Gbm Resources Limited · ASX:GBM

Gbm Resources — Non-Deal Roadshow (November 2012)

29 slides from Gbm Resources's roadshow presentation, Nov 26, 2012

  1. Slide 1: Targeting World-Class IOCG Systems

    Targeting World – Class IOCG Systems ASX :GBZ www.gbmr.com.au gbm

  2. Slide 2: Disclaimer

    Disclaimer  This Document is Confidential and may not be reproduced, redistributed or passed on, directly or indirectly.  This Document is not a Prospectus nor an Offer to Subscribe for Shares.  GBM and its Directors, employees and consultants make no representations or warranty as to the accurac

  3. Slide 3: Corporate Snapshot

    Corporate Snapshot Capital Structure (ASX: GBZ) Board of Directors Ordinary shares 267 m Peter Thompson Chairman & Managing Director Listed 20 cent Options 129 m Neil Norris Exploration Director Expiring 30/06/13 Cameron Switzer Non-Executive Director Market Capitalisation @ 5c A$13m Sunny Loh Non-E

  4. Slide 4: Milo IOCG – REE Project

    MILO IOCG – REE PROJECT gbm

  5. Slide 5: Milo Project Location

    MILO PROJECT LOCATION • Queensland’s North West Mineral Province (Mt Isa Inlier) • Prolific Mineral Province • Low Sovereign Risk gbm

  6. Slide 6: The Milo Discovery

    THE MILO DISCOVERY Massive breccia outcrop at Milo Poly metallic discovery in 2010. Cu Au Ag Mo U Co. Significant Rare Earth Element mineralisation identified in 2011. Milo is a multi- element IOCG project with a Rare Earth halo. Work so far considered as “early exploration” phase with only 11,0

  7. Slide 7: Milo Project Scoping Study

    MILO PROJECT SCOPING STUDY  11 Year Mine Life  10 mtpa treatment rate  100 Mt ore mined  Low Stripping Ratio (W:O, 1.3:1 )  LOM Production; • 38Kt TREEYO • 1.9Mt Phosphate • 58Kt Cu • 10Mlbs U3O8  Capex Start up-$792M LOM - $ 60M tailings -$52M sustaining - $41M closure  Published 22/11/12 gb

  8. Slide 8: Milo Scoping Study

    MILO SCOPING STUDY  Completed by Independent Consultant Mining One & supported by: • Geomodelling Ltd for the resource and block. • Core Resources Pty Ltd for test work and flow sheet.  AIM is to demonstrate that we can mine it , treat the various ore types, what the capital required will be and w

  9. Slide 9: Milo Project Financial KPIs

    MILO PROJECT FINANCIAL KPI’s • Strong operating cashflows Long Term Project KPIs Base Case Upside Case • Product diversity providing Undiscounted Cash ($M) $701 $1,160 natural price hedge Pay back in years 4.4 2.9 • Significant upside on Operating Margin ( EBIT/ commodity prices Revenue) 33% 38% Ope

  10. Slide 10: Milo Open Pit

    MILO OPEN PIT • Large open pit • 1400 m long • 600 m wide • 320 m maximum depth • Bulk mining scale advantage • 100 Mt ore • 128Mt waste and LG • Close to established infrastructure • Skilled Mining work force and supportive communities in Cloncurry, Isa & Townsville gbm

  11. Slide 11: Milo Metallurgy

    MILO METALLURGY Initial Heavy Media Separation confirms potential to reject low grade/waste material Sulphide floatation separates Cu-Au-Ag-Mo-Co Saleable Cu concentrate produced Apatite floatation produces phosphate product Wet High Intensity Magnetic separation capture REEY’s Magnetic separa

  12. Slide 12: Milo Mine Design

    MILO MINE DESIGN General Mine Layout gbm

  13. Slide 13: Milo Project Resource

    MILO PROJECT RESOURCE • IOCG-REE Breccia Deposit • Key Commodities –rare earths, copper, uranium and phosphate. • Valuable metal mix • 108Kt TREEYO • 1.3 Mt P2O5 • 97Kt Cu • 14Mlbs U3O8 gbm

  14. Slide 14: Milo Inferred TREEYO Resource

    Milo Inferred TREEYO Resource • Broad continuous zone over 1 kilometre long • Large Resource -176Mt and expansion potential • Contains: 108,000 t TREEYO 1.3 Mt P2O5 • ‘halo’ to CuEq mineralisation • Remains open at depth and along strike 176 Mt @ 620 ppm TREEYO, 0.75%P2O5 . gbm

