KGHM Polska Miedz S.a. · GPW:KGH
KGHM Polska Miedz — 9M 2016 Earnings Presentation
29 slides from KGHM Polska Miedz's earnings presentation, Nov 10, 2016
Slide 1: Layers of possibilities: Results of the Group for the first 9 months of 2016
Layers of possibilities Results of the Group for the first 9 months of 2016 10 November 2016
Slide 2: Cautionary Statement
Cautionary Statement This presentation was prepared by KGHM Polska Miedź S.A. (KGHM). The presentation is strictly of an informational nature and should not be construed as containing investment advice. The users of this presentation are solely responsible for their own analysis and assessment of th
Slide 3: Introduction
KGHM POLSKA MIEDZ Introduction
Slide 4: Highlights of the first 9 months of 2016 in the Group
Highlights of the first 9 months of 2016 in the KGHM Polska Miedź S.A. Group Key events Ramp-up of the flash furnace at the Głogów I smelter underway Review of KGHM International assets – the process of reviewing the international assets is near completion Sierra Gorda – production of copper in conc
Slide 5: Review of the assets of KGHM International
Review of the assets of KGHM International Sierra Gorda Sulphide & Oxide In March 2016, the Management Board of KGHM Polska Miedź S.A. decided to commence a review of the Company’s international assets aimed at preparing a comprehensive, uniform model, confirmed by external experts, of functioning
Slide 6: Sierra Gorda
Sierra Gorda Jointly with Sumitomo, the company is reviewing the technical and economic assumptions related to the operations and development of Sierra Gorda throughout its mine life. This review encompasses the development of the Sierra Gorda mine under 3 scenarios: further development of the p
Slide 7: Key domestic projects
KGHM POLSKA MIEDZ Key domestic projects
Slide 8: Ore access program in KGHM's concessioned areas in Poland
Ore access program in KGHM’s concessioned areas in Poland Deep Głogów (GGP) area Work performed in the first 9 months of 2016 Status of the Ore Access Program (OP) Area of development-preparatory tunneling Share of production from Deep Głogów completed (in meters) in total production in Poland The
Slide 9: Metallurgical Development in KGHM: Flash Furnace at Głogów I
Metallurgical Development in KGHM Construction of a Flash Furnace and associated infrastructure at Głogów I Work performed in the first 9 months of 2016 Status pf Pyrometallurgy Modernisation Expected impact Major facilities realised Program (PMP) Equipment and installations were Start-up of the
Slide 10: Final stage reached in starting production by the modernised Głogów I smelter-refinery
Final stage reached in starting production by the modernised Głogów I smelter-refinery 3-month shutdown related to the change in technology at the Głogów I Start of production in the modernised smelter/refinery Głogów I smelter/refinery Start-up of the Flash Furnace at the Głogów I smelter/refinery
Slide 11: Macroeconomic environment
KGHM POLSKA MIEDZ Macroeconomic environment
Slide 12: Copper price remains low, precious metals provide support; USD strengthened versus PLN
The copper price remains low, while precious metals provide support; the USD strengthened versus the PLN Precious metals prices remain under the impact of Lower copper prices with a weaker PLN market expectations regarding changes in interest rates Copper price (USD/t) Silver price (USD/oz t) Probab
Slide 13: Chinese government seeking economic stability; property rally; rising cathode premiums
The Chinese government is seeking economic stability; a clear rally in the property sector; copper cathode premiums rising in the local Chinese market Average housing prices in the largest cities have Physical premiums in China have risen in recent been rising dramatically since the start of the yea
Slide 14: Economic results of the KGHM Polska Miedź S.A. Group
Economic results KGHM Polska Miedź S.A. Group
Slide 15: Higher copper equivalent production by the Group
KGHM Polska Miedź S.A. KGHM INTERNATIONAL Sierra Gorda (55%) Higher copper equivalent production Payable copper production (kt) by the Group 538 -6% 507 The higher production of copper 33 73 69 38 Production of copper equivalent from own concentrates in the 432 401 equivalent Group was due to high
