    HORIZON OIL LIMITED / ABN 51 009 799 455 Investor Presentation 13 November 2017

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer Statements contained in this material, particularly those regarding the possible or assumed future performance, costs, dividends, returns, production levels or rates, prices, reserves, potential growth of Horizon Oil Limited, industry growth or other trend projections and any estimated co

  3. Slide 3: Horizon Oil (ASX:HZN) snapshot

    Slide 3: Horizon Oil (ASX:HZN) snapshot

    Horizon Oil (ASX:HZN) snapshot • Sydney‐based public company listed on Australian Securities Exchange (ASX) • Portfolio of exploration, development and producing assets in Asia‐Pacific region, with net production of ~4,100 bopd, with free cash flow breakeven after all‐in costs of less than US$33/bar

  4. Slide 4: Corporate summary

    Slide 4: Corporate summary

    Corporate summary Share Price vs Brent Crude vs ASX 200 Energy Index ‐ Rebased Shareholders Board of Directors John Humphrey Chairman Brent Emmett Chief Executive Officer / Managing Director Gerrit de Nys Director Andrew Stock Director Sandra Birkensleigh Director Greg Bittar Director Senior Managem

  5. Slide 5: Horizon Oil as an investment proposition

    Slide 5: Horizon Oil as an investment proposition

    Horizon Oil as an investment proposition Strong, long‐lived production profile and cash flow • Best‐of‐peer‐group net operating cash flow from China and New Zealand, to average US$60 – 70 million pa over the period FY 2018 – 2022, with modest future capital spend (includes contribution from addition

  6. Slide 6: Five year performance – solid track record

    Slide 6: Five year performance – solid track record

    Five year performance – solid track record 1 Includes impact of Maari acquisition. See HZN’s announcement dated 6 Nov 2017 2 Reserves and Resource statement at 30 June 2017, adjusted for subsequent transactions in PNG and PMP 38160 (New Zealand) pending customary government approvals. See HZN’s anno

  7. Slide 7: Calendar year 2017 free cash flow breakeven of US$33/barrel

    Slide 7: Calendar year 2017 free cash flow breakeven of US$33/barrel

    Calendar year 2017 free cash flow (FCF) breakeven of US$33/barrel provides capacity for debt repayment • Low breakeven price provides stability in low oil price environment and capacity for debt repayment • Low opex in China and tight control over capital spend underwrites the low breakeven price •

  8. Slide 8: Debt reduction trajectory continuing

    Slide 8: Debt reduction trajectory continuing

    Debt reduction trajectory continuing • Horizon Oil’s proven, developed and producing Beibu Gulf and Maari fields provide substantial debt security in a challenging environment for small and mid‐ cap companies to access debt • The Company refinanced the outstanding US$58.8 million convertible bonds w

  9. Slide 9: Beibu Gulf producing fields and future development targets

    Slide 9: Beibu Gulf producing fields and future development targets

    Beibu Gulf producing fields and future development targets • WZ 6‐12N and WZ 12‐8W fields continue producing above forecast, currently ~9,300 bopd • Remaining cost recovery oil entitlement of US$86.6m to be received over 2017 – 20, unrecovered balance escalates at 9% pa • Fixed operating tariff redu

  10. Slide 10: Beibu Gulf future development projects – WZ 12-8E and associated fields

    Slide 10: Beibu Gulf future development projects – WZ 12-8E and associated fields

    Beibu Gulf future development projects – WZ 12‐8E and associated fields Leased mobile production platform (MOPU) • Development plan (ODP) for integrated development of WZ 12‐8E and associated fields (audited gross 2C resources 11.1 mmbo) to be submitted for Government approval in 2018; 3 stage devel

  11. Slide 11: Beibu Gulf fields – phased development approach

    Slide 11: Beibu Gulf fields – phased development approach

    Beibu Gulf fields – phased development approach Phased approach to development of new reserves – use of existing infrastructure:‐ – reduces costs and engineering risk – accelerates timeline – enhances economics of fields already on stream Investor Presentation November 17 11

  12. Slide 12: Beibu Gulf production and cost recovery driving cash generation through 2022

    Slide 12: Beibu Gulf production and cost recovery driving cash generation through 2022

    Beibu Gulf production and cost recovery driving cash generation through 2022 Actual Forecast 4,500 4,000 Cost recovery production entitlement 3,500 3,000 2,500 bopd 2,000 WZ 12‐8E field 1,500 Existing fields 1,000 500 0 Jun‐15 Jun‐16 Jun‐17 Jun‐18 Jun‐19 Jun‐20 Jun‐21 Jun‐22 Working int production (

  13. Slide 13: Maari/Manaia fields – New Zealand

    Slide 13: Maari/Manaia fields – New Zealand

    Maari /Manaia fields – New Zealand • Field production currently ~8,800 bopd • Regular workover program to replace ESPs, clean scale and add perforations has successfully enhanced production • Water injection (WI) repairs and temporary repair to platform strut completed in January 2017; permanent rep

