Xcel Energy Inc. · NASDAQ:XEL
Xcel Energy — Corporate Update (May 2011)
40 slides from Xcel Energy's corporate update, May 19, 2011
Slide 1: Colorado DSM Roundtable Discussion
Xcel Energy Colorado DSM Roundtable Discussion May 19, 2011 1:00pm to 4:30pm 1800 Larimer, Room 03G01
Slide 2: Welcome and Introductions
Welcome and Introductions Contact ContactInfo: Info: Suzanne SuzanneDoyle Doyle Manager, Manager,DSM DSMRegulatory RegulatoryStrategy Strategy&&Planning Planning Office OfficePhone: Phone: 612-330-5518 612-330-5518 Cell CellPhone: Phone: 612-599-5785 612-599-5785 E-mail: E-mail: suzanne.galster@xcel
Slide 3: Agenda
Agenda 1:00 – 1:05 Welcome, Introductions (Doyle) 1:05 – 1:45 Regulatory Updates (Doyle) 1:45 – 2:30 DSM Industry Trends/Program Best Practices (Rachel Reiss Buckley & Tim Stout – E-Source) 2:30 – 2:45 Break 2:45 – 3:15 DSM Program Highlights (White & Spickard) 3:15 – 3:45 Product Development Update
Slide 4: Regulatory Update
Regulatory Update Presented by: Suzanne Doyle Compliance Complianceinformation informationisisavailable available at atXcel XcelEnergy’s Energy’sDSM DSMWebsite: Website: http://www.xcelenergy.com/About_Us/Rates_&_Regulations/Regulatory_Filings/CO_DSM http://www.xcelenergy.com/About_Us/Rates_&_Regula
Slide 5: 2011 60-Day Notices
2011 60-Day Notices February 4, 2011 March 31, 2011 ENERGY STAR Insulation Rebates Retailer Incentive Pilot April 22, 2011 February 8, 2011 Compressed Air Energy Management Systems May 3, 2011 March 30, 2011 Cooling Efficiency ENERGY STAR New Homes 5
Slide 6: Timeline of Recent Filings
Timeline of Recent Filings April April26, 26,2011 2011 May May16, 16,2011 2011 DSM DSMStrategic StrategicIssues IssuesDecision Decision DSM DSMStrategic StrategicIssues IssuesARRR ARRRFiling Filing Docket DocketNo. No.10A-554EG 10A-554EG Docket DocketNo. No.10A-554EG 10A-554EG Decision DecisionNo. N
Slide 7: 2010 Annual Status Report – filed 4/1/2011
2010 Annual Status Report – filed 4/1/2011 Docket No. 08A-366EG Results: Electric savings target =67 MW, 237 GWh & Budget=$63.7M Electric savings achievements =67 MW,252 GWh & Spend=$54.7M Gas savings target = 402,808 Dth & Budget = $16.5M Gas savings = 454,238 Dth & Spend = $16.9M Finan
Slide 8: Strategic Issues Filing – Decision No. C11-0442
Strategic Issues Filing – Decision No. C11-0442 in Docket No. 10A-554EG Summary of Major Decisions: Electric Energy Goals – Set at the 130% of goal level from Docket No. 07A-420E Goal in 2012 = 330 GWh Goal in 2013 = 356 GWh Total 2012-2020 = 3,984 GWh Electric Peak Demand goals: Did not
Slide 9: Strategic Issues Filing – Decision No. C11-0442
Strategic Issues Filing – Decision No. C11-0442 in Docket No. 10A-554EG Electric Incentive: Disincentive Offset: Earn $3.2M pre-tax if energy savings goals between 80% and 99% of goal. Earn $5.0M pre-tax if energy savings goals meets or exceeds 100% of goal. Performance Incentive: Percent
Slide 10: Strategic Issues Filing – Decision No. C11-0442
Strategic Issues Filing – Decision No. C11-0442 in Docket No. 10A-554EG Other Proposals: EUI: Did not endorse EUI programs but if PSCo wishes to implement must file a separate application from DSM Plan. Influenced Savings: Rejected savings credit for Influenced Savings from Custom projects, bu
Slide 11: 2012/2013 Biennial Plan Filing
2012/2013 Biennial Plan Filing Extend Filing Date to 8/1/2011 – Waiver to extend filing date from 7/1/2011 Electric Strategies Continue successful DSM measures within current traditional DSM products (e.g. CFLs) Assess More Non-Traditional DSM Concepts (Behavioral, EUI, Market Transformation
Slide 12: DSM Industry Trends Program Best Practices
