Slide 1: Corporate Presentation
Corporate Presentation November 3, 2016
Slide 2: Cautionary Statements
Cautionary Statements Cautionary Note Regarding Forward Looking Statements: Statements made regarding matters which are not historical facts, such as plans for exploration, resource reports and preliminary economic assessments; anticipated revenue from the oxide plant lease; expectation and timing o
Slide 3: Business Strategy
Business Strategy • Establish Golden Minerals as a mid-tier precious metals mining company, focused in Mexico • Explore properties selected for high grades, low development costs and near-term production • Priority to properties within haulage distance of Golden’s Velardeña mills • Acquire advanced
Slide 4: Precious Metals Focus in Mexico and Argentina
Precious Metals Focus in Mexico and Argentina 3
Slide 5: Principal Projects - Mexico
Principal Projects - Mexico SANTA MARIA • Silver and gold mine RODEO • Golden has right to acquire • Near‐surface gold deposit • 7,500 tons mined and • Trucking distance to processed since 2015 with Velardeña oxide mill average grades of 338 g/t Ag • Began 2,000m core drilling and 0.7 g/t Au program
Slide 6: Santa Maria
Santa Maria • Silver and gold mine near Parral District in southern Chihuahua State • Golden has the right to acquire the property under an option agreement - $1.1 M to complete • NI 43-101 in place (April 2015, Tetra Tech) • Successfully concluded test mining and processing of 7,500 tonnes since 20
Slide 7: Santa Maria – 2016 Activities
Santa Maria – 2016 Activities • Assays from recent 2,200 meter, 24-hole drill program are complete • Currently evaluating results and plan to update resource estimate and complete PEA (Q4 2016) • Requirements to bring property to production: • minor infrastructure changes • power line Santa Maria Gr
Slide 8: Drilling - Santa Maria
Drilling - Santa Maria Exploration 2014 to 2016 Ramp entrance Total 5066 mts in 37 holes 2184 m in 24 underground holes 2882 m in 13 surface holes 7
Slide 9: Long Section - Santa Maria
Long Section - Santa Maria Santa Maria Long Section West East ? ? Grade of vein intercept in drill hole, Ag g/t ? Open Open 8
Slide 10: Rodeo
Rodeo • 1,900 ha gold project located 80 km west of Velardeña; acquired in 2015 • Previous exploration by other companies has identified a gold-bearing system exposed at surface • Golden began a 2,000-meter core drilling program in June 2016 • (Partial) results received show encouraging Quartz vein
Slide 11: Progress Report - Rodeo
Progress Report - Rodeo • Currently 1,900 meters completed in 14 holes • Results from first 12 holes received • 50 meter average thickness of bulk mineralization grades 0.7 gpt Au, 16 gpt Ag • Higher grade zone up to 2.5 gpt Au over 12 meters average • Initial drilling verifies potentially open pit
Slide 12: Map showing current drill holes - Rodeo
Map showing current drill holes - Rodeo 2016 Drilling to date , 1200 mts in 10 holes 11
Slide 13: Cross section - Rodeo
Cross section - Rodeo New hole Ore, Quartz with gold values West New hole East Planning Quartz veins and holewith gold breccias values Planned hole Cretaceus sediments (fm. Mezcalera) Cretaceous sediments (fm. Mezcalera) Tertiary volcanic rocks Tertiary volcanic rocks 12
Slide 14: Celaya Property Overview
Celaya Property Overview • 5,600 ha silver and gold property located 10 km east of Plata Latina’s Naranjillo silver and gold discovery and 45 km southeast of the historic Guanajuato District in Guanajuato State • High grade epithermal gold and silver mineralization discovered beneath clay-silica alt
Slide 15: Celaya Farm-Out
Celaya Farm-Out • Golden received $0.2 M at signing • Electrum to incur exploration expenditures of $0.5M in year one, and can elect to acquire a 60% interest in the property by incurring $2.5M of exploration costs in the first three years • Thereafter, Golden has the right to maintain its 40% inter
Slide 16: Velardeña Overview
Velardeña Overview • 560 ha silver and gold property with two underground mines and two processing plants • Mines on care and maintenance until current metals prices and mine plans indicate sustainable positive operating margin • NI 43-101 PEA (Feb. 2015; Tetra Tech) in place Velardeña Grade Tonnes
Slide 17: Velardeña Plant Lease
Velardeña Plant Lease • Oxide plant leased to Hecla Mining: • Lease recently extended by six months, to June 30, 2017 • Extendable at Hecla’s option for another 18 months (through December 31, 2018) in exchange for constructing a tailings impoundment expansion, which has been agreed • Hecla processi
Slide 18: Argentina
Argentina • El Quevar silver project, 55,000 ha, Salta Province • 2km strike length; resource remains open to east & west • NI 43-101 resource in place (June 2012, Pincock Allen & Holt) • 32 M oz Ag Indicated • 30 M oz Ag Inferred • Significant exploration conducted: • Over 1,200 meters underground
Slide 19: Key Facts
Key Facts Stock Symbols NYSE MKT: AUMN TSX: AUM Corporate Headquarters Golden, Colorado Stock Price (11.02.2016), 52‐Wk Hi/Lo close (US) $0.72 ($1.07 ‐ $0.15) Shares Outstanding (11.02.2016) 88.9 M Warrant Shares Outstanding 17.6 M Options & Restricted Stock Units 1.7 M KELTIP* Units 0.6 M Shares Ou
Slide 20: Contact Information
Contact Information Investor Relations Karen Winkler, Director of Investor Relations Phone: 303.839.5060 Email: [email protected] Corporate Headquarters 350 Indiana Street, Suite 800 Golden, Colorado 80401 Tele. 303.839.5060 Corporate website www.goldenminerals.com Transfer Agent