PDC Energy — Petroleum Development — Investor Day (July 2010)
88 slides from PDC Energy's investor day presentation, Jul 15, 2010
Slide 1: Analyst Day - Colorado July 15, 2010
Analyst Day - Colorado July 15, 2010
Slide 2: Disclaimer
Disclaimer The following information contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. These forward-looking statements are based on Management’s current expectations and beliefs, as well as a number of assumptions concerning future event
Slide 3: Welcome
Welcome Introductions • Peter G. Schreck, Vice President - Finance and Treasurer Presenters • Richard W. McCullough, Chairman and Chief Executive Officer • Barton R. Brookman, Senior Vice President - Exploration and Production • Gysle R. Shellum, Chief Financial Officer • Lance A. Lauck, Senior Vice
Slide 4: Analyst Day Agenda
Analyst Day Agenda I. Introduction of New Name and Logo (Rick) II. Overview of PDC Energy and Status of the New Direction (Rick) III. Operational Update (Bart) IV. 2010 Guidance Update (Gysle) V. New Business Developments (Lance) VI. Three Year Plan (Lance) VII. Peer Analysis (Lance) VIII. Wrap-Up (
Slide 5: Rick McCullough
Rick McCullough Chairman and Chief Executive Officer
Slide 6: What the PDC Energy Logo Represents
What the PDC Energy Logo Represents The copper circle symbolizes the earth, the source of PDC’s assets. The flame is reversed out of the copper background, representing natural gas. The black drop within the white flame stands for petroleum. The PDC Energy logo consists of three elements—a circle, a
Slide 7: What's New at PDC Energy
What’s New at PDC Energy • The New PDC Team – Senior Executive Team: Rick, Gysle, Bart, Dan, Lance – Other Key Officers: Scott Reasoner, Jim Schaff, Peter Schreck, Scott Meyers • The New PDC – Repurchasing Limited Partners interests in PDC partnerships – Increasing oil component of asset base (targe
Slide 8: Transition of PDC Energy 2008 - 2010
Transition of PDC Energy 2008 - 2010 I. NYC Analyst Day - March 2009 - outlined “SHAREHOLDER VALUE” focus; began cost control and operational enhancement initiatives II. July 2009 - laid out a new direction; transition to traditional E&P company and began reconfiguration of asset inventory III. Marc
Slide 9: Continued Progress in 2010
Continued Progress in 2010 2010 Goal/Metric 2010 Result 1. Allocation of drilling capital to all core areas 1. Incorporated into 2010 capital budget 2. Expansion of drilling in Wattenberg Field and Piceance Basin 2. Kreiger Acquisition, Suncor pref. rights, larger capital allocation to Wattenberg Fi
Slide 10: What We Plan to Address Today
What We Plan to Address Today • Update on core development activity and new exploratory projects – Piceance economics and plans – Wolfberry and horizontal Niobrara plans – New Ohio exploration project and Bakken update • Revised 2010 Guidance – Production, exit rates, capital and operating budgets,
Slide 11: Industrial and Power Demand Growing
Industrial and Power Demand Growing
Slide 12: Industrial and Power Demand Growing
Industrial and Power Demand Growing
Slide 13: Piceance Flows versus Capacity
Piceance Flows versus Capacity Source: Bentek Energy LLC
Slide 14: Rockies Fill Watch
Rockies Fill Watch Source: Bentek Energy LLC
Slide 15: Impact of Oil on Profitability
Impact of Oil on Profitability PDC plans to expand into oilier plays to increase profitability and diversify reserve base . • Transition portfolio towards 65% gas and 35% oil • Future cash flow and earnings growth driver • New drill oil wells’ IRR projected to be 40%-75% PDC is well positioned with
Slide 16: Bart Brookman
Bart Brookman Senior Vice President - Exploration and Production