  15. Slide 15: Milo Inferred TREEYO Resource

    Milo Inferred TREEYO Resource • Critical REEY 24% by weight • Critical REEY 72% by value • High importance clean • Buffer against LREE prices energy industries • Forecast shortage and positive price reaction gbm

  16. Slide 16: Rare Earths – Market

    RARE EARTHS- “Market” USES SUPPLY: PRICING: • China accounts for • China has • Critical: 97% of world restricted and LED’s supply eased supply Wind power generators • Imposed export = Price volatility Electric vehicles quota 30K tonnes Increase reserves Hard disk drivers domestic demand Flat screens

  17. Slide 17: Milo Inferred CuEq Resource

    Milo Inferred CuEq Resource • Wide zones over 1 kilometre long • Contains; 97,000 t Cu 126 kozs Au 4.6 Mozs Ag 5,700 t Mo 14 Mlbs. U3O8 • Remains open at depth and along strike 88 Mt @ 0.34% CuEq, 0.11% Cu, 72 ppm U3O8. gbm

  18. Slide 18: Milo Resource Commodities – Relative Value

    Milo Resource Commodities- Relative Value • TREEYO represent around three quarters of the value of contained commodities • Copper and Uranium are the next most important commodities by relative value (The Queensland Gov’t has announced it intends to allow the recommencement of Uranium mining) gbm

  19. Slide 19: Near Pit Potential?

    MILO NEAR PIT POTENTIAL ? Strong Cu-REE-U soil geochemical anomaly Backdrop: gridded La soil geochemistry gbm

  20. Slide 20: Milo – Resource Growth

    MILO – RESOURCE GROWTH • ‘In Pit’ exploration target(*3) of 12.3 Mt and 23.0 Mt. between 300 and 900 ppm TREEYO • Depth and strike extent of Milo Deposit • High order soil geochemical targets existing resource boundary. gbm

  21. Slide 21: Milo Next Steps and Opportunity

    Milo Next Steps and Opportunity AIM: Commence Pre- feasibility study (PFS) in 2013. Challenge : Securing JV partner/s. Key areas of development include: • Metallurigical Test work- validate flowsheet and process design. • Upgrade inferred Resource to Indicated. • Geotechnical and infrastructure stud

  22. Slide 22: Milo Project – Conclusions

    MILO PROJECT - CONCLUSIONS  Confirms strong commerical development opportunity.  Financial Model : • Long Term Base Case operating cash flow $701M over 11 yrs LOM. • Upside Case operating cash flow $1,160M same LOM.  Can mine it - favourable metallurgy.  Multi-element nature price hedge.  Milo

  23. Slide 23: GBM Exploration

    GBM EXPLORATION gbm

  24. Slide 24: Eastern Australia Gold

    EASTERN AUSTRALIA GOLD Mayfield • Extensions to Tick Hill (Au) & Trekelano (Cu-Au) Mines • Multiple + 0.1% Cu intersections in previous exploration Mount Morgan (Under explored region) • adjacent to Mt Morgan Mine 8M oz Au, 0.4Mt Cu • High order targets from soils and previous drill data Malmsbury •

  25. Slide 25: Pan Pacific and Mitsui IOCG JV

    Pan Pacific and Mitsui IOCG JV  Partner’s Interest - Pan Pacific Copper 75% and Mitsui & Co 25%.  Major global companies.  ‘Copper under cover’. Big targets, require big budgets. PP  Spend $15m over 6 years to earn 51%.  Budget this year is $3.8 million.  Spend $1.03m for each 1% increment up

  26. Slide 26: Phosphate

    PHOSPHATE  GBM has acquired 100% of the phosphate rights on the ground.  Beetle Creek Formation confirmed over the project area which is key host for phosphate.  Road and rail transport corridor.  Look to see how best it can be developed or IPO in a more favourable market . gbm

  27. Slide 27: Value & Growth Through Discoveries

    VALUE & GROWTH THROUGH DISCOVERIES  Develop Milo as a mid-tier supply of REEYO with significant credits for copper , phosphate and uranium  IOCG discovery on JV IOCG ground  Unique position to have the global strength of Pan Pacific Copper and Mitsui & Co as JV partners  Multi discovery potentia

  28. Slide 28: Explanatory Notes

    EXPLANATORY NOTES *1Copper Equivalent calculation represents the total metal value for each metal, multiplied by the conversion factor, summed and expressed in equivalent copper percentage. These results are exploration results only and no allowance is made for recovery losses that may occur should

  29. Slide 29: End

    END Diamond Drilling at night Malmsbury Gold project gbm

GBM Resources — Non-Deal Roadshow (November 2012) on 6ix