Nautilus Minerals Inc. · OTC:NUSMF

Nautilus Minerals — Investor Presentation (August 2014)

13 slides from Nautilus Minerals's investor presentation, Aug 12, 2014

  1. Slide 1: Nautilus Minerals Investor Update

    Nautilus Minerals Investor Update August 12, 2014 Month 2014 1

  2. Slide 2: Disclaimer and Legal Notice

    Disclaimer and Legal g Notice  This Presentation may contain forward-looking statements within the meaning of the United States Securities Exchange Act of 1934 and forward-looking information within the meaning of applicable Canadian securities law.  Material forward-looking statements and forward

  3. Slide 3: Q2 Highlights

    Q2 Highlights  Cash US$36 million (as of June 30, 2014) AC assembly  Agreement signed with the Independent State of Papua New Guinea on April 24, 2014 – US$7 million non refundable deposit – US$113 million in escrow (May 9th)  Bulk Cutter fully assembled CM chassis  Collecting Machine and Auxili

  4. Slide 4: Agreement with the Independent State of Papua New Guinea

    Agreement with the Independent State of Papua New Guinea (the “State”) State )  The State has taken a 15% interest in the Project (for (f a total t t l costt to t production of US$120 million)  The State has p paid Nautilus a non- refundable deposit for its initial 15% interest of US$7,000,000  R

  5. Slide 5: Condition Precedent - Intellectual Property

    Condition Precedent - Intellectual Property p y  One of the conditions precedent to completion under the Mi i E Mining Equity it A Agreementt (MEA) with ith the th State St t off PNG is i that Nautilus must secure for the State certain intellectual property rights relating to Nautilus’ Nautilus sea

  6. Slide 6: Condition Precedent – Vessel Arrangement

    Condition Precedent – Vessel Arrangement  Vessel – remains the critical path for the Project – Evaluation of tenders received from shipyards experienced in building offshore construction vessels is on track – In discussions with potential vessel partners – Vessel solution to be in place before end

  7. Slide 7: Production Support Vessel – current status

    Production Support pp Vessel – current status  Basic design completed with ith preliminary li i ABS^ approval  Vessel is designed for use 1. Ship Yard Base Scope in offshore construction and seafloor mining  Sufficient storage capacity for 7-10 days y pproduction 2. Vessel on Delivery  Much of t

  8. Slide 8: Current status of Seafloor Equipment build

    Current status of Seafloor Equipment q p build  Seafloor Production Tools (SPTs) assembly – Bulk Cutter completed April 2014 – Collecting Machine commenced May 2014 – Auxiliary A ili C Cutter tt commenced d JJune 2014 – AC and CM assembly to be completed by Q1 2015  Ri Riser system: t >50% complet

  9. Slide 9: Ore Sales Agreement Tongling

    Ore Sales Agreement g Tongling g g  Tongling - largest importer of copper concentrates into China  Binding ore sales Heads of Agreement - remains in place – 1.1mtpa (+- 20%) for 3 years – Nested copper concentrate and SMS-tolling - pricing arrangement – Prompt payment - 90% provisional payment on

  10. Slide 10: MOU signed with East New Britain

    MOU signed g with East New Britain  Memorandum of Understanding (MOU) recently signed with East New Britain(ENB)  MOU provides a framework for on- going cooperation between the Provincial Government and Nautilus Minerals to achieve mutually b beneficial fi i l outputs t t  Strengthens dialogue be

  11. Slide 11: Milestones

    Milestones Milestones achieved Expected date of Status completion p Auxiliary Cutter chassis and Collecting Machine June 2014 chassis to arrive at SMD facility to commence assembly Factory Acceptance Testing on Bulk Cutter to July 2014 commence Receive the State’s State s full capital contribution i

  12. Slide 12: Forward Plan

    Forward Plan  Satisfy Nautilus’ Conditions Precedent  Move forward f with the Solwara S 1 Project – Accelerate equipment build – Secure vessel solution – Ensure continued government and community support  Maintain licences and permits  Accelerate A l t development d l t off additional dditi l as

  13. Slide 13: Mike Johnston, President and CEO

    Mike Johnston President and CEO [email protected] www.nautilusminerals.com www.cares.nautilusminerals.com Month 2013 13

Nautilus Minerals — Investor Presentation (August 2014) on 6ix