Energy Resources of Australia Ltd. Class A · ASX:ERA
Energy Resources of Australia Ltd. Class A — Investor Presentation (April 2010)
26 slides from Energy Resources of Australia Ltd. Class A's investor presentation, Apr 22, 2010
Slide 1: Energy Resources of Australia Ltd
Energy Resources of Australia Ltd Dan Janney General Manager Operations 22 April 2010
Slide 2: Welcome to Ranger Mine
Welcome to Ranger Mine Ce) 1212 Resources of austraa i
Slide 3: Safety briefing
Safety briefing ¾ Actions in the event of a fire ¾ Actions in the event of an ammonia release ¾ Personal protective equipment (PPE) requirements ¾ Heat and dehydration
Slide 4: Acknowledgement
Acknowledgement The operations of Energy Resources of Australia Ltd are located on Aboriginal land and are surrounded by, but separate from, Kakadu National Park. ERA respectfully acknowledges the Mirarr, Traditional Owners of the land on which the Ranger Mine is situated.
Slide 5: Forward-looking statements
Forward-looking statements This presentation contains statements which may include predictions as to the future, and which may constitute forward-looking statements within the meaning of Australian or US securities laws. Such statements include, but are not limited to, statements with regard to capa
Slide 6: Uranium – powering the world
Uranium — powering the world ERA’s uranium is used to produce electricity to power these and many other cities: Stockholm Hong Kong ) ERA Energy Resources of Australia Ltd
Slide 7: The power of the atom
The power of the atom One drum of natural uranium contains the energy equivalent of 40,000 barrels of oil. The combustion of those same quantities of fossil fuels contribute enough CO2 emissions volumetrically to fill about 125 train cars. …The direct emissions from uranium used in power generation
Slide 8: A proven and reliable alternative
A proven and reliable alternative Electricity generated by a 1GW reactor at 90% 7,900,000,000 kWh Capacity in 1 year:- (7.9 bn kWh)
Slide 9: Organisation
Organisation ERA Board Chairman David Klingner Chief Executive Rio Tinto Uranium Rob Atkinson Managing Director Clark Beyer GM Tech Projects GM External Relations GM GM – Enviro CFO & Company Operations Strategy Secretary Dr Greg Sinclair David Paterson Dan Janney Dr Tony Milnes Steeve Thibeault Man
Slide 10: Background
Background ¾ Over 30 years of uranium mining experience at Ranger mine: one of the world’s largest uranium mines ¾ World class resources with significant expansion opportunities ¾ Remote location in a culturally sensitive region – unique operating environment surrounded by the World Heritage Kakadu
Slide 11: ERA leases
ERA leases ¾ Operations located 260 km east of Darwin ¾ Progressively surrounded by, but remains separate from, the 19,803sq km of Kakadu National Park ¾ Ranger project area is 79 sq km _______________________________ ¾ Jabiluka Mineral Lease is 73 sq km ¾ Jabiluka project site is 17 ha ¾ Located on
Slide 12: Ranger mine site
Ranger mine site Current Pit Magela Creek Stockpiles Plant & Infrastructure Previous Pit Tailings Storage Facility
Slide 13: Ranger mill process
Ranger mill process Uranium Extraction Process STOCKPILES OF ORE _ uae wii $= wat Energy Resources of Australia Ltd
Slide 14: ERA's health and safety performance
ERA’s health and safety performance ERA - LTIFR / AIFR by Year 5.0 AIFR LTIFR 4.0 3.0 2.0 1.0 Other industries' LTIFR 0.0 15.2 2004 2005 2006 2007 2008 2009 16 14.5 14.3 14 12.9 11.4 12 9.9 10 9.3 8.6 8 6 ERA 2.04 4 2009 2 0 y g g ity n e l it e y in in ad io tr ag un ta in ur ct es tr or pi M ct m
Slide 15: Radiation monitoring
Radiation monitoring At Ranger radiation exposure for radiation workers is measured by combining exposures from three sources: ¾ Inhalation of airborne dust ¾ Inhalation of radon decay products ¾ External radiation from gamma rays Designated Worker Mean Annual Radiation Dose 50 Maxim um Recom m ende
Slide 16: Our people
Our people ERA Indigenous Employment Indigenous Employment 110 20% 100 ¾ 91 at end of December (17.5%) 18% 90 Number Percentage ¾ Variety of roles from trainee to 80 Number of Indigenous Employees 16% % Indigenous Employees 70 60 manager ¾ Success in Gunbalanya 14% 50 40 12% 30 20 10% 10 0 8% 2006 2
Slide 17: ERA's work with the Mirarr People
ERA’s work with the Mirarr People ¾ All new employees participate in Cross Cultural Awareness training developed and delivered by the Gundjehmi Aboriginal Corporation (GAC) ¾ Development of Cultural Heritage Management Plan in consultation with GAC ¾ Ongoing Heritage, Archaeological, Anthropological
Slide 18: Jabiru infrastructure & ERA
Jabiru infrastructure & ERA ¾ ERA employees are a major part of the town population ¾ Majority of houses, supermarket, specialty shops, and the Jabiru Sports and Social Club are ERA-owned buildings ¾ Power to town is supplied by Ranger Powerhouse ¾ Airport is also part of ERA infrastructure
Slide 19: Protecting our environment
Protecting our environment ¾ Ranger mine has been operating since 1979 without detriment to the surrounding environment or to Kakadu National Park (source: Commonwealth Office of the Supervising Scientist) ¾ ISO 14001 – Certified Environmental Management System
Slide 20: Environment
Environment Complex network of regulators: ¾ The NT Government through the Dept of Resources ¾ The Commonwealth Government Supervising Scientist Division (SSD), the Dept of the Environment, Water, Heritage & the Arts; the Dept of Resources, ¾ Aboriginal interests: traditional owners and the Northern
Slide 21: Water management
Water management ¾ Process Water – water used directly in the process plant – stored in Pit 1 and Tailings Dam Disposal via evaporation and Water Treatment Plant ¾ Pond water – water that has been mainly in contact with mining operations – stored in pit 3 and retention pond 2 Disposal involves direc
Slide 22: Water treatment facilities
Water treatment facilities ¾ Plant treats ~ 11-12ML/day of pond water ¾ Front end of the process water treatment circuit was commissioned in 2009 and treats ~ 1ML/day of process water
Slide 23: Heap leach facility & accommodation layout
Heap leach facility & accommodation layout
Slide 24: Ranger 3 Deeps exploration target
Ranger 3 Deeps exploration target Perspective to west: One possible location of entrance to exploration decline (provisional layout and decline design concept) One possible concept for the location of a decline to provide exploration access to Ranger 3 Deeps
Slide 25: Summary
Summary ¾ Over 30 years of uranium mining experience in the Northern Territory ¾ One of the world’s largest uranium mines ¾ Ownership of one of the world’s largest undeveloped uranium resources ¾ Culturally sensitive region ¾ Highly regulated operating environment ¾ Significant expansion opportuniti
Slide 26: www.energyres.com.au
www.energyres.com.au
Energy Resources of Australia — Investor Presentation (April 2010) on 6ix