DSM Industry Trends Program Best Practices Presented By: Rachel Reiss Buckley Tim Stout 12
Slide 13: Break
Break 13
Slide 14: DSM Program Highlights
DSM Program Highlights Presented By: Shawn White Kim Spickard 14
Slide 15: Portfolio Overview
Portfolio Overview Electric 38.4 GWh YTD (15% of Y/E Target) $7.4 M (10.8% of Budget) Gas 106,359 Dth (28.8% of Y/E Target) $3.3 M (20.9% of Budget) 15
Slide 16: Residential and Low-Income Program Highlights
Residential and Low-Income Program Highlights 16
Slide 17: Residential Highlights
Residential Highlights Energy Star® New Homes Performing well but EPA changes forced 60 day notice. Energy Star Retailer 60 day notice to add Energy Star® 5.1 TV’s Evaporative Cooling Tiered incentive for contractors and retailers 17
Slide 18: Residential Highlights
Residential Highlights The “Gas Bundle” – Heating, Insulation & Water Heating 700 Registered contractors 90% of rebates paid on highest efficiencies High Efficiency Air Conditioning Load calculation and quality installation training Home Lighting New creative design and more pervasive
Slide 19: Residential Highlights
Residential Highlights Home Performance w/ Energy Star® Incorporating Settlement recommendations Oversight moving from EPA to DOE Refrigerator Recycling 33% of savings target 1st Qtr School Education Kits In process Saver’s Switch 5% installed but 1st qtr is slow 19
Slide 20: Low Income
Low Income Easy Saving Energy Kits Added additional education pieces – English and Spanish Multi Family Weatherization Slow start but projects in process Non Profit Energy Efficiency 7 electric and 6 gas projects YTD Single Family Weatherization Steady performance, strong advt plan 2
Slide 21: Business Energy Efficiency Program Highlights
Business Energy Efficiency Program Highlights 21
Slide 22: Program Highlights
Program Highlights 2011 Energy Efficiency Expo “The Cost of Doing Nothing” 600+ Attendees Cooling Trade Partner Training Tools for selling high efficiency options 60+ Trade Attendees Western Slope Custom “Roadshow” 2nd Qtr – Glenwood Springs/Grand Junction “Demystifying the Custom Rebate Proce
Slide 23: Product Updates
Product Updates Custom Efficiency Significant increase in custom applications 221 in Q1 2011, 117 in Q1 2010 Lighting Efficiency Participation in Energy Star LED lighting rebates continues to increase 50% Bonus Rebates for T12 retrofits Cooling Efficiency 30% Increase in prescriptive
Slide 24: Product Updates
Product Updates Compressed Air Increased Rebates for VFD compressors 50% bonus rebates for Custom projects New prescriptive rebates for Plan A VSD Compressors (60-Day Notice – April 22, 2011) 24
Slide 25: DSM Product Development Update
DSM Product Development Update Presented by: Anne Kraft DSM DSMWebsite Websiteprovides providesprogram programidea ideasubmission submissionforms formsat: at: http://www.xcelenergy.com/About_Us/Rates_&_Regulations/Regulatory_Filings/CO_DSM_Plan http://www.xcelenergy.com/About_Us/Rates_&_Regulations/
Slide 26: Product Development Team
Product Development Team George Spargo – Manager – 612-330-6036 Anne Kraft – Commercial Segment – 612-330-7582 Pat Goggin – Industrial Segment – 303-294-2370 Nathan Huso – Residential Segment – 612-330-2812 26
Slide 27: DSM Roundtable New Product Development Procedure
DSM Roundtable New Product Development Procedure Interested persons may submit new program ideas or proposed revisions to existing programs or new program concepts to the Company in writing (link below). The Company screens and prioritizes all new program ideas for further research and developme
Slide 28: DSM Roundtable Ideation Submissions
