Saatvik Green Energy Ltd. · NSE:SAATVIKGL

Saatvik Green Energy — Q1 FY27 Earnings Presentation

26 slides from Saatvik Green Energy's earnings presentation, Aug 14, 2026

  1. Slide 1: Exchange cover letter for Q1 FY27 investor presentation

    Ref.: SGEL/SE/2026-27/36 August 14, 2026 To, To, Listing Department Listing Department BSE Limited National Stock Exchange of India Limited Phiroze Jeejeebhoy Towers, Dalal Street Exchange Plaza, C-1, Block G, Bandra Kurla Mumbai – 400001 Complex Bandra (E), Mumbai – 400 051 Scrip Code: 544526 Symbo

  2. Slide 2: Q1 FY27 Investor Presentation

    Q1 FY27 INVESTOR PRESENTATION August 2026 "Integrating the Value Chain. Scaling the Opportunity."

  3. Slide 3: Disclaimer

    DISCLAIMER This presentation and the accompanying slides (the “Presentation”), which have been prepared by Saatvik Green Energy Limited (the “Company”), are solely for information purposes and do not constitute, and should not be construed as, any offer, recommendation, or invitation to purchase or

  4. Slide 4: Odisha Project: Accelerating Our Journey Towards Integration

    ODISHA PROJECT : Accelerating Our Journey Towards Integration

  5. Slide 5: Odisha Project Phase 1: Integrated Manufacturing Campus

    ODISHA PROJECT Phase 1 : Integrated Manufacturing Campus Building Ready. Site Ready. Revenue Generation Ahead 57 Acres | 2.4 GW Cell Capacity | 4 GW Module Capacity

  6. Slide 6: Odisha Project Phase 2 and 3: Expanding Capacity

    ODISHA PROJECT Phase 2 and 3 : Expanding Manufacturing Footprint Expanding Capacity. Deepening Integration. Phase 2 Phase 2 ▪ 27-acre land parcel adjacent to Phase 1 integrated manufacturing campus. ▪ +3.6 GW cell manufacturing capacity, taking total cell capacity to 6 GW. ▪ Site activities to comme

  7. Slide 7: Project Status: 2.4 GW Cell Line (Phase I)

    PROJECT STATUS Odisha 2.4 GW Cell Line (Phase I) Milestones Achieved ▪ Tool move-in activities have started. ▪ Tool assembly and associated installation activities have commenced. ▪ The electrical room is ready for charging. ▪ Compressor installation and associated piping works completed. ▪ HVAC duc

  8. Slide 8: Project Status: 4 GW Module Line (Phase I)

    PROJECT STATUS Odisha 4 GW Module Line (Phase I) Milestones Achieved ▪ Tool movement and installation successfully completed. Upcoming Milestones ▪ Tool and Utility testing and validation in progress. ▪ Trial runs and performance verification. ▪ Process optimization and stabilization. Module line ra

  9. Slide 9: Our Vision: From Solar Manufacturer to Integrated Energy Platform

    OUR VISION : From Solar Manufacturer to Integrated Energy Platform

  10. Slide 10: Building an End-to-End Energy Platform

    Expanding Capacities for Building an End-to-End Energy Platform Each stage of the value chain is being built with a defined capital plan and a well-defined timeline INGOTS & CELL ENCAPSULANT MODULE WAFERS Planned Under construction Commissioned — 2 GW live Established — 4.8 GW live CAPACITY OUTLOOK

  11. Slide 11: From Established Capabilities to Deeper Integration

    OUR VISION Strengthening Our Integrated Manufacturing Platform From established capabilities to Deeper Integration HARYANA (AMBALA) ODISHA (GOPALPUR) Established Manufacturing Base Next-Generation Integrated Hub Cell Ingots and Encapsulant Module Encapsulant Ancillaries Transformers Module Wafers Ne

  12. Slide 12: One Portfolio. Multiple Solar Applications

    OUR VISION Extending Saatvik's presence across utility, C&I, agriculture and distributed energy One Portfolio. Multiple Solar Applications UTILITY SCALE C&I DISTRIBUTED AGRICULTURE RESIDENTIAL AND SMALL C&I Ground Mounted Projects Rooftop Projects Solar Pumps Solar Kits Enabled by MODULES INVERTERS

  13. Slide 13: Industry Opportunity

    INDUSTRY OPPORTUNITY

  14. Slide 14: India's Solar Demand Outlook Remains Strong

    INDUSTRY HIGHLIGHTS India’s Solar Demand Outlook Remains strong Key Demand Drivers C&I consumers account for Projected Peak Electricity Demand (GW) India targets 500 GW non-fossil ~20–25 GW open access solar capacity by 2030 opportunity • Current installed renewable capacity: • Large corporates incr