Slide 17: Opening Summary
Opening Summary • PDC’s core operating basins have returned to profitability and will be strong growth drivers – Piceance Basin economics continuing to improve – Wattenberg Field oil/NGL component driving solid returns • Shift of asset mix and new drilling opportunities – Wolfberry drilling to begin
Slide 18: Core Operating Regions
Core Operating Regions Rocky Mountains Appalachian Basin (PDCM) Rocky Mountains (90%) West Texas 2010E Production: 2.5 Bcfe 2010E Production: 0.8 Bcfe** 2010E Production* 36.4 Bcfe Michigan Basin (2%) Appalachian Basin (7%) Expected to Close August 2010 2010E Production: 0.5 Bcfe** West Texas (1%) *
Slide 19: Piceance Basin Grand Valley Field Project Overview
Piceance Basin Grand Valley Field - Garfield County, CO Project Overview Gross Operated Wells 288 Undeveloped Acreage 5,300 Gross Undeveloped Locations 433 Net Undeveloped Locations 362 • PUD 243 • Probable 63 • Possible 14 • Subeconomic Resources* 42 *Subeconomic at year-end 2009 SEC pricing, econo
Slide 20: Piceance Basin Key Economic Parameters
Piceance Basin Grand Valley Field - Garfield County, CO Key Economic Parameters Reserves Per Well 1.48 Bcfe IP Rate 1082 Mcfe/d Gross Cost Per Well $1.9 MM Average PUD Working Interest 84% Average PUD Net Revenue Interest 71% At 5/28/10, three-year average NYMEX gas price is $5.49; NYMEX oil is $80.
Slide 21: Piceance Basin Improvement Projects
Piceance Basin Improvement Projects Grand Valley Field - Garfield County, CO Improvement Projects • Drilling time reduction – H&P flex rig early results reflect two day reduction from spud to spud – Improvements continue and further reductions are expected • Salt water disposal – Received COGCC perm
Slide 22: Piceance Mesa Type Curve
Piceance Mesa Type Curve Oil Yield: 1 bbl/MMcf Water Yield 24 bbl/MMcf Mesa Type Parameters at 5/28/2010 NYMEX Strip Gas Initial Rate (Qi): 1082 Mcf/d b = 1.8 Di: 62.3% Df: 6% 100% WI, 85% NRI Oil Differential (NYMEX): -$18/bbl Gas Differential Fraction: (NYMEX): 80% 2010 to 85% in 2014 BTU Factor:
Slide 23: Wattenberg Field Project Overview
Wattenberg Field DJ Basin - Weld County, CO Project Overview Gross Operated Wells 1,410 Developed Acreage 45,600 Undeveloped Acreage 24,900 Total Acreage 70,500 Gross Undeveloped Locations* 1,533 Net Undeveloped Locations* 831 • PUD 373 • Probable 315 • Possible 141 • Subeconomic Resources 2 *Vertic
Slide 24: Wattenberg Field Key Economic Parameters
Wattenberg Field DJ Basin - Weld County, CO Key Economic Parameters Reserves Per Well 0.29 Bcfe (0.52 Bcfe Refrac) IP Rate 113 Mcf/d, 24 Bbl/d Gross Cost Per Well $0.6MM D&C (+ $0.2 MM Refrac) Average PUD Working Interest 77% Average PUD Net Revenue Interest 61% At 5/28/10, three-year average NYMEX
Slide 25: Wattenberg Production Comparisons
Wattenberg Production Comparisons 2009 Drilling Program - Actual vs. Predicted Average Booked EUR: 0.264 Bcfe Average Engineered EUR: 0.290 Bcfe Average Actual EUR: 0.320 Bcfe
Slide 26: Wattenberg Codell/Niobrara Type Curve
Wattenberg Codell/Niobrara Type Curve NE Type Parameters at 5/28/2010 NYMEX Strip Oil Initial Rate (Qi): 24 bbl/d b = 1.4 Di: 65% Df: 8% Gas Initial Rate (Qi): 113 Mcf/d b = 1.5 Di: 55% Df: 8% 100% WI, 80% NRI Oil Differential (NYMEX): -$6.30/bbl Gas Differential Fraction, BTU Adjusted: (NYMEX): 120
Slide 27: Niobrara Resource Potential/Overview of Opportunity
Niobrara Resource Potential/Overview of Opportunity PDC Advantage - Niobrara Development • Highly experienced Wattenberg team – Bart Brookman, Senior Vice President E&P, 22 years Wattenberg experience – Scott Reasoner, Vice President Western Operations, 26 years Wattenberg experience – Tony Sharp, A
