf Creek WCNOC (1) 19

  46. Slide 46: Low-Cost Coal Fleet

    Slide 46: Low-Cost Coal Fleet

    46 UBS Utilities Conference Low-Cost Coal Fleet Very low fuel cost – PRB coal – Excellent rail arrangements – Proximity to mines Low embedded capital cost No high-heat rate obsolete plants LAC 2 subject to lease agreement

  47. Slide 47: Westar Energy Coal Fleet

    Slide 47: Westar Energy Coal Fleet

    47 UBS Utilities Conference Westar Energy Coal Fleet Unit Capacity (MW) WR Share (MW) Age Heat Rate (Btu/kWh) Net Book Value (Millions) $/KW Jeffrey 2 11,256 $ $ Jeffrey 1 11,204 $ $ Jeffrey 3 11,265 $ $ Lawrence 5 10,713 $ $ La Cygne 1 10,497 $ $ La Cygne 2 (a) 10,500 $ $ Tecumseh 8 11,189 $ $ Lawr

  48. Slide 48: Westar Coal Fleet Emission Control Equipment

    Slide 48: Westar Coal Fleet Emission Control Equipment

    48 UBS Utilities Conference Westar Coal Fleet Emission Control Equipment Unit Scrubber Precipitator Fabric Filter Low NOx SCR Jeffrey 1 Yes Yes No plans Yes Planned Jeffrey 2 Yes Yes No plans Planned No plans Jeffrey 3 Yes Yes No plans Yes No plans La Cygne 1 Yes NA Planned Yes Yes La Cygne 2 Planne

  49. Slide 49: Dramatic Improvement in Air Quality

    Slide 49: Dramatic Improvement in Air Quality

    49 UBS Utilities Conference Dramatic Improvement in Air Quality 2005 2006 2007 2008 2009 2010 2005 2006 2007 2008 2009 2010 Sulfur Dioxide 76% (000 tons) Nitrogen Oxide 49% (000 tons)

  50. Slide 50: Coal Supply

    Slide 50: Coal Supply

    50 UBS Utilities Conference Westar-operated plant supply (80%) JEC supply under contract through 2020 (10+ million tons/year) – 70% has no market openers – 30% reopened on price every 5 years Next re-pricing will occur in 2013 – All volumes have cost escalators – Rail contract through 2013 LEC/TEC s

Source: SEC EDGAR · 8-K filed Mar 2, 2011