Soluna Holdings, Inc. · NASDAQ:SLNH

Soluna — Investor Presentation (March 2026)

71 slides from Soluna's investor presentation, March 2026

  1. Slide 1: Power AI & Bitcoin, sustain tomorrow: Renewable Computing

    Power AI & Bitcoin, sustain tomorrow: Renewable Computing. Nasdaq: SLNH 1

  2. Slide 2: Legal Disclosure & Disclaimer

    Legal Disclosure & Disclaimer This presentation includes forward-looking statements within the meaning of the Private Securities Litigation Reform Act that reflect our current views with respect to, among other things, our operations, business strategy, interpretation of prior development activities,

  3. Slide 3: Renewable Computing: using compute to bridge the supply gap

    Renewable Computing: using compute itself to bridge the supply gap needed to power To reach their massively increased Renewable Energy has a full potential AI compute. wasted energy & Bitcoin need a sustainable problem. energy source. Up to 40% of generated energy goes unused. Soluna converts unused

  4. Slide 4: Company Overview

    EXECUTIVE SUMMARY Company Overview + AI is driving Miners prefer Soluna bridges Clean energy goes to waste due to exponentially scalable, well- this gap curtailment growing demand managed, and for compute cost-advantaged hosting partners. Co-locating data centers behind the meter at renewable power

  5. Slide 5: 2025 Soluna Highlights

    2025 Soluna Highlights 1 INSTALLED HASHRATE MW MANAGED 2025 Q4 REVENUE 5.2 EH/s 2 123 MW ~1.0 GW 3 $9.2 Million AVERAGE POWER COST CURTAILED ENERGY MONETIZED CAPITAL RAISED in Q4 $34 / MWh 4 105,109 MWh 4 $57.5 Million 5 EMPLOYEES POWER DEVELOPMENT PIPELINE AVERAGE J / TH/s 55 1 ~4.3 GW <25 J / TH/s

  6. Slide 6: Our Strategy

    Our Strategy Bitcoin We develop, own and operate Bitcoin Hosting Data Centers. Transform stranded clean energy into high-performance computing infrastructure. ~4.3GW Renewable Power Pipeline Computing We sign PPAs and acquire We make renewable energy a land co-located with global superpower using Re

  7. Slide 7: Soluna Organizational Structure

    Soluna Organizational Structure Soluna Holdings, Inc. (Nasdaq: SLNH) Soluna Energy, Inc. Soluna Digital, Inc. Soluna HPC, Inc. The development platform that The Bitcoin Hosting business The AI business that builds and identifies and acquires that builds, operates and leases operates data centers that

  8. Slide 8: Business Segments

    Business Segments Prop Bitcoin Mining Grid Ancillary Services Diversified Revenue • Soluna or JV owned Bitcoin mining • Compensation to act as behind-the-meter machines flexible load for the grid Streams • Bitcoin sold daily • Paid on $ / MWh basis by Utility or Grid Operator • Soluna provides Managed

  9. Slide 9: Our Data Center Projects

    Our Data ProjectA Dorothy 1A Location TX Power Source Wind Size (MW) 25 Model BTC Hosting Status 1 Operating Power Cost $35 Partner(s) Spring Lane, Generate Center Projects Dorothy 1B TX Wind 25 BTC Mining Operating $35 Navitas Sophie KY Grid 25 BTC Hosting Operating $33 N/A We have over 1GW of Doro

  10. Slide 10: Project Locations

    Project Locations Soluna has 1GW+ of Renewable Computing Projects in Texas. A major location for Bitcoin and AI data centers. The proximity of several projects creates “clustering.” This potentially creates opportunities for larger data center campuses at our sites. 10 10 | | Nasdaq: Nasdaq: SLNH SL

  11. Slide 11: Key Metrics - All Operating Sites

    Key Metrics - All Operating Sites (As of December 31, 2025) PROJECTS ENERGIZED BUSINESS BTC ALLOCATION HOSTING CUSTOMER DISTRIBUTION 121 MW Bitcoin Mining - operational 25 MW proprietary 123 MW 2 MW AI - under 7 industry development 98 MW hosting leading partners DEPLOYED MINING RIGS OPERATING HASHR

