Larsen & Toubro Limited · NSE:LT

Larsen & Toubro — Q3 FY2020 Earnings Presentation

48 slides from Larsen & Toubro's earnings presentation, Jan 22, 2020

  1. Slide 1: Investor Presentation Q3/9M FY20

    Slide 1: Investor Presentation Q3/9M FY20

    LARSEN & TOUBRO Investor Presentation Q3/9M FY20 January 22, 2020 1 1

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer This presentation contains certain forward retain highly skilled professionals, time and cost looking statements concerning L&T’s future over runs on contracts, our ability to manage our business prospects and business profitability, international operations, government policies which are

  3. Slide 3: L&T Overview

    Slide 3: L&T Overview

    L&T Overview Engineering Manufacturing Construction Projects Technology Financial Financial Services Services 3

  4. Slide 4: L&T – At a Glance

    Slide 4: L&T – At a Glance

    L&T – At a Glance India’s largest E&C company with interests in Projects, Infrastructure Development, Manufacturing, IT & Financial Services. Revenues Credit Ratings Market Cap Professionally ₹1,410Bn CRISIL: AAA / Stable ₹ 1,871Bn Managed Company ICRA: AAA (Stable) FY 19 Group 23rd Jan, 2020 (appro

  5. Slide 5: L&T – At a Glance

    Slide 5: L&T – At a Glance

    L&T – At a Glance Engineering Manufacturing Construction Projects Technology Financial Services

  6. Slide 6: L&T – Shareholding Pattern

    Slide 6: L&T – Shareholding Pattern

    L&T – Shareholding Pattern Bharat ETF, Others, Govt. 0.7% 8% Financial Mutual Institutions Funds & Pvt. & Insurance Insurance Companies, Cos., 20% 18% 30th Sep, Major Institutional Shareholders % Shares 2019 Life Insurance Corporation of India 14.3% L&T Employees FII’s & GDR, HDFC Mutual Fund 4.4% T

  7. Slide 7: Experienced Management Team

    Slide 7: Experienced Management Team

    Experienced Management Team 1 2 3 4 5 6 7 8 A M Naik S. N. R Shankar Shailendra Roy D. K. Sen M. V. Satish J.D. Patil Subramanian Group Subrahmanyan Raman Whole-time Director Whole-time Whole-time Director Whole-time Sarma Chairman Chief Executive Whole-time & Sr. Executive Vice Director & Sr. & Sr.

  8. Slide 8: Corporate Governance

    Slide 8: Corporate Governance

    Corporate Governance L&T’s essential character revolves around values based on transparency, integrity, professionalism and accountability. Board of Directors Four-tier Governance Executive Committee Structure (ECom) Independent Company (IC) Board Strategic Business Group (SBG) / Business Unit (BU)

  9. Slide 9: Sustainability & Integrated Report

    Slide 9: Sustainability & Integrated Report

    Sustainability & Integrated Report <IR> 2018-19 available on www.Larsentoubro.com In alignment with Based on International Global Reporting Integrated Reporting Initiative (GRI) Council (IIRC) framework Standards ‘In Accordance – Comprehensive Reports progress on option’ – highest Sustainable Develo

  10. Slide 10: Sustainability – Environment & Social

    Slide 10: Sustainability – Environment & Social

    Sustainability – Environment & Social Green Product Portfolio – INR 317. 65 Billion CSR Highlights – 2.3 million beneficiaries • Theme: Building India’s Social Infrastructure • 24 campuses have achieved the ‘zero water discharge’ status • Integrated Community Development Program • Secured 500+ MV Gr

  11. Slide 11: Business Overview

    Slide 11: Business Overview

    Business Overview Engineering Manufacturing Engineering Manufacturing Construction Projects Projects Technology Technology Financial FinancialServices Services 11

  12. Slide 12: Builders to the Nation

    Slide 12: Builders to the Nation

    Builders to the Nation Statue of Unity, Gujarat Turbine Rotor, Gujarat 88m Rail Bridge Jammu Udhampur Wankhede Stadium, Mumbai Baha’i Temple, Delhi Mumbai International Airport Medigadda Barrage, Telangana Vivekanand Bridge, Kolkata Kakrapar Nuclear Power Plant, Guj Vizag Steel Plant Sri Sathya Sai