Slide 28: Niobrara Resource Potential continued
Niobrara Resource Potential/Overview of Opportunity … continued Basin Level Resource Potential - Niobrara (unrisked) • Vertical/horizontal drilling opportunities exist among all 70,500 acres of leasehold – 120 Bcfe in place (20 MMBoe) per section – 13 Tcf gas equivalent in place – Approximately 650
Slide 29: Horizontal Niobrara Drilling Opportunities
Horizontal Niobrara Drilling Opportunities Wattenberg Field Area • 70,500 net acres leased in DJ Basin horizontal Niobrara drilling play • 64,900 net acres leased in the core Wattenberg Area • Initial identification of multiple potential horizontal Niobrara drilling locations on core Wattenberg leas
Slide 30: Niobrara Acreage Concentration
Niobrara Acreage Concentration Source: Johnson Rice & Co., 6/30/10.
Slide 31: Development Plan/Economics - Niobrara Formation
Development Plan/Economics - Niobrara Formation Wattenberg Field Area, Weld County, CO Codell/Niobrara Vertical New Drill Niobrara Vertical Recompletion Niobrara Horizontal New Drill Well Cost ($MM) 600 240 3,500 IP (BOe/d) 43 20 289 Gross EUR (MBOe) 48 14 300 ROR (%) 37 60 71 PV 10 ($MM) 470 208 4,
Slide 32: PDC Mountaineer JV Marcellus Status
PDC Mountaineer JV Marcellus Status • Recently reached total depth on third horizontal well – Averaged 28 day drill time • Well #1: 24 days • Well #2: 44 days • Well #3: 16 days • First horizontal completion executed in late June - 15 stages – Selling gas at rates in line with 3 Bcf type curve (flow
Slide 33: PDC Mountaineer JV Marcellus Production Update
PDC Mountaineer JV Marcellus Production Update
Slide 34: PDC Mountaineer JV Marcellus Horizontal Type Curve
PDC Mountaineer JV Marcellus Horizontal Type Curve EUR: 3.0 BCFE
Slide 35: PDC Mountaineer JV WV Marcellus Position
PDC Mountaineer JV WV Marcellus Position 43,408 Net Acres Note: Net acreage represents total JV acreage.
Slide 36: PDC Mountaineer JV PA Marcellus Position
PDC Mountaineer JV PA Marcellus Position 15,219 Net Acres Note: Net acreage represents total JV acreage.
Slide 37: PDC's Marcellus Concentration
PDC’s Marcellus Concentration Marcellus Shale Acreage per 1,000 Shares
Slide 38: PDC Mountaineer JV Marcellus Midstream Update
PDC Mountaineer JV Marcellus Midstream Update • PDCM’s JV Board approved a ten year commitment to firm takeaway capacity escalating to 26 MMcf/d in the first two years • Commitments will be with an existing pipeline; no construction delays anticipated • Firm takeaway satisfies capacity commitment of
Slide 39: PDC Mountaineer JV Marcellus: 2010 Second Half Plans
PDC Mountaineer JV Marcellus: 2010 Second Half Plans • Redeploy horizontal rig September 1st – Drill four to seven wells – Executing long-term drilling rig contract through 2011 • Four additional completions – Limited pumping service availability • Execute short term midstream solution • Continue ve
Slide 40: Wolfberry Acquisition - Acreage Overview
Wolfberry Acquisition - Acreage Overview • Key Development Areas – Roy Parks – Mabee – Ratliff – Other Permian • Development Potential – 120 Wolfberry locations • Anticipate 1 rig program starting Q4 2010 – Multiple re-completion targets – Product optimization • Key Offset Operators – Concho – Devon
Slide 41: Wolfberry Acquisition - 2010 Activity Summary
Wolfberry Acquisition - 2010 Activity Summary • Finalizing organization – District Manager – Senior Engineer – Geologist – Land Man • Finalizing due diligence • Reviewing completion options • Preparing for August operations commencement • Eight wells expected to return to production - Q3 and Q4 ~$1.