  12. Slide 12: Energized Data Center Capacity and Growth

    Energized Data Center Capacity and Growth We are building the largest clean-energy-powered Bitcoin Energy Capacity (MW) Compute Power (EH/s) infrastructure platform. 700 70 600 60 500 50 1 1 Year Energy (MW) Hashrate (EH/s2) 400 40 2023 25 1.0 300 30 2024 75 2.9 2025 129 5.8 200 20 2026 368 19.8 100

  13. Slide 13: Illustrative Earnings Potential - Base case

    Illustrative Earnings Potential Base case - $55 Hashprice 3 Non-GAAP Financials 1,2 Consolidated Total Revenue Consolidated Total Adj. EBITDA $000 $000 Substantial potential ramp of Consolidated Total Revenue and Adj. $140,000 $70,000 $132,808 EBITDA1,2 driven by completion of the $117,539 following

  14. Slide 14: Illustrative Earnings Potential - Upside case

    Illustrative Earnings Potential 3 Upside case - $75 Hashprice Non-GAAP Financials 1,2 Consolidated Total Revenue Consolidated Total Adj. EBITDA $000 $000 Additional $20 of Hashprice vs. base $167,078 case adds approximately $35 million to $160,000 $100,000 annual Consolidated Total Adj. $148,297 $88

  15. Slide 15: Pipeline & Distinctives

    Pipeline & Distinctives 15 | Nasdaq: SLNH

  16. Slide 16: The Perfect Storm: Driving Energy Demand

    The Perfect Storm: Driving Energy Demand Historic Load Infrastructure Grid Reliability Energy Arms Spike 1,2 Bottlenecks 3,4,5 Strained 6,7,8,9 Race 1,2,6 Explosive load growth: U.S. Interconnection queues exceed DOE (2025) and NERC (2024 LTRA) Unprecedented scale: CapEx is utilities now forecast 50

  17. Slide 17: Soluna Development Pipeline as of December 31, 2025

    Soluna Development Pipeline as of December 31, 2025 6000 MW 5250 MW 805MW 83MW 123MW 4.3GW+ 4500 MW 3.3GW 3750 MW 3000 MW 2250 MW 1500 MW 750MW 0MW Assessed Planning & Development Under Construction Operating Total Pipeline Curtailment assessments PPA negotiations or signed, Project Kati 1 is active

  18. Slide 18: Unique Interconnection Strategy

    Unique Interconnection Strategy Behind-the-Meter Structure Allows Our Data Centers to Remain Flexible, Drawing Power from the Grid or Renewable Power Plant and Provide Ancillary Services. Rapid Time to Interconnection. EXISTING RENEWABLE POWER PROJECT ASSETS GRID OPERATOR TELEMETRY PROJECT METER HV

  19. Slide 19: Maestro OS Is Our Force Multiplier

    Maestro OS Is Our TM Force Multiplier Our proprietary software streamlines site operations with intelligent monitoring, precise data, and full-stack automation—enabling faster decisions, higher uptime, and seamless grid integration. Control Data Collection Operations Power Extend equipment lifespan

  20. Slide 20: Soluna's Distinctiveness

    Soluna’s Distinctiveness Behind the Meter (BTM) BTM model enables Flexible power design Proprietary software and model captures accelerated access to with redundant options for proven execution stranded energy and low cost power power eases grid congestion Monetizing stranded power Using existing su

  21. Slide 21: Focus & Catalysts

    2026 Focus & Catalysts 21 | Nasdaq: SLNH

  22. Slide 22: 2026 Corporate Focus

    2026 Corporate Focus Develop Optimize Capital Grow AI Projects Formation Pipeline Advance Project Kati 2 with Energize Project Kati 1. Executing a disciplined Expand Soluna’s Metrobloks to shovel-ready Enhance profitability capital strategy to fund Renewable and tenant-ready. Build a across operating