  13. Slide 13: International Footprint – Marquee Jobs

    Slide 13: International Footprint – Marquee Jobs

    International Footprint – Marquee Jobs Stadium at Barbados Salalah Airport, Oman Twin Towers, Dubai Marina NMC Speciality hospital, Abu Dhabi Bhukara Hotel, Uzbeckistan World’s Longest Conveyer, Bangladesh Bulk Cement Terminal, Colombo Fabrication Facility, Oman Punatsangchhu HEP, Bhutan Sheikh Khal

  14. Slide 14: Value creating Integrated Business Model

    Slide 14: Value creating Integrated Business Model

    Value creating Integrated Business Model Engineering Manufacturing Construction Projects Technology Financial Services

  15. Slide 15: E&C Delivery Platform

    Slide 15: E&C Delivery Platform

    E&C Delivery Platform One of Asia’s largest vertically integrated E&C Companies Design & Engineering EPC PROJECTS Construction Manufacture & Fabrication Single point responsibility for turnkey solutions Engineering Manufacturing Construction Projects Technology Financial Services

  16. Slide 16: Quality Customer Mix

    Slide 16: Quality Customer Mix

    Quality Customer Mix Indian Coastguard Engineering Manufacturing Construction Projects Technology Financial Services Engineering Engineering Manufacturing Manufacturing Construction Construction Projects Projects Technology Technology Financial Financial Services Services

  17. Slide 17: Multiple Alliances & Joint Ventures

    Slide 17: Multiple Alliances & Joint Ventures

    Multiple Alliances & Joint Ventures Alliances Pre Qualifications Joint Ventures Befula Investments Note: Some of these are project specific alliances & pre qualifications Engineering Manufacturing Engineering Manufacturing Construction Construction Projects Projects Technology Technology Financial S

  18. Slide 18: L&T’s Business Structure

    Slide 18: L&T’s Business Structure

    L&T’s Business Structure LARSEN & TOUBRO LTD. Business verticals Subsidiaries, JVs & Associates Buildings & Factories L&T Hydrocarbon Engineering Transportation Infrastructure Financial Services Heavy Civil Infrastructure IT & Technology Services Water & Effluent Treatment Infrastructure SPVs (BOTs)

  19. Slide 19: Group Performance

    Slide 19: Group Performance

    Group Performance Engineering Manufacturing Construction Projects Technology Technology Financial Services Financial Services 19

  20. Slide 20: Performance Highlights – Q3 FY20

    Slide 20: Performance Highlights – Q3 FY20

    Performance Highlights – Q3 FY20 Order Inflow +2% PAT Order Book +15% +9% EBITDA Revenue +10% +6% Engineering Manufacturing Construction Projects Technology Financial Services 20

  21. Slide 21: Key Financial Indicators

    Slide 21: Key Financial Indicators

    Key Financial Indicators (Amount in ₹ bn) Q3 FY19 Q3 FY20 % Var Particulars 9M FY19 9M FY20 % Var 406 416 2% Order Inflow 1157 1286 11% Order Book 2812 3063 9% 342 362 6% Revenue 919 1012 10% 38 41 10% EBITDA 101 112 12% 20 24 15% PAT 55 64 16% Net Working Capital 19.6% 23.5% RONW (TTM) (%) 15.7% 15

  22. Slide 22: Q3/9M FY20 Order Inflow/Order Book

    Slide 22: Q3/9M FY20 Order Inflow/Order Book

    Q3/9M FY20 Order Inflow/Order Book (Amount in ₹ bn) Order Inflow Order Book 2% 11% 9% 9M FY20 Q3 FY19 Q3 FY20 575 726 237 179 416 850 436 1286 2812 3063 9M FY19 298 109 879 278 1157 2237 2337 406 9M FY19 9M FY20 Domestic International • Growth in Order Inflows in Q3 and 9M is largely driven by Inter

