Nextraction Energy Corp · OTC:NXTFF
Nextraction Energy — Investor Presentation (March 2011)
23 slides from Nextraction Energy's investor presentation, March 2011
Slide 1: Corporate Presentation
Corporate Presentation March 2011 The NEXT round of extraction on known plays
Slide 2: Disclaimer and Forward Looking Statements
•DISCLAIMER The information contained in this presentation is confidential. The contents are not to be reproduced or distributed to any third party, including the public or press. The information contained herein, while obtained from sources which we believe are reliable, is not guaranteed as to its
Slide 3: Company Assets
Company Assets PROVOST VIKING oil SATURN 4 Producing Wells 31 Sections 3.25 Sections 20-50 potential wells 10 – 12 Horizontal well Multi-horizon potential Oil play CANADA USA PINEDALE 5.5 Sections; 1 producing well 32 possible well locations APPALACHIAN SHALE 109 Sections Up to 500 possible location
Slide 4: Corporate Management
Corporate Management Mark S. Dolar, President & CEO 30 years of experience in developing oil and gas reserves Discovered 2.5 trillion cubic feet of gas Industry leader in corporate governance Paul D. Trost, PhD, Chief Operations Officer Over 35 years experience in exploration and product
Slide 5: Share Structure
Share Structure March, 2011 Issued and Outstanding Shares 26,194,864 Warrants (3/29/11 @ $1.25) 2,120,000 Stock Options 2,140,000 Fully Diluted Shares 30,454,864 Current Share Price ~ $1.02 Current Market Cap ~ $26.7 MM Treasury $3.9 MM Nextraction Energy is a debt free, tightly held company 4
Slide 6: Provost Oil Project – Alberta, Canada
Provost Oil Project – Alberta, Canada • Cost: $2.8 million –Magnum Energy (JV Partner) pays 50% out of production • Nextraction`s Calgary-based Petroleum Engineer, Kent Edney, experienced at drilling Viking formation • Viking A Formation – Vertical wells have produced up to 300,000 barrels of oil pe
Slide 7: Provost Field
Nextraction Leasehold 15 potential horizontal wells 800 meter depth 1,200 meter leg $1.5M per well Provost Field Viking “A” sand Light oil – defined pool 6
Slide 8: Provost Field Defined Pool
Provost Field Defined Pool 80 million barrels of oil in place* 3 million barrels of oil produced to date* 297,000 barrels of oil Well Recompletions to increase production 240,000 barrels of oil Positive Conventional Nextraction Provost Viking JV Wells Eastern Alberta •McDaniels Consultants Uniti
Slide 9: Provost Viking A Oil Pool – Alberta, Canada
Provost Viking “A” Oil Pool – Alberta, Canada Acquisition includes 4 Producing Wells: Less than 5% of oil in place has been produced Cumulative to date: 665 thousand barrels of oil Daily Average Production: 30 barrels of oil/day Evaluating Opportunity to Increase Production Volumes of Existi
Slide 10: North Pinedale Project – Sublette Co., WY
North Pinedale Project – Sublette Co., WY • 100% interest in two wells with 150% revenue for payout, then 76% working interest • 100% interest in 1600 acres, 25% interest in 2500 acres • P2 reserves of 5.3 BCFGE; P3 reserves of 80 BCFGE* • 40 year life reserves • 30+ wells on 20 acre spacing *Based
Slide 11: North Pinedale Anticline
North Pinedale Nextraction Anticline Recently completed the 14,888’ Proposed Noble 6-24 well and Completed a 20 multi- location is producing stage frac Over 800 Feet of Net Noble #6-24 Pay Bottom Hole Location Combined IP of 4 Million Cubic Feet of Gas + 30 Barrels of Condensate Per Day Acqu
Slide 12: Subsurface Well Delineation