Slide 16: Decrease in C1 unit cost in the Group
Decrease in C1 unit cost in the Group C1 – KGHM Polska Miedź S.A. C1 cost in the Group in the first 9 months of C1 – Group (USD/lb) (USD/lb) 2016 was lower by 13%, mainly due to an +1% 1,49 -14% 1,50 increase in the value of associated metals. 1,28 0,44 0,45 Under the metals prices and exchange ra
Slide 17: Operating results of the Group
Segment Segment Segment Other segments KGHM Polska Miedź S.A. KGHM INTERNATIONAL Sierra Gorda Operating results of the Group Adjusted EBITDA in KGHM International (mn USD) Adjusted EBITDA * The decrease in the Group’s EBITDA by PLN 558 million was mainly (mn PLN) due to the fall in the price of co
Slide 18: Financial results of the Group
Segment Segment Segment Other KGHM Polska Miedź S.A. KGHM INTERNATIONAL Sierra Gorda Financial results of the Group Profit for the period Profit for the period of the segment KGHM Polska Miedź S.A. (mn PLN) mn PLN Profit for the period of KGHM Polska Miedź S.A. decreased by 23%. 1 228 1 675 1 28
Slide 19: Net debt of the Group
Net debt of the KGHM Polska Miedź S.A. Group Consistently, pursuant to the financial strategy adopted by KGHM Polska Miedź S.A., the basic currency in which debt is incurred is the USD (natural hedging). KGHM Group net debt USD 191 mn The increase in the Group’s debt in the period January-Septem
Slide 20: Economic results of KGHM Polska Miedź S.A.
Economic results of KGHM Polska Miedź S.A.
Slide 21: Stable level of mine production
Stable level of mine production Ore extraction Production of Cu Electrolytic copper Metallic silver production (mn t dry weight) in concentrate production (t) (kt) (kt) 916 -3% +2% 888 23,9 24,3 432 From purchased -7% 323 -- 401 323 metal-bearing Silver grade materials 111 in ore (g/t) 120 44,3 From
Slide 22: Revenues from sales in the first 9 months of 2016
Revenues from sales in the first 9 months of 2016 Sales of copper and copper Silver sales (t) Sales revenue products (kt) (mn PLN) 869 846 -7% 415 385 Other 11 773 -13% 745 10 284 Silver 1 691 1 076 1 825 -3% of which wire rod Copper and 192 197 copper products 9 337 9M'15 9M'16 9M'15 9M'16 7 382 15
Slide 23: Cost discipline maintained
Cost discipline maintained Expenses by nature (mn PLN) Total expenses by nature as compared to the first 9 months of -2% 9 492 Minerals extraction 2015 were lower by PLN 195 million, alongside higher costs of 9 297 tax consumed metal-bearing materials purchased by PLN 9 million 1 135 942 (11 kt mo
Slide 24: Financial results in the first 9 months of 2016
Financial results in the first 9 months of 2016 Adjusted EBITDA Profit for the period (mn PLN) (mn PLN) 3 252 -26% -23% 1 675 The decrease in adjusted EBITDA by PLN 858 million (-26%) was 2 394 1 282 mainly due to the deterioration in metals prices and to the lower sales volumes (due to the planne
Slide 25: Accrued result on derivatives as at 30 September 2016 – metals and currencies
The accrued result on derivatives achieved by KGHM Polska Miedź S.A. as at 30 September 2016 amounted to PLN 27 million Market risk management – hedging position (as at 30 September 2016) Position in derivatives on the metals and currencies markets Copper USD/PLN transactions entered into in the fir
Slide 26: Accrued result on derivatives as at 30 September 2016 – interest rates
The accrued result on derivatives achieved by KGHM Polska Miedź S.A. as at 30 September 2016 amounted to PLN 27 million Market risk management – hedging position (as at 30 September 2016) Position in derivatives on the interest rates markets Interest rate (LIBOR 3M USD) Result on derivatives in mill
Slide 27: Summation
KGHM POLSKA MIEDZ Summation
Slide 28: Priorities of the KGHM Management Board in the coming months
Priorities of the KGHM Management Board in the coming months Maintain tight cost discipline to further increase operating Focus on further profitability improvements in 1 operational Continue key domestic development projects: OP and PMP efficiency Carry out further work to increase ore proces
Slide 29: Thank you!
Download KGHM IR mobile app! Thank you! Investor Relations kghm.com/en/investors [email protected] +48 76 74 78 280 29