  14. Slide 14: Manaia – Maari schematic cross-section

    Slide 14: Manaia – Maari schematic cross-section

    Manaia – Maari schematic cross‐section • Multiple oil accumulations on production serve to diversify risk • Potential to develop Moki zone at Manaia in future – gross 2C resource 50.0 mmbo Investor Presentation November 17 14

  15. Slide 15: Acquisition of additional 16% interest in Maari/Manaia fields – metrics

    Slide 15: Acquisition of additional 16% interest in Maari/Manaia fields – metrics

    Acquisition of additional 16% interest in Maari/Manaia fields – metrics • Acquisition of additional 16% interest in PMP 38160 from Todd, increasing HZN interest in the producing Maari and Manaia fields to 26%*. • Purchase price US$17.6m; effective date of 31 December 2017; acquisition subject to cus

  16. Slide 16: Papua New Guinea – the regional picture

    Slide 16: Papua New Guinea – the regional picture

    Papua New Guinea – the regional picture • PNG is a pro development jurisdiction with stable petroleum fiscal regime • Rich mineral and petroleum province with a history of successful large scale resource projects delivery eg. PNG LNG • Jurisdiction well supported by the international banks • Challen

  17. Slide 17: Horizon Oil acreage and JV partners – resource development overview

    Slide 17: Horizon Oil acreage and JV partners – resource development overview

    Horizon Oil acreage and JV partners – resource development overview • Significant gas resource discovered and appraised in uncomplicated structures, with highly productive sandstone reservoirs • High level of condensate and LPG contained in the gas • Relatively easy surface access and terrain for fi

  18. Slide 18: Appraised western foreland fields – concentrated resource distribution and ownership

    Slide 18: Appraised western foreland fields – concentrated resource distribution and ownership

    Appraised western foreland fields – concentrated resource distribution and ownership * * • Contingent resource (2C) : 2.0 – 2.5 tcf gas 60 – 70 mmbbl condensate • Horizon Oil and Repsol have a combined interest of 70% of the total resource and operate all the fields , which will facilitate aggregati

  19. Slide 19: Western LNG development scheme

    Slide 19: Western LNG development scheme

    Western LNG development scheme WLNG development ‐ 1.5 mtpa sales capacity Aggregated raw gas production profile ‐ 2C resources 300 250 Wellhead rate (mmscfd) 200 150 100 1C resources profile 50 ‐ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Production year PRL 21

  20. Slide 20: Development scheme selection criteria

    Slide 20: Development scheme selection criteria

    Development scheme selection criteria • Standalone development – 1.5 mtpa right‐sized for appraised resource base • Simple concept with lowest technical and execution risk • Maximum use of standard, proven technology • System uptime consistent with global LNG projects (90‐ 95%) • Utilisation of lead

  21. Slide 21: LNG demand forecast in target areas

    Slide 21: LNG demand forecast in target areas

    LNG demand forecast in target areas Source: WoodMac, LNG Tool, Q2 2017 dataset Note: Stylised projections based on underlying annual forecasts Investor Presentation November 17 21

  22. Slide 22: WLNG well-placed to supply emerging demand areas

    Slide 22: WLNG well-placed to supply emerging demand areas

    WLNG well‐placed to supply emerging demand areas – Indonesia, South China Sea Rim, China, India • Strong increase in demand forecast in emerging Asian economies, pointing to supply shortfalls from 2023 • Many new entrants seeking to import LNG to: ̶ Offset decline in domestic gas supply ̶ Displace l

  23. Slide 23: Western LNG project, PNG – key points

    Slide 23: Western LNG project, PNG – key points

    Western LNG project, PNG – key points • Preliminary project economics are attractive, with 20+ year plateau production for 2C gas resource and economics strengthened by significant condensate production. • 520 km gas and condensate pipelines will connect western foreland fields, containing appraised

  24. Slide 24: Outlook for 2018

    Slide 24: Outlook for 2018

    Outlook for 2018 Financial • Operating cash flows to significantly increase from Jan‐18 with increased interest in Maari/Manaia, continuing steady production at Beibu Gulf fields, including cost recovery production entitlement and ongoing control of opex and capex • Continued focus on debt reduction

  25. Slide 25: For more information please contact

    Slide 25: For more information please contact

    For more information please contact: Horizon Oil Limited T: +61 2 9332 5000 Level 6, 134 William St Brent Emmett Chief Executive Officer F: +61 2 9332 5050 Woolloomooloo NSW 2011 E: [email protected] horizonoil.com.au Media enquiries Gavan Collery M: +61 419 372 210 ResourceComms Pty Ltd E: gav

Source: Internet Archive copy of horizonoil.com.au

More decks from Horizon Oil Limited

All 128 Horizon Oil decks