Deccan Gold Mines Limited · NSE:DECNGOLD

Deccan Gold Mines — Shareholder Meeting (December 2021)

19 slides from Deccan Gold Mines's shareholder meeting presentation, Dec 22, 2021

  1. Slide 1: Annual General Meeting - 2021

    Annual General Meeting - 2021 22nd December, 2021 Dr. Hanuma Prasad Modali Managing Director

  2. Slide 2: Deccan Gold Mines Limited

    Deccan Gold Mines Limited 2021  DGML is at the cross roads  Some set backs but new opportunities as well  Acquisition of significant equity stake in GMSI  Acquisition of leases in Tanzania  Making foray into Consultancy DGML Jonnagiri Gold Tanzania Gold Consultancy Ganajur and Project Project P

  3. Slide 3: Jonnagiri Gold Project

    Jonnagiri Gold Project India’s first private gold mine 6 sq.km Mining Lease – valid 50 years Kurnool district of Andhra Pradesh - 300 km from Bangalore All the Statutory clearances obtained —Environmental Clearance —Approved Mine Plan (IBM) —Consent for Establishment (CFE) —Consent for Operation

  4. Slide 4: Jonnagiri Project Resources

    Jonnagiri Project Resources Cut-off Tonnes Au Deposit Class Ounces (g/t Au) (Kt) (g/t) Indicated 0.5 4 700 1.52 231 000 East Lode Inferred 0.5 1 200 1.60 60 000 Sub-total* 0.5 5 900 1.53 292 000 Indicated 0.5 500 1.05 18 000 West Block – Open Pit Inferred 0.5 300 1.13 9 000 Sub-total* 0.5 800 1.08 2

  5. Slide 5: Jonnagiri Gold Project Gold Production

    Jonnagiri Gold Project Gold Production Shallow pit (2017)  10 years of initial mine life on East block open pit  180 m deep pit with gold ore starting from Deep pit (2018) surface  92% recovery through gravity – CIL circuit  1500 tpd and 25,000 Oz/Pa (750 Kg) production  AISC is $589/Oz, INR 13

  6. Slide 6: Jonnagiri Gold Project

    Jonnagiri Gold Project Land acquisition Mining Lease - 1500 acres (mostly private lands) Leasing agreements with various land owners since 2007 350 acres of land required for mine, processing facility etc Land Acquisition commenced Secured rights over 120 acres of land including key land in the

  7. Slide 7: Jonnagiri Gold Project

    Jonnagiri Gold Project Mining and Production  Mining of the gold bearing ore from the top layers is going on  Pilot processing plant is set up  Gold bearing gravity concentrates are going to be produced  Full scale commercial production of 750kg per annum from 1st quarter of 2023 #1285, 5th Main

  8. Slide 8: Additional Targets within Mining Lease

    Additional Targets within Mining Lease Additional targets identified based on  Soil sampling  Litho-geochemial sampling  Structural continuity  Drill intersections  IP anomalies Target 1 – Shallow drill intersections -8m @ 2.67g/t -5m @ 4.24g/t -3m @ 7.84g/t -90m long ore body delineated

  9. Slide 9: Tanzanian Gold Project

    Tanzanian Gold Project  5 PL blocks located in Lake Victoria Gold Fields  4 PL’s are in Nzega Greenstone belt – a world class gold province  Nzega – Tabora Greenstone belt contains several gold mines, including Buzwagi (3.5Moz) and Golden Pride (2.6 Moz)  Golden Pride is about 25km east of Nzega

  10. Slide 10: Tanzanian Gold Project

    Tanzanian Gold Project  Carried out Desktop Studies  Identified mineral bearing shear zones based on geological and magnetic data  Bulingimirwa shear zone which hosts Golden pride deposit passes through Key licenses fall on those structures  Ore bearing structures from Mahene gold mine extends i

  11. Slide 11: Consultancy

    Consultancy  Significant opportunity in the consultancy sector  Indian companies acquiring projects overseas – technical expertise needed  Government of India allowing private sector to get accredited and take up Government Contracts Consultancy Accreditation with Kyrgyzstan gold Building network

  12. Slide 12: Gold Project in Kyrgyzstan

    Gold Project in Kyrgyzstan  Altyn Tor Gold Project is located in the SE part of Kyrgyzstan  It is an operating gold mine with an old processing facility  An Indian Mining company is acquiring the mine along with the processing facility  Australian Indian Resources Ltd (AIR) has been helping the

  13. Slide 13: Acquisition of Stake in GMSI

    Acquisition of Stake in GMSI  DGML plans to acquire significant stake in GMSI which has a granted and executed Mining Lease for gold  Provides much needed security for DGML shareholders particularly when the license on its flagship project - Ganajur, is in legal battle  Granted mining lease of Jo

  14. Slide 14: Acquisition of Stake in GMSI

    Acquisition of Stake in GMSI Composite Scheme RBI BSE SEBI (Filed on 29/10/21) (Filed on 20/10/21) Reviewed by both OID and FED have gone compliance team and listing 30th January 2022 through the scheme team. Further queries will be uploaded onto BSE website Advised the company to Final approval fol

  15. Slide 15: Ganajur License

    Ganajur License  Writ Petition filed before the Hon’ble High Court of Karnataka by DESPL  Filed early hearing petition and the matter came up on December 17, 2021  Legal team argued in the Court that while passing its Order dated July 16, 2021 on the Ganajur ML, the Ministry of Mines has wrongly

  16. Slide 16: Hutti Licenses

    Hutti Licenses  Second and Final Hearing in the matter took place on 11th August, 2021  Presented our case and filed our written replies  Secretary posted the matter for orders  In discussion with our legal council to explore the possibility of a writ petition  With an objective to get an inter

  17. Slide 17: Optimization of costs

    Optimization of costs Possible Revenue to meet some of our OC in Lacs costs  In the process of Optimizing the costs 40  Staff has departed and not been replaced 30 20  Reducing rental and other operating expenses 10  Further optimization is on anvil 0 2020 2021 July, 2022  Milestone based salar

  18. Slide 18: Investment

    Investment  Currently planning to raise INR 10-15 Cr for  1. Exploration in Tanzanian projects  2. Acquisition of stake Indian and overseas projects  3. Transaction costs  4. Legal fees for Ganajur and Hutti projects  5. Expenses for participating in Auctions  July, 2022 – plan for bigger fun

  19. Slide 19: Future Outlook

    Future Outlook  Acquires significant stake in near producing gold assets  On its way to become a gold producer in the next 15 to 18 months  Significant progress in consultancy business with consistent revenue stream  Acquisition of stake in overseas gold projects through consultancy and/or inves

Deccan Gold Mines — Shareholder Meeting (December 2021) on 6ix