Slide 1: Bidder's Conference
12/29/2022 BIDDER’S CONFERENCE PSCo 2021 Electric Resource Plan (ERP) Phase II 2022 All-Source Request for Proposal (RFP) December 20th, 2022 1 TODAY’S AGENDA 1.Introductions 6.Transmission 2.RFP Logistics 7.Q/A Session #2 3.Independent Evaluator 8.Best Value Employment Metrics 4.Bidding Details 9.Q
Slide 2: Introductions and Meeting Logistics
12/29/2022 Introductions Xcel Energy Robert Kenney, President, Public Service Company of Colorado Jon Landrum, Director, Resource Planning-Colorado Jack Ihle, Regional Vice President, Regulatory Affairs Accion Group Harry Judd, Independent Evaluator (IE) Leeds School of Business, University
Slide 3: Logistics | RFP Schedule
12/29/2022 Logistics | RFP Schedule Activity Date RFP Issuance December 1st, 2022 Bidder’s Conference December 20th, 2022 Notice of Intent to Respond February 15th, 2023, by 4:00 P.M. MT Proposals Due March 1st, 2023, by 4:00 P.M. MT 30-Day RFP Response Report to PUC March 31st, 2023 45-Day Bidder N
Slide 4: Logistics | Notice of Intent to Respond
12/29/2022 Logistics | Notice of Intent to Respond (NOIR) Mandatory for Bid Participation Submit to RFP Project Manager email no later than 4:00 PM MT, February 15th, 2023 © 2022 Xcel Energy 7 7 Logistics | Bid and Bid Fee Submittal Upload link emailed upon receipt of NOIR Return email will
Slide 5: Logistics | Confidentiality and Bid Fees
12/29/2022 Logistics | Confidentiality The Company will generally seek to protect all bid information as Highly Confidential under PUC rules. However, per PUC rules: Certain high-level bid information (including price) will be released publicly following the conclusion of the RFP The Company res
Slide 6: Independent Evaluator for PSCo - Xcel
12/29/2022 Logistics | Bid Fees (cont.) Exceptions where multiple options will be considered with a single fee: Ownership and PPA versions (for projects over 2 MW) Multiple pricing options Fixed and escalating pricing With or without compensable PTC and/or curtailment costs Solar + storage
Slide 7: Introduction of Accion
12/29/2022 Introduction of Accion Selected by the CPUC, OCC, PSCo 2013 Xcel/PSCo Dispatchable 2013 Xcel/PSCo Renewables 2013 Xcel/PSCo Semi-Dispatchable 2017 Xcel/PSCo All Source 2022 Xcel/PSCo All Source Extensive Experience as Independent Evaluator Over 120 Solicitations in Past 18
Slide 8: About the IE – RFP Experience
12/29/2022 About the IE – RFP Experience TERM OF INITIAL STATE SERVICE CAPACITY SOUGHT FUEL SOURCE YEAR (YEARS) Arizona Seasonal – 3 2,800 MW All Source 2003 Arizona Open Open Renewable 2006 Arizona 10 175,000 MWh Renewable 2007 Arizona Open 90 MW All Source 2007 Arizona 30 230 kW, 115 kW All Source
Slide 9: RFP Experience (Continued)
12/29/2022 RFP Experience (Continued) TERM OF INITIAL STATE SERVICE CAPACITY SOUGHT FUEL SOURCE YEAR (YEARS) Colorado 1-25 1800 MW All Source -Renewable 2016 Georgia 20 60 MW Solar 2016 Georgia 40 600 – 1,200 MW All Source/Nuclear incl. 2016-17 California 2, 3, 5 1,402 MW Combined Heat and Power 201
Slide 10: Role of the IE
12/29/2022 Role of the IE Monitor the Standards of Conduct Ensure the RFP is not designed to advantage any Bidder Including any Company bids Monitor separation of the Company’s Evaluation Team & Bidders Supports clear and consistent Communications and Messaging Monitor & review all email
Slide 11: Role of the IE; Expectations of Bidders
12/29/2022 Role of the IE Confirm Bids received via PSCo ‘drop box’ Confirm Bids released to Evaluation Team only after Bid period closes The Evaluation model is “locked down” Confirm all Company Bids received at least 24 hours before other bids. © 2022 Xcel Energy 21 21 Expectations of Bidde
