Slide 1: APA Group Investor Day: Lifecycle of pipelines
MORE THAN THE SUM OF OUR PARTS APA Group Investor Day Lifecycle of pipelines ‐Technical presentations 14 November 2013 Sydney Disclaimer This presentation has been prepared by Australian Pipeline Limited (ACN 091 344 704) the responsible entity of the Australian Pipeline Trust (ARSN 091 678 778) and
Slide 2: Agenda
Lifecycle of pipelines Kevin Lester – Infrastructure Development Mark Fothergill – Infrastructure Development Edwin De Prinse ‐ Transmission Operations APA Group Investor Day 2013 3 Agenda Pipeline construction – Kevin Lester – Group Executive Infrastructure Development Pipeline expansion – Ma
Slide 3: Pipeline construction
Pipeline construction Construction planning Activities during construction Special crossings Restoration Pipeline easements Pipeline integrity APA Group Investor Day 2013 5 Construction planning APA Group Investor Day 2013 6
Slide 4: Activities during construction
Activities during construction APA Group Investor Day 2013 7 Activities during construction Pipe unloading Clearing Pipe stringing Pipe bending Welding Non‐destructive testing APA Group Investor Day 2013 8
Slide 5: Activities during construction; Special crossings
Activities during construction Gritblasting Joint coating Trenching Padding Lower in Backfill & Restoration Hydrotesting APA Group Investor Day 2013 9 Special crossings APA Group Investor Day 2013 10
Slide 6: Restoration; Pipeline easements
Restoration Existing Easement Construction of looped pipeline APA Group Investor Day 2013 11 Pipeline easements Pipelines require a Pipeline Licence from relevant State regulator – Licenses only issued when key approvals and all landowner agreements in place – Ability to compulsorily acquire eas
Slide 7: Pipeline integrity
Pipeline easements APA Group Investor Day 2013 13 Pipeline integrity Design, construction and operations to relevant standards 50 ‐ 80 year design life Factory applied coatings Joint coating to complement factory coating Coating drainage tests Weight coating and concrete slabbing Cor
Slide 8: Pipeline expansion
Pipeline expansion Mark Fothergill General Manager Infrastructure Strategy & Engineering APA Group Investor Day 2013 15 Pipeline expansion Capacity and project registers How to get more through your assets Expansion options – Add compression – Increase maximum operating pressure – Looping a pi
Slide 9: Capacity and project registers; Expansion - add compression
Capacity and project registers Identify customer requirements including level of service flexibility Maximum Capacity determination Pressure – Pipeline modelling platforms – Validation and tuning of simulations Project cost and schedule register – Extensive knowledge of cost and scope for pipe
Slide 10: Expansion - increase pressure and looping a pipeline
Expansion ‐ increase operating pressure If the pipeline and associated facilities are Increase maximum operating pressure appropriately pressure rated, the 11000 operating pressure of the pipeline can be Increased Maximum 10000 increased Pressure 9000 PRESSURE (KPA) 8000 Example of increased press
Slide 11: In-pipe storage; Creating a bi-directional pipe
In‐pipe storage‐ swapping throughput to storage In‐pipe storage is achieved by allocation Maximum of some throughput services to a storage Maximum Pressure service Pressure Customer typically has complete flexibility over their withdrawals and in‐pipe storage level Example peaking power station:
Slide 12: Benefits of the east coast grid
Benefits of the east coast grid Roma Brisbane pipeline converted from flow control to pressure control. – Pressure control maintains a constant high pressure at Wallumbilla which results in an increase in the firm throughput capacity of the RBP Storage services can be relocated from congested pi
Slide 13: Efficient design - VIC/NSW pipeline; Gas transmission Operations
Efficient design – VIC / NSW pipeline MAOP upgrade Euroa compressor station APA Group Investor Day 2013 25 Gas transmission Operations Edwin De Prinse General Manager Transmission Operations APA Group Investor Day 2013 26
Slide 14: Gas transmission operations: Understanding the scale
Gas transmission operations Scale of our operations What it takes to manage and operate a pipeline Operating the east coast grid APA Group Investor Day 2013 27 Understanding the scale 0.415GJ or 0.000415TJ APA Group Investor Day 2013 28
Slide 15: Understanding the scale
Understanding the scale (Dandenong LNG = 750 tankers) 0.8TJ X 2,000 1 LNG tanker = 16 tonnes APA Group Investor Day 2013 29 Understanding the scale In VIC on a cold day, up to 1,200TJ/day is transported through our pipelines As much as 1,600 LNG tankers or 3 million BBQ bottles per day APA Gro
Slide 16: Understanding the scale; Compressors
Understanding the scale In QLD on the RBP we can deliver over 220 TJ/day over 275 LNG tankers driving into Brisbane APA Group Investor Day 2013 31 Compressors Increase the throughput and capacity of pipelines 300 kW compressors at Iona 9,860 KW units being installed at Moomba and Wallumbilla
Slide 17: Compressors; What it takes to operate a pipeline
Compressors Each Moomba compressor unit has the horsepower of 50 Falcons or Commodores per unit 3 new compressors at Moomba, has the combines horsepower of 150 Falcons or Commodores APA Group Investor Day 2013 33 What it takes to operate a pipeline Capital intensive business For every $100
Slide 18: SIB capex; Maintenance
SIB capex Pipeline SIB budget is for – Aged or worn out components – Parts where spares are no longer available – Upgrade older control systems – Corrosion protection equipment – Plant and motor vehicles – Pigging and pipeline inspection Typically older pipelines require more SIB capex APA Group
Slide 19: Control Room; Pipeline maintenance
Control Room Control rooms operate and oversee the pipelines Plant and Equipment – Start and stop compressors – Manage flows – Monitor alarms – Initiate response – Manage line pack and metering issues Personnel – Issue Field Work Permits – Oversee travel in outback areas – Field maintenance in
Slide 20: In-line inspection and repair; Emergency response
In‐line inspection and repair Inspection device is put into pipeline Data is retrieved RoCD2 pig being loaded into the Moomba Sydney Pipeline Field crews excavate live pipeline Effect repairs “live”, no interruption to flow APA Group Investor Day 2013 39 Emergency response Two stage respon
Slide 21: ...and doing it safely; Benefits of scale
…and doing it safely To deliver a zero harm work environment through alignment of HSE processes, mindsets and capabilities To ensure compliance with the HSE aspects of ASX Principle 7 (Recognise and Manage Risk) – Identify, assess, monitor and manage risk – Identify material changes to the compa
Slide 22: Summary; For further information contact
Summary Reliable operations In‐house expertise Benefits of scale Key focuses – Cost effectiveness – Reliability – Safety APA Group Investor Day 2013 43 For further information contact Chris Kotsaris – Head of Delivering Australia’s Energy Investor Relations and Communications, APA Group Te