Energean PLC · LSE:ENOG
Energean — Investor Presentation (June 2018)
26 slides from Energean's investor presentation, June 2018

Slide 1: Focused On The Highly Attractive Eastern Mediterranean Region
June 2018 FTSE 250 E&P Company Focused On The Highly Attractive Eastern Mediterranean Region

Slide 2: Vision: Premier Eastern Mediterranean Independent E&P Player
Vision: Premier Eastern Mediterranean Independent E&P Player 22

Slide 3: Energean At A Glance
Energean At A Glance Management Focus on the East Med Focus on Gas Delivering a 2.4 Tcf Project in Israel MONTENEGRO Mathios Blocks Rigas 26 & 30 Chairman & CEO Ioannina Prinos Aitoloakarnania Panos Benos Katakolo Chief GREECE Financial Officer Blocks 12, 21, 22, 23 & 31 Dr. Steve Production Moore C

Slide 4: Eastern Mediterranean - A Hive of Activity
Eastern Mediterranean- A Hive of Activity Increasing M&A Activity Cyprus European Gas 5.4 Future exploration wells in 2018 US$ /boe(1) Market 1.4 1.4 0.8 3 “Calypso 1 is a promising gas discovery and confirms the 1 extension of the Zohr like play 1 Jan 18 Dec 16 Nov 16 Jan 16 in the Cyprus EEZ […] t

Slide 5: De-Risked Portfolio Poised for FCF Generation
De-Risked Portfolio Poised for FCF Generation 800 Sheshinksy Tax 600 Funded from Project 400 finance/ IPO Equity, RBL facility and Prinos Annual FCF (US$m) cashflows 200 - (200) Tanin Development (400) (600) 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 555 Note: (1) 70%

Slide 6: Low Cost Stable Greek Production Base
Low Cost Stable Greek Production Base Stable Production Base Around Prinos Basin Prinos Production Profile • 40.5 mmboe of 2P reserves and 23.8 mmboe of 2C resources 15 2P 1P • 100% WI for all fields • Significant operation leverage with 2018 Opex of $17/bbl, heading towards 12 $9/bbl by 2021 in 2P

Slide 7: Epsilon & Katakolo Development Projects, Greece, 100% WI
Epsilon & Katakolo Development Projects, Greece, 100% WI Epsilon Overview Katakolo Overview • 2P reserves of 18.4 mmbbls • 2P reserves of 10.5 mmbbls • Discovered in 2001 • West Katakolo reservoir is believed to be a dual porosity system (matrix, fractures and vugs), with an overlaying gas cap and a

Slide 8: Karish & Tanin – A Transformational Project in Israel (70% WI)
Karish & Tanin – A Transformational Project in Israel (70% WI) Key Highlights • Approximately 2.4 Tcf (67 bcm) gas World • 32.8 mmbbls hydrocarbon liquids(1) Class • 8 bcm/y new build FPSO Assets • Part of the prolific Early Miocene Tamar Sands play with water depths exceeding 1,700 metres Substanti

Slide 9: Karish & Tanin – Development Plan
Karish & Tanin – Development Plan Key Contract Terms TechnipFMC $1.36 bn EPCIC Contract o Two train new-build FPSO with an 8 bcm/yr capacity o Lump-sum turnkey EPCIC contract – timing and performance risks borne by Technip FMC o Project to be completed in Q1 2021 o Spread moored FPSO built by SCM

Slide 10: Karish & Tanin – 4.2 BCM/Y GSPAs Executed
Karish & Tanin – 4.2 BCM/Y GSPAs Executed Volume 1.2 bcm/yr 2.6 bcm/yr 0.3 bcm/yr 0.1 bcm/yr Tenor Min: 7 years -- Weighted Average: 16 years -- Max: 20 years Weighted Avg Take-or-Pay 75% Weighted Avg Current Price $4.1 / mmbtu Weighted Avg Floor Price > $4 / mmbtu 10 10

Slide 11: Key Milestones to Karish and Tanin First Gas
Key Milestones to Karish and Tanin First Gas March 2018 Q1 2019 Q3/Q4 2019 Q2 2020 Q1 2021 • FID • Pipeline beach • Sales-gas • Installation of • First gas crossing at Dor pipeline production production installation manifold and Dor to Karish other sub-surf structures 2018 2019 2020 2021 Q4 2018 Q1

Slide 12: Karish and Tanin Operational Overview – CPR Case
Karish and Tanin Operational Overview – CPR Case Karish Tanin Contracted Gas Volumes(1) Net Free Cash Flow Profile(2) 600 3.000 2.500 9 400 8 2.000 7 200 1.500 6 BCM/Y (US$mn) 5 1.000 (US$mn) 4 - 500 3 2 (200) - 1 (500) 0 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 (400) Contracted G