Slide 42: Ohio Tecumseh Project
Ohio Tecumseh Project • Current leasehold of 50,000 acres • 75% PDC WI • 62% average PDC NRI • Additional leasing efforts underway • First proof of concept well scheduled for Q3 2010 Tecumseh Project Fairway Producing well Area of Leasehold
Slide 43: Ohio Tecumseh Project History
Ohio Tecumseh Project History • Project was developed primarily in the early 1990’s • Late Cambrian sands (Rose Run) and early Ordovician carbonates (Beekmantown) – TD 3,500’ - 4,500’ • Seismic dependent play • Improved seismic technology should improve success rate • Statewide produced >375 Bcf/eq
Slide 44: Ohio Tecumseh Erosional Remnants - Analogs
Ohio Tecumseh Erosional Remnants - Analogs • Targets are Erosional Remnants (as shown) encased in a shale • The remnant can provide for an economic well and produce a very clear signature if it possesses the correct properties
Slide 45: Ohio Tecumseh Economic Summary/Plans
Ohio Tecumseh Economic Summary/Plans • Un-risked full development IRR > 100% • Fully risked full development IRR > 50% • Average EUR/well approximately 0.25 Bcfe • Recoverable reserve potential 50 Bcfe 2010 Plans • Spud first two wells in August 2010 • Drill six proof of concept wells in second half
Slide 46: Horizontal Bakken Play Burke County, North Dakota
Horizontal Bakken Play Burke County, North Dakota PDC Horizontal Bakken Wells Competitor Horizontal Bakken Activity • PDC has 50% WI in approximately 19,000 gross acres leased • There are a minimum of eight horizontal Bakken drilling permits issued or pending in the immediate area • PDC Jepsen #21-2
Slide 47: Mid-Year Capital Expenditure Update
Mid-Year Capital Expenditure Update Changes from Original 2010 Guidance Wattenberg • Outstanding production performance, record drilling efficiencies • Adding a 3 rd rig in Q4 • Acquired Suncor preferential rights • Acquired acreage for Niobrara horizontal drilling • Drilling a horizontal Niobrara t
Slide 48: 2010 Planned Development Projects
2010 Planned Development Projects PDC Marcellus • 3 Verticals • 7-10 Horizontals NECO • 15 New Drills Wattenberg • 185 New Drills -165 Operated New Drills -20 Non-Op New Drills • 58 Refracs/Recompletes Piceance • 25 New Drills West Texas • 2 New Drills • 4 Recompletions, other reactivations Shallow
