Slide 1: McPhillamys Gold Project Community Consultative Committee
1 1 REGIS RESOURCES LTD McPhillamys Gold Project Community Consultative Committee July 2019
Slide 2: Agenda
2 Agenda 2 1. Apologies 2. Declaration of pecuniary or other interests 3. Business arising from previous minutes 4. Correspondence 5. McPhillamys update • Project area • Water pipeline 6. Other agenda items 7. General Business 8. Next Meeting
Slide 3: Community Consultation
3 Community Consultation 3 ➢Community Consultation ➢ Face to face meetings ongoing ➢ Stall at the Farmers’ Market and Newbridge Festival ➢ Community Information Sheet #6 distributed ➢ Community open days 14th and 15th May ➢ Community meeting 23rd May ➢ Fortnightly updates & information in the Blayne
Slide 4: Agenda
Correct 44 Agenda Incorrect 1. Apologies
Slide 5: Water Monitoring
5 Water Monitoring 5 ➢ Belubula landowners – bores and surface water ➢ McPhillamys site and neighbours – bores and surface water
Slide 6: Supporting Local Tourism
6 Supporting Local Tourism 6 ➢ Mining and tourism accommodation workshops ➢ Blayney/Cabonne/Orange Councils and Orange 360 ➢ Major Sponsor - Millthorpe Fire Festival Night Market
Slide 7: Native Tree Planting
7 Native Tree Planting 7 ➢ 5,400 locally-sourced native trees ➢ Supporting Skillset - local youth training provider
Slide 8: Regulatory Approvals
8 Regulatory Approvals 8 ➢ Submission of PEA to DPIE for issuing of EARs (Complete) ➢ Submission of EIS to DPIE (Complete) ➢ Review of EIS by DPIE ➢ Exhibition of EIS for minimum of 42 days ➢ DPIE Public Meeting ➢ Submissions received ➢ IPC first hearing? ➢ Regis responds to submissions ➢ IPC second
Slide 9: McPhillamys Gold Project Public Notice
McPhillamys Gold Project REGIS RESOURCES LTD PUBLIC NOTICE Notice of a Development Application for consent to carry out State significant development under Part 4 of the Environmental Planning and Assessment Act 1979 (NSW) A Development Application has been made to the Minister for Planning and Publ
Slide 10: Water
10 Water 10 ➢ Design of the water management system avoids discharge of process affected water to surface water systems – Nil Discharge site ➢ Numerical modelling and analysis applied to develop site water balance, predict water quantity and quality changes to surface water and groundwater resources
Slide 11: Water
11 Water 11 ➢ Surface Water ➢ A temporary reduction in the inflow to Carcoar Dam (around 4%) will occur during project operations. ➢ Permanently, following mine-closure and rehabilitation, the reduction in flows will be much smaller (around 0.5% reduction) which is within the current natural variabi
Slide 12: Water
12 Water 12 ➢ Pipe Line Water Quality ➢ Ranges 600mg/L TDS to 7,000mg/L TDS ➢ Predicted average of around 3,500 mg/L TDS ➢ Quality characteristics for each water source will vary over time as a result of climatic conditions and operational circumstances ➢ the quality is not expected to ever exceed t
Slide 13: Noise
13 Noise 13 ➢ Mine design has been developed through an iterative process, addressing preliminary noise modelling. ➢ Key design changes incorporated into the project including amenity bunds and revised waste rock scheduling. ➢ The initial development of the mine includes the construction of two amen
Slide 14: Noise
14 Noise 14 ➢ Operational noise assessment identified 16 residences that will be entitled to voluntary mitigation upon request in Kings Plains due to predicted noise exceedances (greater than 2dB but less than 5dB) during the day time prior to completion of the amenity bunds. ➢ These exceedances wil
Slide 15: Air Quality
15 Air Quality 15 ➢ Air dispersion modelling predict that project emissions for particulate matter (TSP, PM10, PM2.5, dust deposition, metals and metalloids) and gaseous pollutants (NO2 and HCN) are below criteria at all sensitive receivers. ➢ Cumulative concentrations (ie background and project emi