  23. Slide 23: Q1 - Q2'26 Roadmap of Upcoming Catalysts

    Energize Phase 1 (48 MW) Continue to Develop Existing Customer Energize Phase 2 (35MW) of of Kati 1 Kati 2 AI Expansions Kati 1 Project-level Capital PPAs on Projects Rosa, New Customer New AI Project Formation Hedy, Ellen, Annie Announcements Announcements Q1 - Q2’26 Roadmap of Upcoming Catalysts I

  24. Slide 24: Artificial Intelligence

    Artificial Intelligence 24 | Nasdaq: SLNH

  25. Slide 25: AI Campus at Project Kati 2

    AI Campus at Project Kati 2 JOINT VENTURE A co-development JV combining Soluna's renewable-powered Texas campus METROBLOKS BRINGS with Metrobloks' hyperscale AI data center design and operations platform. • AI-ready data center design & operations • Pre-lease & customer engagement • Day-to-day site

  26. Slide 26: 26 | Nasdaq: SLNH

    26 | Nasdaq: SLNH

  27. Slide 27: 300MW+ Tier III AI Campus Plan

    300MW+ Tier III AI Campus Plan Phased Onsite Power Renewable Grid Development Generation Clustering Stabilization Plan Strategy Infrastructure Kati-2 is planned as a two-phase, The campus power plan is Grid power for the campus is The campus design includes a AI-optimized data center campus expected

  28. Slide 28: Company Overview

    Company Overview 28 | Nasdaq: SLNH

  29. Slide 29: Overlapping challenges

    3 overlapping challenges 2 Exploding Compute 1 Constrained Grid 3 Imbalanced Demand Energy Supply- Demand (1) The Computational Limits of Deep Learning, Thompson N et Al - 2022 29 | Nasdaq: SLNH

  30. Slide 30: Constrained Grid

    1 / CONSTRAINED GRID Historic Infrastructure Grid Reliability Load Spike 1,2 Bottlenecks 3,4,5 Strained 6,7,8,9 National interconnection queues exceed DOE (2025) and NERC 2.6TW (2024 LTRA) warn of rising 50GW reliability risks without of new generation Permitting and build times MAJOR NEW needed by

  31. Slide 31: Exploding Compute Demand

    2 / EXPLODING COMPUTE DEMAND 100MThe energy required to run AI Llama 3 tasks is accelerating, with an GPT-4 10M annual growth rate between GPT-3 26% and 36% Total power draw required 1M AI models 100k Power draw 10k 1k 100 2012 2014 2016 2018 2020 2022 2024 2026 Publication date 31 | Nasdaq: Source:

  32. Slide 32: Imbalanced Energy Supply-Demand

    3 / IMBALANCED ENERGY SUPPLY-DEMAND 30 40 of energy produced by renewable plants % goes unused. Source: Soluna Curtailment Assessments of IPPs in Pipeline. Curtailment estimates from ISO/RTO websites. Wood Mackenzie. 32 | Nasdaq: SLNH

  33. Slide 33: Renewable Energy Has a Wasted Energy Opportunity

    RENEWABLE ENERGY HAS A WASTED ENERGY OPPORTUNITY 33 | Nasdaq: SLNH

  34. Slide 34: Design Compute Around Power Availability

    DESIGN COMPUTE AROUND POWER AVAILABILITY — NOT THE OTHER WAY AROUND 34 | Nasdaq: SLNH

  35. Slide 35: All forms of renewable energy are growing faster than ever

    GW All forms of 12,000 renewable energy are growing faster than ever. 6,000 Tripling in 2030 Accelerated Case 2030 Main Case 2030 0 2022 2023 2024 2025 2026E 2027E 2028E 2029E 2030E Source: IEA data - https://www.iea.org/reports/renewables-2025/executive-summary 35 | Nasdaq: SLNH

  36. Slide 36: Soluna is the power-compute convergence

    Soluna is the power<>compute convergence – using curtailed renewable energy to power advanced computing infrastructure. 36 | Nasdaq: SLNH

  37. Slide 37: Renewable Computing

    To reach their Renewable full potential AI Energy has a & HPC need wasted energy a sustainable opportunity energy source RENEWABLE COMPUTING: Using compute itself to bridge the supply gap needed to power massively increased compute. 37 | Nasdaq: SLNH