Slide 13: Israeli Gas Demand Expected to Grow
Israeli Gas Demand Expected to Grow Gas Demand Increase 2006-2016 CAGR – Top 10 Countries Globally Key Highlights • Over the last decade Israel natural gas demand 16.1% 15.5% has been amongst the fastest growing globally 13.5% 2006-2016 CAGR • Y-o-y growth of 7.4% in 2017 8.1% • Future demand is for

Slide 14: Near Term Exploration Upside
Near Term Exploration Upside Israel Bid Round: December 2017 Overview of Exploration Block Locations • Low commitments expected to be ~$6.5mn over the next three years Karish & Tanin Unrisked Prospective Resources(1) & Exploration Blocks Recoverable Prospective Resources(2) Liquids Gas Pg(3) (mmbbl)

Slide 15: Karish North: Overview
Karish North: Overview • 3-way dip structure on the northern down-thrown side of the Karish Main Strong DHI conforming to structure bounding-fault Karish North • High Probability of Success of finding gas in B, C and D sands (e.g. 81% POS: C sands –NSAI CPR) • Calculated GIIP = 1.84 Tcf, based on pr

Slide 16: Karish & Tanin FPSO – A Hub to Commercialise Other Fields
Karish & Tanin FPSO – A Hub to Commercialise Other Fields Overview of Karish & Tanin FPSO Potential Tie-Ins A nearby discovery will allow incremental gas sales or delay the Tanin Development Source: Company 16 16

Slide 17: Exploration Upside in Western Greece and Montenegro
Exploration Upside in Western Greece and Montenegro Western Greece JV with Repsol Montenegro Key Highlights • Repsol 60% partner and operator • Blocks 4218-30 and 4219-26 officially awarded in March 2017 (Energean 100%) • First exploration phase run through 2019 for Ioannina and 2021 for Aitoloakarn

Slide 18: Future Catalysts: Active Work Programme
Future Catalysts: Active Work Programme Production • Complete 25 well development programme at Prinos Target 2021 production • Epsilon field onstream > 10 kbopd • Drill 3 wells in Karish • 4.2 bcm/y forward sold under firm contracts Development • Potential to sign additional GSPAs Deliver stable, •

Slide 19: Appendix
Appendix 19 19

Slide 20: 12 Month Outlook
12 Month Outlook (1) Five development wells, Prinos Basin (2) Karish & Tanin project delivery (3) Karish North Exploration Drilling (4) Business Development Opportunities 20 20

Slide 21: Energean Board of Directors
Energean Board of Directors Non Executive Directors Andrew Bartlett – Senior Independent Director Simon Heale – Independent Non-Executive Chairman • Started his career in Royal Dutch Shell where he worked for 21 years • Currently serves as Chairman of Gulf Marine Services, Marex • 11 years of invest

Slide 22: Energean Management Team
Energean Management Team Senior Management Dr. Stephen Moore – Chief Growth Officer • 28 years of E&P experience at Shell, Maersk Oil and Vincent Reboul-Salze – Development Manager Mubadala • 14 years of industry experience • Previously Senior Vice President – Technical at • Previously Lead Process

Slide 23: Country Managers
Country Managers Dimitris Gontikas– Greece Licenced Attorney, with 25 years of senior management experience in the private and public sectors Shaul Zemach– Israel Energy and Infrastructure expert with 20 years of experience Ex Chairman of inter-ministerial committee to examine Israel’s policy on the

Slide 24: Historical Financial Results Highlights
Historical Financial Results Highlights Financial Highlights $ mn, unless otherwise stated 2015 2016 2017 Realised Sales Price ($/bbl) 44 34 46.7 Production (boepd) (1) 1,459 3,490 2,803 Revenues 28.4 39.7 57.8 Adjusted EBITDAX(2) (1.2) 16.2 20.7 Cost of Production (21.7) (24.3) (25.3) Cash Flow fro

Slide 25: Excellent HSE Record in sensitive areas
Excellent HSE Record in sensitive areas +30% increase in arrivals at “Megas Alexandros” Energean’s airport and 1,5 million visitors in Thasos in 2017 HSE Mission Over 10 red-flag beaches every year in the Gulf of Kavala To transfer our 37 years’ experience of working safely in NE Greece’s environmen

Slide 26: Thank you!
Thank you! www.energean.com 26 26
Source: company website
More decks from Energean PLC
H1 2026 Earnings Presentation29 slides · Sep 9, 2026
Investor Presentation (May 2025)39 slides · May 2025
FY2024 Earnings Presentation29 slides · Mar 20, 2025
Corporate Update (January 2025)19 slides · Jan 23, 2025
H1 2024 Earnings Presentation22 slides · Sep 11, 2024
Investor Presentation (May 2024)24 slides · May 2024