Kantra Copper Limited · ASX:KAN
Kantra Copper — Copper to the World Conference 2026
18 slides from Kantra Copper's conference presentation, Sep 2, 2026
Slide 1: Presentation – Copper to the World Conference
2 September 2026 PRESENTATION – COPPER TO THE WORLD CONFERENCE Kantra Copper Limited (formerly Hillgrove Resources Limited, Kantra or Company) (ASX:KAN) is pleased to enclose a copy of the presentation to be delivered by Kantra’s CEO & Managing Director, Bob Fulker, at the Copper to the World Confer
Slide 2: A Growing Australian Copper Producer
A Growing Australian Copper Producer Copper to the World September 2026 Bob Fulker Chief Executive Officer & Managing Director (Formerly Hillgrove Resources Limited)
Slide 3: Important Notice and Disclaimer
Important Notice and Disclaimer Disclaimer To the maximum extent permitted by law, neither Kantra nor its related corporations, directors, officers, employees or agents, nor any other person, accepts any liability, including, without limitation, any liability arising from fault or negligence, for an
Slide 4: Growing Copper Producer
Growing Copper Producer With strong development & exploration pipelines ASX:KAN BOARD & MANAGEMENT Share price1 $1.10 Derek Carter Chair Shares on issue1 235.9 M Bob Fulker CEO & Managing Director Market capitalisation $260 M Murray Boyte Non-Exec. Director Debt Nil Roger Higgins Non-Exec. Director
Slide 5: Copper Market Outlook
Copper Market Outlook Copper demand is projected to rise ~50% by 2040, driven The number of new copper discoveries has fallen primarily by energy transition sharply since the 2000s, while average grades have declined Increasing Cash costs reflect grade decline, deeper mining and Higher incentive pri
Slide 6: Delivering and Growing the Business
Delivering and Growing the Business Building blocks to value creation Mine Life & Throughput Upsides Growth Opportunities Cu Production - tonnes Guidance1: 12,750 – 14,000 ▪ Kanmantoo mine life extension ▪ Utilise latent plant capacity ▪ Focusing on 2+Mtpa pathway ▪ Inorganic growth opportunities H2
Slide 7: Kanmantoo Copper Mine (100%)
Kanmantoo Copper Mine (100%) Latent capacity enables material production and cost reduction upside Resources1 Fully Permitted Operation 22 Mt 160 kt Cu 120 koz Au 1.8 Mtpa 2 Active 700m/mth 3rd Mining Front2 Resources Contained Contained UG Run Rate Mining Fronts Development Under Development Reserv
Slide 8: To be updated Monday North Kavanagh
To be updated Monday North Kavanagh Nugent Spitfire Open at depth Kavanagh Open at depth Open at depth 2026 Planned Stopes 2026 Planned Development Existing Development to Aug 2026 Existing Void to Aug 2026 7 Existing Backfill to Aug 2026 Open at depth
Slide 9: Emily Star Development Approved
Emily Star Development Approved Third mining front under development to provide optionality1 ▪ Geological continuity confirmed ▪ No material geotechnical risks identified ▪ $20 - $22 million capital requirement to completion, in addition to the $2.9 million spent to end of June ▪ $6.5 – 7.5 million
Slide 10: 13 Targets within 1 km from the Kanmantoo Processing Facility
Near-Mine Prospects 13 Targets within 1 km from the Kanmantoo Processing Facility 1 ▪ Spitfire resource extension drilling returned high-grade intersects2, results will be incorporated into the 2026 MROR update scheduled for October ▪ Emily Star mine design includes drill platforms enabling future u
Slide 11: Mutooroo Copper Project
Mutooroo Copper Project High-grade copper growth option unlocked by Kantra’s infrastructure advantage ▪ PFS Phase 1 – Focused on material risk items, namely rail logistics and metallurgical test work – expected to conclude in the December Quarter1 ▪ Rail logistics: o Potentially 0.7 – 1 Mtpa ore tra
Slide 12: Regional Exploration
Regional Exploration Building a multi-asset copper growth pipeline ▪ Strategic tenement holding at high-potential structural corridors ▪ Clear pipeline logic: Regional targets designed to complement Kanmantoo and extend long-term copper optionality ▪ Data-driven targeting: Integrating geophysics, st
Slide 13: Upcoming Milestones
Upcoming Milestones Building on consistent delivery to unlock future value Kanmantoo Operation H1 2026 H2 2026 Ramp up to 1.7-1.8Mtpa Run Rate Emily Star Stage 1 Drill Platform Drilling to Inform Stage 2 Decision Stage 2 Investment Decision Resources & Reserves Resources & Reserves Update Mu
Slide 14: Copper Foundation, Multi-Asset Future
Copper Foundation, Multi-Asset Future Building the next mid-tier copper company Cu Strategy in Tier 1 Jurisdiction Robust Resources & Reserves Cash Generating Operation Latent Installed Capacity for Growth Mutooroo Copper Growth Option Near Mine Exploration Upside Potential 13
Slide 15: Thank you
Contact Kantra Copper Limited 5-7 King William Road Unley SA 5041 [email protected] www.kantra.com Thank you Bob Fulker CEO & Managing Director +61 (0)8 7070 1698 To receive up-to-date Luke Anderson CFO & Joint Company Secretary company information, +61 (0)8 7070 1698 scan the QR code to join our Inve
Slide 16: Appendix - Kanmantoo Mineral Reserve
Appendix - Kanmantoo Mineral Reserve Tonnes Cu Au CuEq Ag Cu Metal Au Metal Mine Area Classification (kt) (%) (ppm) (%) (ppm) (kt) (koz) Proved 1,500 0.96 0.11 1.0 2.8 14 5 Kavanagh Probable 900 0.89 0.19 1.0 2.9 8 5 Sub-Total 2,300 0.93 0.14 1.0 2.8 22 10 Proved 360 0.73 0.37 1.0 1.9 3 4 Nugent Pro
Slide 17: Appendix - Kanmantoo Mineral Resource
Appendix - Kanmantoo Mineral Resource Tonnage Cu Au Ag Cu Metal Au Metal JORC Mine Area Notes: Classification (kt) (%) (g/t) (g/t) (kt) (koz) 1. Due to effects of rounding, total numbers may not sum. 2. Inferred 1 – includes Kavanagh high grade Inferred; Central Measured 4,200 0.80 0.11 2.7 33 15 Ka
Slide 18: Appendix - Mutooroo Mineral Resource
Appendix - Mutooroo Mineral Resource Resource Copper Cobalt Gold Copper Cobalt Gold Classification Tonnes Category % % g/t tonnes tonnes ounces Measured Oxide 598,000 0.56 0.04 0.08 Subtotal Oxide 598,000 0.56 0.04 0.08 3,300 200 1,500 Measured Sulphide 4,149,000 1.23 0.14 0.18 Indicated Sulphide 1,