  15. Slide 15: India's Solar Manufacturing Shift

    INDUSTRY HIGHLIGHTS India’s Solar Manufacturing Shift ALMM Accelerating India's Transition Towards Integrated Solar Manufacturing The industry is transitioning from module-led to cell-led competitiveness, with integrated manufacturing ADVANTAGE TO SAATVIK emerging as the key differentiator under Ind

  16. Slide 16: The Opportunity: Why Now, Why India, Why Saatvik

    INDUSTRY HIGHLIGHTS The Opportunity Why now, why India, why Saatvik INDIA'S SOLAR HEADROOM Saatvik’s Strategic Positioning Only 15.4% of India's 750 GW solar potential harnessed CAPACITY 4.8 GW module capacity → 8.8 GW by FY27 01 — massive runway remains 2 GW EPE encapsulant; 6 GW cell capacity unde

  17. Slide 17: Financial Performance

    = FINANCIAL =” PERFORMANCE

  18. Slide 18: Summary of Financial Performance

    FINANCIAL PERFORMANCE Summary of Financial Performance Production 759 (In MW) Sales (In MW) Revenue from Operations (INR Mn) EBITDA (INR Mn) 9,157 685 579 361 408 5,110 334 Q3FY25 Q1 Q3FY26 FY26 Q1 FY27 Q1 FY26 Q1 FY27 Q1 FY26 Q1 FY27 EBITDA (INR Mn) Profit After Tax (INR Mn) Debt/Equity Ratio 19.40

  19. Slide 19: Order Book Evolution Snapshot

    FINANCIAL PERFORMANCE Order Book Evolution Snapshot RECENT ORDER WINS STRONG ORDER BOOK Aug 11, 2026 – ₹400.16 Cr Currently 6.35 GW Orders aggregating to ₹400.16 crore received and accepted for the supply of modules. Execution by March 2027 July 22, 2026 – ₹138.00 Cr Secures a ₹138 crore domestic so

  20. Slide 20: Statement of Profit & Loss

    FINANCIAL RESULTS Statement of Profit & Loss Figures in INR Mn Quarter Ended Year Ended Particulars June 30, 2026 March 31, 2026 June 30, 2026 FY26 (Audited) (Unaudited) (Audited) (Audited) Revenue from operations 5,110 16,077 9,157 45,484 Other Income 87 90 40 396 Total Income 5,197 16,166 9,197 45

  21. Slide 21: Appendix

    a YY) [=D APPENDIX

  22. Slide 22: Strengthening Our Credentials: Awards & Accolades

    Awards & Accolades Strengthening Our Credentials 'Brand of the Year' award at the India Power & Renewable Leadership Awards 2026 Golden Peacock Occupational Health & Safety Award 2026

  23. Slide 23: Sustainability Initiatives

    SDG Aligned Sustainability Initiatives EDUCATIONAL CSR EQUAL OPPORTUNITY COMPREHENSIVE EMPLOYEE EMPLOYMENT PRACTICES Developing smart classrooms in government HEALTH PROGRAMS schools, providing scholarships, installing safety with special safety support initiatives for girls including regular check-

  24. Slide 24: Sustainability Initiatives

    SDG Aligned Sustainability Initiatives COMPREHENSIVE WASTE TECHNOLOGY EXCELLENCE through energy-efficient equipment deployment MANAGEMENT SIGNIFICANT RENEWABLE ENERGY including IE3+ motors, advanced compressors, and Systematic waste segregation, hazardous waste ADOPTION comprehensive LED lighting sy

  25. Slide 25: Community Empowerment Activities

    COMMUNITY EMPOWERMENT ACTIVITIES Healthcare Skilling Healthcare Healthcare Blood Center setup at Ambala Local Youth Community Engagement Supporting Differently Abled person Supporting Paraplegic Patients Education Education – School Transformation Skilling Community Learning Centre, Faridabad Public

  26. Slide 26: Thank You

    THANK YOU SAATVIK GREEN ENERGY LIMITED Saatvik Green Energy Limited Adfactors IR Mr. Chetan Dhundele Saloni Nagvekar/ Tejaswee Gaonkar [email protected] [email protected] [email protected] Email : [email protected] Website : https://saatvikgroup.c

Saatvik Green Energy — Q1 FY27 Earnings Presentation on 6ix