Slide 49: Mid-Year Capital Expenditure Update
Mid-Year Capital Expenditure Update $ MM
Slide 50: 2010 Development Capital Update
2010 Development Capital Update Anticipated IRR of 30% on $169 MM of 2010 development capital.
Slide 51: Operations Forecast Comparison
Operations Forecast Comparison 2009 2010E % Increase/ (Decrease) Total Net Production (Bcfe) (1) 43.3 36.4 (16%) Gross Exit Rate (MMcfe/d) 187 186 (1%) Net Exit Rate (MMcfe/d) 107 107 0% Net Exit Rate (MBbl/d) 3.1 4.3 39% Net Exit Rate (MMcf/d) 88.1 80.8 (8%) Net Development Capital ($MM) $79 $141 7
Slide 52: Gysle Shellum
Gysle Shellum Chief Financial Officer
Slide 53: 2010E Guidance Update
2010E Guidance Update • Reserves, production and capital expenditures per the revised internal operating plan • Improved Wattenberg Field volumes due to pref. right acquisition and better overall performance, partially offset by lower Marcellus production due to timing delays • Based on a price rang
Slide 54: 2010E Michigan/Permian Basin Transaction
2010E Michigan/Permian Basin Transaction • Acquisition of Texas Permian Basin Wolfberry Trend assets provides an additional production growth basin • Michigan and Permian Basin 2010 production volumes were projected to be essentially equal • Permian Basin larger oil production mix provides additiona
Slide 55: 2010E FY EPS Updated Guidance
2010E FY EPS Updated Guidance $ MM Note: Low range provided on 3/12/2010 has remained unchanged.
Slide 56: 2010E Metrics Update
2010E Metrics Update Lifting Costs (2) Capital Spending • 2010E average sales price increase over 2009 due to larger oil production component and slightly better gas prices. 1) Average Sales Price excluding gain/loss on derivatives. 2) 2010E lease operating expense increased an estimated 8% due to h
Slide 57: Natural Gas and Oil Hedges
Natural Gas and Oil Hedges As of May 28, 2010 2010 2011 2012 2013 Weighted Average Hedge Price (Mcfe) (1) With Floors $7.50 $6.98 $6.49 $6.37 With Ceilings $8.12 $7.44 $7.83 $8.20 % of Forecasted Production (1) 78% 74% 60% 58% Weighted Avg Forward Price (2) $5.74 $6.56 $6.94 $7.17 Weighted Avg Price
Slide 58: 2010E Debt & Liquidity Guidance
2010E Debt & Liquidity Guidance $ MM
Slide 59: Analyst Estimates 2010E Earnings Guidance
Analyst Estimates 2010E Earnings Guidance Production (Bcfe) Earnings (Loss) per Share Company Analyst Date Street Estimate Street Estimate C.K. Cooper Joel Musante 6/8/2010 37.1 $0.38 Canaccord Irene Haas 6/29/2010 35.8 $1.49 Credit Suisse Mark Lear 6/22/2010 36.2 $0.10 Global Hunter Phil McPherson
Slide 60: Lance Lauck
Lance Lauck Senior Vice President - Business Development
Slide 61: New Business Developments
New Business Developments
Slide 62: Acquisition Strategy
Acquisition Strategy Focus Areas • Core Area Acquisitions - Rockies and Appalachia / Marcellus – Current production with growth upside - close to existing PDC operations • New Basin Acquisitions - Align with PDC Strengths – Basin study results (Permian, Mid Continent) – Scale and repeatability – Pri
Slide 63: Wolfberry Acquisition in the Permian Basin Key Highlights
Wolfberry Acquisition in the Permian Basin Key Highlights • Acquiring producing assets from private seller in Wolfberry Trend for $45MM plus PDC’s producing Michigan Gas assets valued by the seller at $30MM • Includes 72 wells on approximately 8,300 net acres • Should add approximately 900 Boe/d ove
Slide 64: Wolfberry Acquisition Acreage Overview with Surrounding Activity
Wolfberry Acquisition Acreage Overview with Surrounding Activity Key Development Areas • Roy Parks • Mabee • Ratliff • Other Permian Development Potential • 120 Wolfberry locations • 1 rig program starting Q4 2010 anticipated • Multiple re-completion targets • Production optimization Key Offset Oper
Slide 65: Wolfberry Acquisition Comparison
Wolfberry Acquisition Comparison Wolfberry Oil Acquisition for Michigan Gas Trade plus $45 mm Cash Metric Michigan Wolfberry Full-Cycle Cash Margin ($/mcfe) $2.40 $8.50 % Oil 1% 69% Inventory of Wells 2 120 Production Growth 6% decline 70% 3-yr CAGR Michigan PDP Decline Wolfberry Development Growth