  23. Slide 23: Group Performance – Sales & Costs

    Slide 23: Group Performance – Sales & Costs

    Group Performance – Sales & Costs Q3 Q3 9M 9M % Var Rs Billion % Var FY19 FY20 FY19 FY20 • Q3 revenue growth driven by Hydrocarbon and IT&TS 342.3 362.4 6% Revenue 919.2 1012.1 10% businesses 32% 36% 4% International Rev. 33% 34% 1% • Fin charge opex represents 225.4 218.5 -3% MCO Exp. 582.2 606.5 4

  24. Slide 24: Group Performance – Profit Stack

    Slide 24: Group Performance – Profit Stack

    Group Performance – Profit Stack Q3 Q3 9M 9M % Var Rs Billion % Var FY19 FY20 FY19 FY20 37.5 41.2 10% EBITDA 100.5 112.1 12% • Finance cost commensurate with debt levels and phased (5.3) (7.1) 33% Fin. Cost (13.0) (19.8) 53% commencement of Hyd. Metro (4.1) (6.6) 63% Depreciation (14.9) (17.5) 18% •

  25. Slide 25: Segment Performance Analysis

    Slide 25: Segment Performance Analysis

    Segment Performance Analysis Engineering Manufacturing Engineering Manufacturing Construction Construction Projects Projects Technology Technology Financial Financial Services Services

  26. Slide 26: Segment Composition

    Slide 26: Segment Composition

    Segment Composition Heavy Defence Hydrocarbon Infrastructure Power Engineering Engineering Buildings & Factories (B&F) EPC- Coal & Gas Process Plant Equipment Defence Onshore Transportation Infra (TI) Thermal Power Plant Nuclear Power Plant Aerospace Offshore Heavy Civil infra (HC) Construction Equi

  27. Slide 27: 9M FY20 Order Inflow Composition

    Slide 27: 9M FY20 Order Inflow Composition

    9M FY20 Order Inflow Composition Others ROW 3% 9% USA & Europe 11% Infrastructure Services 48% 24% Middle East 14% Hydrocarbon 14% Domestic Defence 66% Engineering HE Power 1% 1% 9% Order Inflow Rs 1286 Bn Engineering Manufacturing Construction Projects Technology Financial Services 27

  28. Slide 28: 9M FY20 Order Book Composition

    Slide 28: 9M FY20 Order Book Composition

    9M FY20 Order Book Composition Hydrocarbon ROW Others USA & 10% 15% 2% Europe 1% Defence Engineering 3% Middle East HE 13% 1% Power 6% Infrastructure Domestic 73% 76% Order Book Rs 3063 Bn Engineering Manufacturing Construction Projects Technology Financial Services 28

  29. Slide 29: 9M FY20 Revenue Composition

    Slide 29: 9M FY20 Revenue Composition

    9M FY20 Revenue Composition ROW Others USA & Europe 6% 4% Infrastructure 14% 47% Services 30% Middle East 14% Hydrocarbon 12% Domestic Defence 66% Engineering HE Power 3% 2% 2% Revenue Rs 1012 Bn Engineering Manufacturing Construction Projects Technology Financial Services 29

  30. Slide 30: Infrastructure Segment

    Slide 30: Infrastructure Segment

    Infrastructure Segment (Amount in ₹ bn) Net Revenue -5% Net Revenue 5% 182.1 172.5 47.7 43.1 134.4 129.4 9M FY19 9M FY20 Q3 FY19 Q3 FY20 5.4% EBITDA Margin 6.1% 6.3% EBITDA Margin 6.5% Domestic International • International business drives order inflows in Q3 • Muted revenues in Q3 arising out of ex

  31. Slide 31: Power Segment

    Slide 31: Power Segment

    Power Segment (Amount in ₹ bn) Net Revenue -23% Net Revenue -43% 9.1 6.9 3.8 0.9 5.3 6.0 9M FY19 9M FY20 Q3 FY19 Q3 FY20 2.9% EBITDA Margin 3.4% 4.4% EBITDA Margin 3.6% Domestic International • Strong order inflows in current year replenishes order book • Revenue decline reflects depleted opening or