Subsurface Well Delineation Development moves in northerly direction on 5 to 20 acre spacing New location 800 feet of net pay Lance Formation Pay Zones Mesaverde Formation Pay Zones 11
Slide 13: Saturn Oil Project – Daniels Co. MT
Saturn Oil Project – Daniels Co. MT • Seismic Farm in Agreement • 3-D Seismic $1 million ( 75% Nextraction / 25% Primary Petroleum ) • Drilling program • 1st well after Seismic $1.2M to drill, core and produce • 4 potential oil producing reservoirs including Bakken • Earn 100% of 2 sections with wel
Slide 14: Saturn Oil Project
SATURN OIL PROJECT Daniels Co., MT Bakken Fairway Joint Venture with Primary Petroleum 3-D Seismic in Q2 2011 Followed by Test Well Multi-Horizon potential Bakken Ratcliffe Madison McGowan Mission Canyon Map Source – Primary Petroleum 13
Slide 15: Saturn Leasehold Position and 3-D Seismic Outline
Saturn Leasehold Position and 3-D Seismic Outline 14
Slide 16: Appalachian Basin Project – Kentucky and Tennessee
Appalachian Basin Project – Kentucky and Tennessee • 100% interest in 25 wells until payout; 75%-65% interest after payout • Over 500 locations on 70,000 acres • Multi-horizons, long life reserves • Sells into NYMEX market place • Undiscovered gas resource of 400-2,500 BCFGE* *Based on reserves proj
Slide 17: Appalachian Basin Shale Gas Project
APPALACHIAN BASIN SHALE GAS PROJECT Potential Resource Play of ~ 490-2,500 BCFG 500+ locations * Kentucky and Tennessee, USA *MHA Associates Inc. technical report dated effective 4-1-2010 16
Slide 18: Nextraction's Planned Drilling
( . 2 2 . .2 23 2 25 24 23 22 21 25 24 23 22 21 25 24 23 22 21 25 24 23 22 21 25 2 24 23 2 22 21 25 24 23 2 22 21 25 24 23 2 2 22 21 25 2 24 22 2 21 25 24 23 22 21 2 2 2 2 2 . 2 2 2. . 2 22 ( 2 2 2) ( ( 2 2 2 2 .2 2 . .( 2 2 2! 2 2 2 2 2 2 2 (. 2 2 2 2 2 ( 2 2 2 2. 2 2 2 2 2 ( . ! . 2 2 2 2 2 2 .2(
Slide 19: Nextraction's Theme for Growth
Nextraction’s theme for growth: Find the Next Round of Extraction on Known Plays Nextraction’s Mission Statement: Generate Shareholder Value though organic growth by applying our competitive advantage in identifying, drilling, completing and producing oil and gas reserves Nextraction’s Critera: Gene
Slide 20: Nextraction in 2011
Nextraction in 2011 Q1 Q2 Q3 Q4 Pinedale - Noble 6-24 Initial Flow Rate 3 Million CFG/D Provost - Nextraction Acquires Alberta Viking Oil JV Pinedale - NE Acquires 3-D Seismic, Initiates 2-D Seismic Provost - Recomplete 2 Viking Vertical Wells Provost - Permit Four / Drill Two Viking Horizontal Well
Slide 21: Nextraction 2012 Strategic Plan
Nextraction 2012 Strategic Plan Development 2012 Provost Viking Oil JV $7 million Saturn Multi-Horizon Bakken JV $7 million Pinedale Natural Gas/Condensates $7 million Appalachian Shale Project Maintenance/ Standy-by 20
Slide 22: Summary
SUMMARY Current Production Provost-Viking (Alberta) • Oil 30 b/day Current Production Pinedale (Wyoming) • Natural Gas 800,000 cubic feet of gas / day • Condensate 30 b / day Aggregate cash flow $120,000 / month ( 55% oil ) 2011 … Growth Plan is Clear and Funded 2012 … Develop Large Scale with E
Slide 23: Nextraction Energy Corp. Contact
Nextraction Energy Corp. 550 Burrard Street, Suite 328 Vancouver, B.C., Canada V6C 2B5 Company Contact: Investor Relations Contact: Daniel Gibbons Sequoia Partners, LLC Manager, Corporate Relations Phone: (604) 601-5614 Phone: (604) 630-0300 Don Graham Cell: (778) 558-4310 Cell: (604) 737-9021 James
Nextraction Energy — Investor Presentation (March 2011) on 6ix