DSM Roundtable Ideation Submissions Received request April 27, 2011 – Energy Metering and Monitoring Systems proposes Comfort Monitor, a wireless remote thermostat system in master metered multi-family buildings. We will prepare and present at next DSM Roundtable * All commercial products can util
Slide 29: Product Development Process
Product Development Process Traditional “Stage-Gate” process that includes team or management review at key decision points: Ideation Framing Design Build Test Launch 29
Slide 30: 2010 Cycle 2 Product Development
2010 Cycle 2 Product Development Ideation July 1 – August 15 2010 Framing July 15 – September 28, 2010 Design September 1, 2010 through Q1 2011 Build October 1, 2010 through Q2 2011 Test Nov 1, 2010 through 2012 Launch March 1, 2011 through 2013 30
Slide 31: New Products in Development for potential 60-day Notice or 2012/2013 Filing
New Products in Development for potential 60-day Notice or 2012/2013 Filing Residential Status Potential Filing A/C Tune-Up Pilot Completed 2012 60 Day Automated Energy Audits Pilot Ongoing 2012 60 Day LED Lighting Design Still being worked on Commercial Status Potential Filing Computer Efficiency B
Slide 32: New Products in Development for potential 60-day Notice or 2012/2013 Filing
New Products in Development for potential 60-day Notice or 2012/2013 Filing Industrial Status Potential Filing ASD/VFD Study Launched In 2011 Plan Efficient Small Motors - ECMs Build 2012/2013 filing "Plan A" FOR 10 to 49 HP VSD Compressors Launched 2011 60 Day Turn-Key Services Build 2012 60 Day VF
Slide 33: Energy Feedback Pilot
Energy Feedback Pilot Xcel IT has finished Data extraction (18 month historical file on ~900,000 combo customers) OPower is uploading files into their “Insight Engine” for selection of participant and control groups Currently on track for first reports delivered June 6 50,000 CO Gas - Electr
Slide 34: 2011 Cycle 1 Product Development
2011 Cycle 1 Product Development Ideation January 1, 2011 – February 15 Framing January 15 – February 28 Design March 1 through Q3 2012 Build April 1 through Q4 2012 Test May 1 through Q2 2013 Launch Jan 1, 2012 through 2013 34
Slide 35: 2011 Cycle 1 New Products
2011 Cycle 1 New Products Framing queue: 36 New Ideas Considered Commercial Commercial Efficiency Pilot Cooling system design assistance Commercial Food Service Equipment Continuous Commissioning for Buildings Early replacement (Plan B) of Commercial Cut-out Controls for Commercial Boilers RTUs Di
Slide 36: 2011 Cycle 1 New Products
2011 Cycle 1 New Products Framing queue: 36 New Ideas Considered Industrial Residential Anti-sweat heater controls Retrofit EC motors for existing Efficient small motors - ECMs furnaces Low loss filters Residential Multi-family Plan A Air Compressors Prescriptive rebates for Condensing Prescriptiv
Slide 37: 2011 Cycle 2 Product Development
2011 Cycle 2 Product Development Ideation July 1 – August 15 2011 Framing July 15 – September 28, 2011 Design September 1, 2011 through Q1 2012 Build October 1, 2011 through Q2 2012 Test Nov 1, 2011 through 2013 Launch March 1, 2013 through 2014 37
Slide 38: New Ideas?
New Ideas? CO Roundtable Ideas need to be submitted at least 90 days prior to a CO Roundtable Meeting in order for an analysis to be presented at that meeting. Roundtable Idea Form: http://www.xcelenergy.com/About_Us/Rates_&_Regulations/Regulatory_Filings/CO_DSM_Plan Other ideas can be submitt
Slide 39: Wrap-up / Open Discussion
Wrap-up / Open Discussion Upcoming UpcomingRoundtable RoundtableSchedule: Schedule: Q2: Q2: August August18, 18,2011 2011 Q3: Q3:November November17, 17,2011 2011 Q4: Q4:February February16, 16,2012 2012 39
Slide 40: Xcel Energy – Responsible by Nature
Qe Xcel Energy’ RESPONSIBLE BY NATURE™