  38. Slide 38: Renewables are a perfect match for AI

    Renewables are a perfect match for AI Renewables are a perfect match for AI Many AI workloads can be paused Renewables AI or time-shifted, allowing compute to run when wind or solar is producing instead of forcing constant grid demand. 38 | Nasdaq: SLNH

  39. Slide 39: Unique Interconnection Strategy

    Unique Interconnection Strategy Behind-the-Meter Structure Allows Our Data Centers to Remain Flexible, Drawing Power from the Grid or Renewable Power Plant and Provide Ancillary Services. Rapid Time to Interconnection. EXISTING RENEWABLE POWER PROJECT ASSETS GRID OPERATOR TELEMETRY PROJECT METER HV

  40. Slide 40: How We Source Power for Our Data Centers

    How We Source Power for Our Economic/Technical Data Centers CURTAILED curtailment from negative LMP. ENERGY DC * Energy that Energy that is would have gone SUBTRACTIVE GRID sourced from the to grid without grid in excess of the load. ENERGY ENERGY plant production. * Soluna AI Data Center. 40 | Nasd

  41. Slide 41: How We Achieve Tier-3 Uptime Behind the Meter

    How We Achieve Grid Energy 39.200% Tier-3 Uptime Behind the Meter DATA Resiliency CENTER Other Backup 2.000% UPTIME 1.982% 99.982% Downtime 0.018% Wind Energy 58.800% 41 | Nasdaq: SLNH

  42. Slide 42: Texas Wind Farm Curtailment

    CASE STUDY Texas Wind Farm Curtailment 150 MW Wind Generation Generation Curtailed 80% 60% 73% 66% 57.3% 59.7% 40% 42.7% 40.3% 34% 20% 27% 0% 2021 2022 2023 2024 Source: Soluna Data Analysis, Wind Farm Data 42 | Nasdaq: SLNH

  43. Slide 43: Soluna Converts ~50% of Curtailed Energy to Compute

    CASE STUDY Soluna Converts ~50% of Curtailed Energy to Compute 50 MW Data Center – Project Dorothy 1 Converted by Soluna Curtailed 80% 60% 40% 42.7% 40.3% 34% 20% 27% 22.6% 20.6% 16.9% 14% 0% 2021 2022 2023 2024 Source: Soluna Data Analysis, Wind Farm Data 43 | Nasdaq: SLNH

  44. Slide 44: Soluna has a massive pipeline of wasted renewable energy

    4 3GW+ Soluna has a massive pipeline of wasted renewable energy to power high performance computing. 44 | Nasdaq: SLNH

  45. Slide 45: With its concentration of renewables, Texas is the beginning

    With its concentration of renewables, Texas is the beginning… 45 | Nasdaq: SLNH

  46. Slide 46: U.S. renewable plants generate 20 TWh/yr of wasted energy

    Renewable power plants in the U.S. alone generate 20 TWh/yr of wasted renewable energy Grid-scale Renewable Power Plant Source: https://www.spglobal.com/market-intelligence/en/news-insights/research/2025/10/grid -congestion-remains-key-issue-as-data-center-load-growth-stresses-system 46 | Nasdaq: SL

  47. Slide 47: Our Power Cost Is Among the Lowest In the Industry

    Our Power Cost $80 Is Among the $80 Lowest In the $70 Industry $60 $50 $50 $40 $40 $30 $30 $20 $10 $0 Bitcoin 1 AI 2 (1) Luxor Research; Public filings from various miners Industry (2) EIA.gov | https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_a Soluna 47 | Nasdaq: SLNH

  48. Slide 48: Soluna's solution for grid and data center decarbonization

    Soluna’s solution for grid and data center -25% decarbonization As new data-heavy applications drive massive energy demand, most data centers rely on carbon-intensive grids to power these workloads. While RECs are widely used to offset emissions, they often fail to reflect real-time energy usage and

  49. Slide 49: Our Accomplishments in 2025

    Our Accomplishments in 2025 Business Project Milestones Milestones ● Gross financing activities of $142M+ to fund growth ● Project Kati (166 MW) groundbreaking completed and ● Closed up to $100M credit facility with Generate Capital began construction ● Launched $87M ATM program ● Signed 48 MW Galaxy