Slide 12: Bidding Details | Summary of RFPs
12/29/2022 Bidding Details All-Source RFP Eligible COD dates from 2023 through December 31st, 2028 Resource Firm Capacity Need (cumulative) Year 2023 2024 2025 2026 2027 2028 CAPACITY NEED (MW) 183 388 398 433 840 1,556 © 2022 Xcel Energy 23 23 OWNERSHIP TYPES PURCHASE OWN Purchase Power Build
Slide 13: Bidding | Hybrid Projects
12/29/2022 Bidding | Hybrid Projects A hybrid project is a combination of multiple generation and/or storage components A hybrid project does not require a storage component For example, a wind and solar facility is considered a hybrid proposal For a PPA - if a bidder is seeking cost recover
Slide 14: Transmission | Colorado Power Pathway (CPP)
12/29/2022 QUESTIONS © 2022 Xcel Energy 27 Transmission | Colorado Power Pathway (CPP) $1.7 to $2 billion dollar investment New double-circuit 345-kilovolt electric transmission line About 545 miles divided into 5 segments Includes 3 new and 4 expanded substations Additional 60 miles with
Slide 15: Transmission | Interconnection
12/29/2022 Transmission | Interconnection PSCo filed Queue Reform on December 14th, 2022, in Docket ER23-629-000 Increases the certainty that projects in the queue are ready to interconnect Identifies unready projects cause multiple harms and are delaying the interconnection of ready projects
Slide 16: Transmission | Resource Solicitation Cluster (RSC)
12/29/2022 Transmission | Resource Solicitation Cluster (RSC) Expect to begin an RSC in Q2 2023 Likely to be several portfolios to capture primary and backup bids RSC bidders will be contacted in advance and must have completed, but not submitted, a Large Generator Interconnection Procedures (
Slide 17: Best Value Employment Metrics Rubric
12/29/2022 QUESTIONS © 2022 Xcel Energy 33 Best Value Employment Metrics Rubric Bidders Conference December 20, 2022 Business Research Division University of Colorado Boulder December 20, 2022 34 17
Slide 18: Introductions; Methodology: General Rubric Design
12/29/2022 Brian Lewandowski Introductions Executive Director, Leeds Business Research Division School of Business Boulder Sarah Quintanar Senior Labor Economist Adam Illig Data Scientist Richard L. Wobbekind Associate Dean, Business & Government Relations Senior Economist 35 Methodology: General Ru
Slide 19: BVEM & Rubric Metrics
12/29/2022 BVEM & Rubric Metrics BVEM, or Best Value Employment Metrics- Since 2010 statute has required employment metrics to be a consideration when the CO Public Utilities Commission evaluates and approves utilities’ electric resource acquisition projects Rubric Purpose: Employing a consistent an
Slide 20: Rubric Concept Flow
12/29/2022 Rubric Concept Flow Level 1 Overall: Training Programs Level 2 Craft 1: Craft 2: Craft 3: Training Training Training Job Classification 1: Job Classification 2: Job Classification 2: Job Classification 2: Job Classification 2: Job Classification 2: Level 3 Training Training Training Train
Slide 21: Wage and Benefits Example Scoring Rubric
12/29/2022 Wage and Benefits Example 41 Scoring Rubric 42 21
Slide 22: BVEM Q&A
12/29/2022 BVEM Q&A 43 FINAL QUESTIONS Thank you https://www.XcelEnergy.com/PSCo2022AllSource [email protected] © 2022 Xcel Energy 44 22
Slide 23: Appendix
12/29/2022 © 2022 Xcel Energy 45 45 APPENDIX © 2022 Xcel Energy 46 23
Slide 24: All-Source Solicitation Timeline; Acronyms
12/29/2022 All-Source Solicitation Timeline © 2022 Xcel Energy 47 47 BESS Battery Energy Storage System BOT Build Own Transfer Acronyms BVEM Best Value Employment Metrics COD Commercial Operation Date CPP Colorado Power Pathway CT Gas Combustion Turbine DI Disproportionally Impacted Communities ERP