Enertopia Corp. · CSE:ENRT
Enertopia — Investor Presentation (December 2018)
13 slides from Enertopia's investor presentation, December 2018
Slide 1: Emerging Lithium Opportunity
OTCQB: ENRT CSE: TOP Emerging Lithium Opportunity December 2018 Update
Slide 2: Disclaimer
Disclaimer This presentation includes forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. Statements which are not historical facts are forward-looking statements. The Company make
Slide 3: Project Location Nevada State Map
Project Location Nevada State Map Enertopia currently controls 100% of approximately 160 Acres of Placer and Lode Claims in Clayton Valley, Nevada Enertopia Lithium Project 3
Slide 4: Enertopia Project Location
Enertopia Project Location Near paved highways and power. High solubility Lithium source rocks at surface. Enertopia project outlined in black. 3rd party drilling by Cypress Development adjacent to our western boundary has resulted in a 43-101 Tech Report defining an indicated resource of 3,835,000
Slide 5: Enertopia Placer and Lode claim block shown in blue and gold
Enertopia Placer and Lode claim block shown in blue and gold Three of Cypress Development drill holes marked in red. DCH-9 and DCH -13 are closest to Enertopia’s western project border. Vertical trace of Hole DCH-14 and DCH-13 cross section shown on next page. HOLE From To Est Avg Meters Meters Thic
Slide 6: Cross Section Cypress DCH-14, DCH-13
Cross Section Cypress DCH-14, DCH-13 Trace of Hole DCH-14 and DCH-13 cross section looking NW. Dipping east to Enertopia claims. 6
Slide 7: Planned drill locations shown in Red dots
Planned drill locations shown in Red dots Planned Project work below: Four DDH holes 01-04 to be drilled from 250 to 300+ feet each. These holes will be used to calculate a project wide lithium resource over our 160 acres of placer and Lode claims. One Metallurgical test hole will be drilled off the
Slide 8: Strategic location for Project and Technology Advancement
Strategic location for Project and Technology Advancement ▪ Project is located on an uplifted block of lithium rich sediments confirmed by 3rd party surface sampling and drilling adjacent to the project with numbers averaging above 1,000 ppm Li at surface and in drill holes. ▪ Lithium values are hos
Slide 9: Next Steps for Enertopia
NEXT STEPS FOR ENERTOPIA PROJECT DEVELOPMENT: Drill four holes to ~300 foot depths. Drill one additional hole for metallurgical testing of horizons by pH solution testing of every 5 foot interval. Complete 43-101 defining project wide indicated lithium resource. TECHNICAL DEVELOPMENT: Continued test
Slide 10: Advisory Consultants
ADVISORY CONSULTANTS Dr. John Thomas — Technical Advisor Dr. Thomas is a professional engineer, and holds a B.Sc., an M.Sc., and a Ph.D. in chemical engineering from the University of Manchester in the United Kingdom. He also received a diploma in accounting and finance from the U.K. Association of
Slide 11: Management Team
MANAGEMENT TEAM President & CEO: Robert McAllister Mr. McAllister has served as President of Enertopia since November 2007 and as a Director since April 2008. Mr. McAllister was responsible for Investor Relations and Corporate Communications for publicly traded mining and oil & gas listed companies.
Slide 12: President's Message
President’s Message “In 18 months we have gone from the concept of recovering Lithium from brines and soft rock using todays technologies. Now with the addition of our at surface Lithium project our key milestone for our next phase of technology development and ultimate goal of processing battery gr
Slide 13: Contact Information
CONTACT INFORMATION Share structure President & CEO Robert McAllister Phone: 250-765-6412 Share Structure November 2018 Email: [email protected] Issued and Outstanding 121,964,931 Head Office Address: 156 Valleyview Rd. Warrants 39,219,989 Kelowna, BC V1X 3M4 Options 8,320,000 Fully Diluted 1