  50. Slide 50: The Soluna Way

    Source The low-cost curtailed Soluna power from IPPs Way Grow Build, own, pipeline operate data centers We tackle wasted energy through digital infrastructure. As we optimize the grid and serve our customers, we fuel our growth, funding further expansion to make renewable energy a superpower. Grow A

  51. Slide 51: We serve some of Bitcoin's most successful miners

    We serve some of Bitcoin’s most 87.6 67 Total EH/s2 Total No. Facilities 22.1 7.5 successful miners % Here’s a snapshot of our customers’ total mining Average J/TH Percentage of portfolios.1,2 Bitcoin Network (1) Source: Public filings, Luxor Research, Bitcoin Network, and Customer Surveys (2) Total

  52. Slide 52: What Our Customers Are Saying

    What Our Customers Are Saying Partnering with Soluna has been a Soluna is a real delight to work with. Soluna’s expertise in optimizing mining game-changer for Compass. Their Their approach is professional, operations has allowed BitMine to scale commitment to operational excellence hands-on, and pr

  53. Slide 53: Meet the Soluna Leadership Team

    Meet the Soluna Leadership Team 150 years of combined experience in starting, managing, and leading companies John Belizaire Michael Toporek Michael Picchi Jessica Thomas Mary O’Reilly Chief Executive Officer Executive Chairman Chief Financial Officer Chief Accounting Officer Chief People Officer Jim Re

  54. Slide 54: Learn more at solunacomputing.com

    Learn more at solunacomputing.com 54 54 | | Nasdaq: SLNH Nasdaq: SLNH

  55. Slide 55: Connect With Us

    Connect With Us X / Twitter LinkedIn Newsletter @SolunaHoldings Soluna Holdings bit.ly/solunasubscribe 55 | Nasdaq: SLNH

  56. Slide 56: Appendix

    Appendix 56 | Nasdaq: SLNH

  57. Slide 57: For Soluna's 2025 full-year results, click here

    For Soluna’s 2025 = full-year results, click here to download the presentation 57 | Nasdaq: SLNH

  58. Slide 58: Project Finance & Unit Economics

    Project Finance & Unit Economics 58 | Nasdaq: SLNH

  59. Slide 59: Our Corporate Structure Supports Flexible Capital Formation

    Our Corporate Structure Supports Flexible Capital Formation for Infrastructure Capital formation occurs at project-level and at parent-level companies. Bitcoin is separate Soluna Holdings, Inc. from AI. (SLNH) Soluna Digital, Inc. Soluna HPC, Inc. BTC Project Co BTC Project Co AI Project Co AI Proje

  60. Slide 60: Bitcoin Data Center Project ROIC

    Bitcoin Data Center Project 1 Project Return on Invested Capital (ROIC 2) ● 44 months to return capital YR 1 YR 2 YR 3 YR 4 YR 5 YR 6 YR 7 YR 8 YR 9 YR 10 YR 11 5 ● 34.9% IRR3 26,784 ● 225% ROIC2 9,284 9,284 CAPEX 9,314 Net Cash Flow4 9,284 9,284 9,284 9,295 9,246 6,686 (25,197) IRR 3 — — — 0.1% 14.

  61. Slide 61: Bitcoin Data Center Project Soluna ROIC (25% ownership)

    Bitcoin Data Center Project 1 Soluna ROIC 2 (25% ownership) ● 38 months to return capital YR 1 YR 2 YR 3 YR 4 YR 5 YR 6 YR 7 YR 8 YR 9 YR 10 YR 11 5 ● 50.1% IRR3 16,740 ● 755% ROIC2 5,802 5,802 CAPEX 5,821 Net Cash Flow4 5,802 3,328 2,843 2,847 2,832 2,048 (6,299) IRR 3 — — — 11.2% 24.8% 33.0% 40.6%

  62. Slide 62: We finance our projects using Project Level Equity and Debt

    We finance our projects using a combination of Project Level Equity and Debt ProjectCo Soluna Spring Lane Navitas Soluna Developer Soluna Developer Debt Owner Equity Owner Equity Equity Profit “Pre-Flip”5 Profit “Post-Flip”6 Dorothy 1A 14.6% 85.4% - 0% 10%/50%(1) - Dorothy 1B 51% - 49% n/a n/a - Doroth