Slide 66: Partnership Purchases Three-Year Plan to Acquire
Partnership Purchases Three-Year Plan to Acquire • Limited Partners’ non-operated interest is typically 60-80% of certain PDC operated wells (Rockies principally) • 28 Limited Partnerships have net reserves of approximately 125 Bcfe and net production of approximately 25 mmcfe/d owned by the Limited
Slide 67: Partnership Purchases 2010 Program
Partnership Purchases 2010 Program: 2004 A, B, C, D Current Status • Awaiting SEC comments regarding partnership proxy statements Asset Description • Non-operated interest in existing PDC wells in Piceance Basin and Wattenberg Field Partnership Overview • Offer Price: $36.4 million for 4-2004 partne
Slide 68: Inventory of Remaining Partnerships
Inventory of Remaining Partnerships Remaining Partnerships after 2010 Purchase Program • 24 Limited Partnerships will remain after 2010 purchase transaction • Limited Partners’ remaining net reserves of approximately 95 Bcfe • Limited Partner’s remaining net production of 21.4 mmcfed • Limited Partn
Slide 69: Three Year Plan
Three Year Plan
Slide 70: PDC Business Model & Key Objectives
PDC Business Model & Key Objectives Acquire and Exploit Strategy with Exploration Component – Acquire assets that build project inventory and drive production growth • Build out / high grade asset portfolio towards more oil / ngl weighted projects – Exploit existing inventory by capitalizing on oper
Slide 71: Three-Year Production Outlook
Three-Year Production Outlook: Projected Range of 15 to 20% Annual Growth Three-Years Ended 2013 • Risked Organic Growth: 15% CAGR Areas Rigs – Permian / Wolfberry 1 • Risked Additional Growth: +5% CAGR – Partnership buybacks 75% Success – Exploration primarily of existing inventory • Horizontal Nio
Slide 72: Three-Year Capital Outlook and Funding Requirements
Three-Year Capital Outlook and Funding Requirements Total 2011 - 2013 Key Parameters Risked Organic Risked Organic + Additional Growth Production Growth Range 15% 20% CAPEX $ 630 - $700 MM $ 870 - $970 MM *Adjusted Cash Flow $ 560 - $600 MM $ 640 - $700 MM Funding Requirement $70 - $100 MM $ 230 - $
Slide 73: 2013 Proven Reserve Outlook
2013 Proven Reserve Outlook Year-Ended 2009 Proved Reserves 717 Bcfe Net Reserves Location Commentary 200 Bcfe Existing 2009 YE Prob/Poss Offsets, 5 Yr Drill Window (Net of allocation to PDC Mountaineer JV) 150 - 300 Bcfe Marcellus Shale - net to PDC Initial 230 Hz wells (only 30% acreage on 80 acre
Slide 74: F&D Outlook 2010 to 2013
F&D Outlook 2010 to 2013 (4 years incl 2010) Total 2010 - 2013 Key Parameters Risked Organic Risked Organic + Additional Growth Production Growth Range 15% 20% CAPEX (incl 2010 capex) $905 - $975 MM $1,145 - $1,245 MM Reserve Adds 380 - 540 Bcfe 530 - 765 Bcfe F&D Costs $2.38 - $1.81 per Mcfe $2.16
Slide 75: PDC Summary Three-Year Plan
PDC Summary Three-Year Plan – Pursuing an Acquire, Exploit & Explore Business model focusing on key U.S. Onshore basins capitalizing on PDC’s skill sets – Projecting a risked range of production growth of 15 - 20% per year for the three year period ended 2013 (excludes new acquisitions); for the per
Slide 76: Peer Analysis
Peer Analysis 3Y Business Plan Outline and Drivers of Company Value Version 2 Peer Analysis
Slide 77: Why Peer Analysis? Three-step process
Why Peer Analysis? Three-step process 1. Determine how PDC’s operational, financial and transactional metrics compare to peer E&P companies 2. Analyze reasons why PDC trades at a discount to peers 3. Identify key action steps PDC can pursue to improve performance Consistent execution of PDC’s new th
Slide 78: Peer Company Comparisons Selected by PDC
Peer Company Comparisons Selected by PDC Ticker Share Price Shares MM Debt MM Enterprise Value MM 2010E CFPS 2010E EBITDAX ” % Gas % PDP RLI 3Y Avg PD F& PETD $23.78 19 $456 $250 $707 $6.94 $156 3.23 773 85% 41% 37 19.4 $3.08 -3.6% Peer Median $603 $434 $1,037 $4.00 $145 3.37 699 86% 50% 39 18.4 $3.