  32. Slide 32: Heavy Engineering Segment

    Slide 32: Heavy Engineering Segment

    Heavy Engineering Segment (Amount in ₹ bn) Net Revenue 20% Net Revenue 58% 7.2 6.0 4.1 3.8 3.1 2.2 9M FY19 9M FY20 Q3 FY19 Q3 FY20 20.5% EBITDA Margin 23.5% 25.4% EBITDA Margin 22.3% Domestic International • Order Inflows in current year impacted by deferments • Strong revenue growth driven by large

  33. Slide 33: Defence Engineering Segment

    Slide 33: Defence Engineering Segment

    Defence Engineering Segment (Amount in ₹ bn) Net Revenue 6% Net Revenue 14% 10.6 10.0 0.9 0.6 9.4 9.7 Q3 FY19 Q3 FY20 9M FY19 9M FY20 9.0% EBITDA Margin 20.5% 15.2% EBITDA Margin 18.4% Domestic International • Private sector continues to await favourable policy environment • Progress on tracked arti

  34. Slide 34: Hydrocarbon Segment

    Slide 34: Hydrocarbon Segment

    Hydrocarbon Segment (Amount in ₹ bn) Net Revenue 17% Net Revenue 15% 43.9 37.6 22.3 20.6 17.0 21.6 9M FY19 9M FY20 Q3 FY19 Q3 FY20 8.2% EBITDA Margin 12.1% 8.4% EBITDA Margin 10.9% Domestic International • Significant Order Inflows obtained from domestic & international markets in current year • Str

  35. Slide 35: Developmental Projects Segment

    Slide 35: Developmental Projects Segment

    Developmental Projects Segment (Amount in ₹ bn) Net Revenue 4% Net Revenue -3% 11.9 12.4 2.3 2.3 9.6 10.1 9M FY19 9M FY20 Q3 FY19 Q3 FY20 4.2% EBITDA Margin 17.3% 14.1% EBITDA Margin 12.4% Nabha Hyd. Metro Kattupalli Port • Segment includes Power Development business, Hyderabad Metro • Revenue large

  36. Slide 36: IT & Technology Services Segment

    Slide 36: IT & Technology Services Segment

    IT & Technology Services Segment (Amount in ₹ bn) Net Revenue 65% Net Revenue 49% 60.9 19.7 37.0 13.9 13.0 24.0 27.3 9M FY19 9M FY20 Q3 FY19 Q3 FY20 22.2% EBITDA Margin 21.0% 23.7% EBITDA Margin 21.0% IT TS Mindtree • Mindtree results consolidated from Q2 FY20 • LTI revenue growth led by Manufacturi

  37. Slide 37: Others Segment

    Slide 37: Others Segment

    Others Segment (Amount in ₹ bn) Net Revenue -22% Net Revenue -10% 16.0 1.0 12.5 1.5 15.0 11.0 9M FY19 9M FY20 Q3 FY19 Q3 FY20 47.2% EBITDA Margin 21.9% 32.9% EBITDA Margin 22.5% Domestic International • Segment comprises Construction & Mining Equipment, Rubber processing Machinery, Industrial Valves

  38. Slide 38: L&T Finance Holdings Group

    Slide 38: L&T Finance Holdings Group

    L&T Finance Holdings Group Q3 FY19 Q3 FY20 % Var Rs Bn 9M FY19 9M FY20 % Var 32.6 35.5 9% Income from Operations 94.6 104.6 11% 3.9 3.8 -2% PAT (Net of NCI) 11.3 8.4 -26% Mutual Fund Average AUM 690.8 715.9 4% Net Loan Book 947.1 994.5 5% Gross Stage 3 Assets 6.7% 5.9% Net Stage 3 Assets 2.6% 2.7% N