  63. Slide 63: Project Cash Flows Bitcoin Hosting Pre Flip

    Project Cash Flows Bitcoin Hosting Pre Flip 1,2,3 We make money from services fees, developer profit and our share of owner profit. PROFIT SLNH JV Partner 3rd Party $21.26 $35.06 $43.68 (1) “Pre Flip” refers to project timeline prior to reaching the JV partner target economics, at which time the % of

  64. Slide 64: Project Cash Flows Bitcoin Hosting Post Flip

    Project Cash Flows Bitcoin Hosting Post Flip 1,2,3 After the “Flip” our developer profit increases significantly. PROFIT SLNH JV Partner 3rd Party $37.37 $18.95 $43.68 (1) “Pre Flip” refers to project timeline prior to reaching the JV partner target economics, at which time the % of developer profit in

  65. Slide 65: Project Cash Flows Bitcoin Prop Mining

    Project Cash Flows Bitcoin Prop Mining 1,2 We make money from services fees and our share of owner profit. PROFIT SLNH JV Partner 3rd Party $24.72 $20.58 $54.70 (1) All values are indicative based on certain key assumptions which may vary from any actual project specifically (2) Key assumptions: a) 20

  66. Slide 66: Summary of Existing Debt

    Summary of Existing Debt 1 $14.0m subsidiary debt (no Soluna Holdings guarantee); $10.1m GreenCloud debt (with Soluna Holdings guarantee)2 Amort Debt Tranche (Entity) / (Guarantor) Total Remaining GreenCloud (Cloud) / (Holdings)3 $10,055 ~2 years Spring Lane Equipment (Dorothy 2) / (None)4 $250 n/a

  67. Slide 67: AI / HPC Data Center Project ROIC

    1 AI / HPC Data Center Project ROIC 2 ● Capital is returned at refinance ● 37.7% IRR3 ● 560% ROIC2 YR 1 YR 2 YR 3 YR 4 YR 5 YR 6 YR 7 5 1,759,092 560% ROIC2 CAPEX Net Cash Flow4 37.7% IRR3 (213,333 10,234 9,290 8,457 7,795 6,391 ) (106,667 ) (1) Key assumptions: (a) Assumes 18-month build period and

  68. Slide 68: AI / HPC Data Center Soluna ROIC

    AI / HPC Data Center 1 Soluna ROIC 2 ● Significant uplift to both IRR and ROIC, driven by equity uplift of delivering power and land to YR 1 YR 2 YR 3 YR 4 YR 5 YR 6 YR 7 5 the project 194,751 ● 58.5% IRR3 ● 1,209% ROIC2 1,209% ROIC2 CAPEX Net Cash Flow4 58.5% IRR3 (11,000) 1,135 1,030 938 864 709 (5

  69. Slide 69: Data center demand shifts into hyperdrive

    Data center 2026 data center tenant demand by user type (% of GW) demand shifts into hyperdrive, fueled by recently unlocked AI Hyperscalers Neoclouds capabilities AI companies (pure-plays) Traditional cloud (excl. hyperscalers) Financial services Source: JLL Research All other industries 69 | Nasda

  70. Slide 70: Texas could overtake Virginia as largest data center market by 2030

    Texas could overtake Virginia as the largest global data center market by 2030 due to plentiful land and energy 2025 year-end leased data center and hyper-owned capacity (GW) Existing Under construction 12 8 4 0 Virginia Texas Pac. Northwest Ohio Georgia Arizona Tennessee Illinois Wisconsin Californ

  71. Slide 71: 92% of development pipeline precommitted, vacancy near zero

    With 92% of the development pipeline precommitted vacancy is likely to remain near zero for several years North America data center vacancy (%) 6% 5% 4% 3% 2% 2% 2% 1% 1% 0% YE ‘20 YE ‘21 YE ‘22 YE ‘23 YE ‘24 YE ‘25 Source: JLL Research. Note: Vacancy reflects leased and hyper-owned inventory. 71 | N