  1. Slide 1: Consumers Energy Hydro Strategy Croton Dam Community Conversation

    Consumers Energy Hydro Strategy Croton Dam Community Conversation Maggie Pallone and Elizabeth Riggs, Public Sector Consultants Marianne Walter and Rich Houtteman, Consumers Energy September 8, 2022 PUBLICSECTORCONSULTANTS.COM

  2. Slide 2: Conversation Objectives

    Conversation Objectives • Share information about the development of Consumers Energy’s long-term hydro strategy • Gain community-wide understanding about the process and future scenarios • Gather input on community factors that should be accounted for in the strategy To be clear, tonight is about i

  3. Slide 3: Overview of Consumers Energy River Hydro Strategy

    Overview of Consumers Energy River Hydro Strategy September 2022 PUBLICSECTORCONSULTANTS.COM

  4. Slide 4: CE River Hydro History

    CE River Hydro History Owned more than 90 river hydro assets Typically, small multiple-use assets that supported a local community Generation advances and exhaustion of prudent locations stopped expansion 70+ assets sold or retired between 1940 and 1970 due to asset value (customer value vs. cost) 4

  5. Slide 5: River Hydro Fleet Details

    River Hydro Fleet Details ri Average Pla FERC License J bam | Capacity (MWs) | MW/day Expiration Date Rogers 6.75 2.66 1906 6/30/2034 Hardy 31.5 11.87 1931 6/30/2034 Croton 8.85 3.79 1907 6/30/2034 Hodenpy! 17 5.57 1925 6/30/2034 Tippy 20.1 7.13 1918 6/30/2034 Calkins Bridge 2.55 1.52 1935 3/31/2040

  6. Slide 6: Regulatory Agencies

    Regulatory Agencies • Michigan Public Service Commission • Federal Energy Regulatory Commission (FERC) • Division of Hydropower Administrative and Compliance (DHAC) • Michigan Department of Environment, Great Lakes, and Energy (EGLE) • Michigan Department of Natural Resources (DNR) • U.S. Fish and W

  7. Slide 7: Detailed Review

    Detailed Review Safety Complying with regulations Cost of operation Environment Community Recreation 10

  8. Slide 8: Safety

    Safety Satisfactory Condition with FERC FERC Inspections Owner’s Dam Safety Program Public Safety 11

  9. Slide 9: Complying with Regulations

    Complying with Regulations Division of Hydropower Administration and Compliance FERC Licensing Process • Integrated Licensing Plan Dam Safety and Inspections • Updated Regulations in 2022 12

  10. Slide 10: Cost of Operation (Fleet)

    Cost of Operation (Fleet) Benefit of CE River Hydros: Total average value = $12.9M/year 250 Cost of River Hydros: 200 Dollars (Millions) Capital Investment 150 Operations and Average = $165M maintenance = $12.6M/year 100 • Funding for internal/external labor to 50 Operations & Maintenance Expense op

  11. Slide 11: Croton Dam Cost

    Croton Dam Cost Actual Forecasted Actual Capital Forecasted O&M Costs O&M Costs Costs Capital Costs 2017-2021 2023-2027 2017-2021 2023-2027 Croton $4.72M $5.57M $15.74M $11.69M Training Wall and Apron Projects Forecast(2023-2025): $7.9M Unit 3 Overhaul Projects Forecasts (2026-2028): $2.9M Croton Av

  12. Slide 12: Environment

    Environment River sediment Water quality A downstream barrier (invasive species) Adjacent land is a key Karner blue butterfly habitat area 15

  13. Slide 13: Community

    Community World record and first to transmit 110,000 volts Fishing tournaments, Newaygo National Event, and Dam 2 Dam Popular salmon and steelhead fishery in spring and fall Here for feedback 16

  14. Slide 14: Recreation

    Recreation Approximately 37K annual recreational visitors Two boat launches Fishing pier and downstream fishing access Campground—beach Pedestrian Trails—The Edge 17

  15. Slide 15: Future Scenarios

    Future Scenarios • Relicense the dam, meeting all the new regulatory requirements, and continue to generate power • Surrender the license and sell the dam to a third-party owner, who could maintain the dam structure and impoundment • Remove the dam and return the river to its natural state • Replace

  16. Slide 16: Relicensing—Integrated Licensing Process

    Relicensing—Integrated Licensing Process • Relicensing is handled through FERC • Examples of issues the applicant will and takes approximately five years need to study are: • The process involves the general - Water quality and other public, nongovernmental environmental issues organizations, tribal

  17. Slide 17: Surrendering the FERC License

    Surrendering the FERC License • Consumers may choose to no longer generate power and not relicense the facility. This process would require them to file a request with FERC to surrender their license • Without power generation, Consumers could look to alternative options for the dam: - Transfer owne

  18. Slide 18: Transferring Ownership: Four Lakes Task Force

    Transferring Ownership: Four Lakes Task Force • Four dams located on the Tittabawassee River in Midland and Gladwin Counties • Ownership was transferred from a private party to the Four Lakes Task Force, which oversees the Special Assessment District (SAD) on behalf of the counties • Counties establ

  19. Slide 19: Removal of a Dam: Boardman River

    Removal of a Dam: Boardman River • The process for removing a dam is regulated by state and federal agencies. When considering a dam removal, the applicant and regulators take into account: - Benefits of the dam and the impoundment (preventing the movement of aquatic invasives, sediment control, his

  20. Slide 20: Replacing the Dam: Frankenmuth

    Replacing the Dam: Frankenmuth • When a full removal of the dam does not meet the needs of the community, regulators, and/or dam owners, dams can be replaced with a different in-river structure. These option may include: - Modifications to the current dam - Replacing the dam with a different dam str

  21. Slide 21: Engagement Process and Plan Development Timeline

    Engagement Process and Plan Development Timeline • August–October 2022: Pre-strategy development community engagement - Community meetings around each dam - Website launched - Survey of property owners located within 100 feet of Consumers’ property lines • Early 2023: Long-term hydro strategy is dev

  22. Slide 22: Community Input

    Community Input PUBLICSECTORCONSULTANTS.COM 25

  23. Slide 23: Community Input

    Community Input What does Consumers Energy need to understand about this community's relationship to the river, the dam, and its impoundment? PUBLICSECTORCONSULTANTS.COM 26

  24. Slide 24: Community Input

    Community Input How would that relationship change if Consumers Energy no longer owned the dam? PUBLICSECTORCONSULTANTS.COM 27

  25. Slide 25: Community Input

    Community Input Does the information presented this evening change your opinion on the dam and its future? PUBLICSECTORCONSULTANTS.COM 28

  26. Slide 26: Community Input

    Community Input Regardless of the outcome, what would Consumers Energy need to provide to your community to make you feel their decision was prudent and your input was incorporated? PUBLICSECTORCONSULTANTS.COM 30

  27. Slide 27: For more information, please visit www.consumersenergy.com/hydrofuture

    For more information, please visit www.consumersenergy.com/hydrofuture PUBLICSECTORCONSULTANTS.COM 31

  28. Slide 28: Public Sector Consultants

    PUBLIC SECTOR CONSULTANTS Consume