Slide 79: Peer Company Comparisons
Peer Company Comparisons PETD trades at or near the lowest value compared to its peer group in every category. As PDC executes on its three- year business plan it should begin to trade in-line with its peers. Median = 5.0X Median = 7.7X
Slide 80: Peer Comparisons - 2010 Transactions
Peer Comparisons - 2010 Transactions Recent Asset Transaction Reserve Metrics • PDC trades at a discount on a proved reserve basis relative to recent transactions Median = $2.14/Mcfe Median = $12,044 / Mcfe
Slide 81: Peer Comparisons - Key Takeaways
Peer Comparisons - Key Takeaways Metric PDC Peer Group 2010 CFM 3.4x 5.0x EV to EBITDAX 2010E 4.5x 7.7x EV to Mcfe 2010E $0.91 $1.83 EV to Mcfe/d $7,000 $10,051 Transactions - Reserves EV to Mcfe $0.91 $2.14 Transactions - Production EV to Mcfe/d $7,000 $12,044 Step One - How PDC Trades Relative to
Slide 82: Peer Analysis - Key Takeaways
Peer Analysis - Key Takeaways Step two - Why PDC believes it is traded at a discount Step three - Improvements PDC is pursuing Developed multi year execution plan capable of delivering 15-20% value-added growth Portfolio with high concentration of Rockies gas Pursuing and achieving margin improvemen
Slide 83: PETD Historical Market Performance Relative to XNG Index
Peer Comparisons - Key Takeaways PETD Historical Market Performance Relative to XNG Index PDC traded in line with the XNG thru the fall of 2008 then lagged for most of 2009. While market has begun rewarding PDC in 2010 for improved performance, PDC still needs to achieve additional value-added perfo
Slide 84: PDC Implied Share Price if Traded In-Line with Peers
PDC Implied Share Price if Traded In-Line with Peers + PDC is pursuing several initiatives to improve shareholder value + PDC trades at a discount compared to its peers based on trading and transaction metrics + PDC must demonstrate consistent performance to trade in-line with its peers $100 $90 $80
Slide 85: Wrap-Up
Wrap-Up
Slide 86: Wrap-Up
Wrap-Up Year Weighted Forward Price as of May 2010* 2009 Actual $4.20 2010 $5.74 2011 $6.56 • Achieved 34% (CAGR) production growth for years 2005 - 2009 • 2008 price collapse necessitated cost reductions and liquidity preservation into • 2010 - Resumed drilling in all core areas; acquired new asset
Slide 87: Wrap-Up continued
Wrap-Up … continued • Outperforming the XNG index • Valuation gap has improved by approximately 50% y-t-d • Emerging from recession, focused, well capitalized with great assets and strong management team • Will continue to reconfigure asset base, increase oil mix, and drive down costs through acquir
Slide 88: Contact Information
Contact Information Investor Relations • Peter G. Schreck, Vice President - Finance and Treasurer [email protected] • Marti J. Dowling, Manager Investor Relations [email protected] • Heather R. Davis, Investor Relations Coordinator [email protected] Corporate Headquarters • PDC Energy 1775 Sherman Stre