  39. Slide 39: Electrical & Automation Segment

    Slide 39: Electrical & Automation Segment

    Electrical & Automation Segment (Amount in ₹ bn) Net Revenue -10% Net Revenue -1% 14.7 13.3 3.6 3.6 11.1 9.7 9M FY19 9M FY20 Q3 FY19 Q3 FY20 17.4% EBITDA Margin 19.3% 16.3% EBITDA Margin 18.1% Domestic International • Muted revenue arising from a soft demand environment • Margin increase reflects op

  40. Slide 40: The Environment & Outlook

    Slide 40: The Environment & Outlook

    04 The Environment & Outlook 40 Engineering Manufacturing Construction Projects Technology Financial Services

  41. Slide 41: Headwinds & Tailwinds

    Slide 41: Headwinds & Tailwinds

    Headwinds & Tailwinds Nominal GDP Growth Order Public Sector Book Investments Balance Global Sheet Outlook Growth Business Economic Portfolio Stimulus Capability Spectrum Engineering Manufacturing Construction Projects Technology Financial Services

  42. Slide 42: Thank You

    Slide 42: Thank You

    Thank You Turn overleaf for Annexures

  43. Slide 43: Segment Margin

    Slide 43: Segment Margin

    Segment Margin 9M FY20 9M FY 19 Segment (Rs Cr) Net EBITDA Net EBITDA EBITDA EBITDA Revenue % Revenue % Ex-Services business: Infrastructure Segment 47704 3110 6.5% 45564 2851 6.3% Power Segment 1739 62 3.6% 3044 133 4.4% Hydrocarbon Segment 12452 1352 10.9% 10815 906 8.4% Heavy Engineering Segment

  44. Slide 44: Balance Sheet

    Slide 44: Balance Sheet

    Balance Sheet Incr / Rs Billion Dec-19 Mar-19 (Decr) Equity & Reserves 658 624 35 Non Controlling Interest 95 68 26 Borrowings - Financial Services 928 915 13 Development Projects 195 191 4 Others 247 149 98 Sources of Funds 2,123 1,948 175 Fixed Assets 150 134 16 Intangible Assets & Investment Prop

  45. Slide 45: Cash Flow

    Slide 45: Cash Flow

    Cash Flow Q3 FY19 Q3 FY20 Rs Bn 9M FY19 9M FY20 35.3 45.6 Operating Profit 102.9 128.7 (1.8) (11.4) Changes in Working Capital (37.8) (97.0) (13.2) (9.4) Direct Taxes paid (35.6) (31.0) 20.3 24.9 Net Cash from Operations (A) 29.6 0.7 (10.4) (9.0) Net Investment in Fixed Assets (incl. Intangible) (24

  46. Slide 46: Share in Profit/(Loss) of JVs/Associates

    Slide 46: Share in Profit/(Loss) of JVs/Associates

    Share in Profit/(Loss) of JVs/Associates Q3 FY19 Q3 FY20 Rs Bn 9M FY19 9M FY20 0.32 0.43 MHPS JVs 1.13 1.35 (0.59) 0.47 IDPL & Subs. 1.08 (1.19) (0.37) (0.30) Special Steels and Heavy Forgings (1.08) (1.03) 0.08 (0.12) Others (0.06) 0.11 (0.56) 0.48 Total 1.06 (0.75) Engineering Manufacturing Constr

  47. Slide 47: Concessions Business Portfolio – 14 SPVs

    Slide 47: Concessions Business Portfolio – 14 SPVs

    Concessions Business Portfolio – 14 SPVs Roads and Bridges Transmission Lines Metros Power (Excl. Projects under DPR) Portfolio: Portfolio: Portfolio: Portfolio: 10 projects (1048 Km) 1 project (482 Km) 1 project (71.16 Km) 2 projects (1499 MW) 10 Operational - Operational – Under-implementation 1 O

  48. Slide 48: Major Opportunities

    Slide 48: Major Opportunities

    Major Opportunities Roads & Highways Railways Water National & State Highways Metro Railways Water transmission & distribution Expressways High speed Rail Lift Irrigation schemes Special Bridges Track laying / Track modernization for Water Treatment (Incl. Desal) Tunnels conventional railways Efflue