Wa Gold — Brazilian Metals Group — Investor Presentation (June 2012)
17 slides from Wa Gold's investor presentation, June 2012
Slide 1: Investor Presentation
Brazilian Metals Group Investor Presentation June 2012 ASX: BMG
Slide 2: BMG Investment Case
BMG INVESTMENT CASE ATTRACTIVE VALUE PROPOSITION ASX listing with exposure to Brazilian iron ore sector Brazilian operating and capital costs for iron ore production are relatively low Presence of domestic market and existing infrastructure lowers the barriers to commencing production Attrac
Slide 3: Brazil: Attractive Destination for Resources Investment
BRAZIL ATTRACTIVE DESTINATION FOR RESOURCES INVESTMENT World class iron ore province in Minas Gerais, with established steel industry Accounts for up to 70% of Brazil’s iron ore production – c.390mt in 2011 RIO PARDO 2011 steel production of c.35mt Stable political system, secure tenure, low
Slide 4: BMG Project Locations
BMG PROJECT LOCATIONS MG, BRAZIL Existing and proposed 500km rail infrastructure in Minas Gerais (MG) and Porto Sul, Ilheus Bahia (BA) Gema Verde Rio Pardo (460mt) (2-3bnt)* Northern FIOL Rail Minas Gerais Carrapato (50-60mt)* Iron MRS Rail Quadrilateral FIOL Rail to Porto Sul, Ilheus under construc
Slide 5: Carrapato Project Location
CARRAPATO PROJECT LOCATION SURROUNDED BY LARGE DOMESTIC STEEL INDUSTRY Significant steel production in the „Iron Quadrilateral‟ region in close proximity to Domestic Steel Mills Carrapato Established steel industry provides large market for local iron ore sales Domestic iron ore consumption in
Slide 6: Carrapato Iron Ore Project: Geological Setting
CARRAPATO IRON ORE PROJECT GEOLOGICAL SETTING Iron deposits hosted by Caue QUADRILÁTERO FERRÍFERO Formation and Gandarela IRON QUADRILATERAL Formation – both itabiritic • canga & detritals 65-67% Fe ARCELOR MITTAL • soft haematite, 65-76% Fe Belo Horizonte Carrapato • hard 67% grade haematite, • fri
Slide 7: Carrapato Iron Ore Project: Project Location
CARRAPATO IRON ORE PROJECT PROJECT LOCATION Iron Quadrilateral within existing mining corridor; close proximity to transport infrastructure and domestic steel mills Vale operating two mines in the Carrapato area - Corrego do Feijao (6.8mtpa) and Jungada Carrapato (5.1mtpa) − Both have stated res
Slide 8: Carrapato Iron Ore Project: Extensively Drilled
CARRAPATO IRON ORE PROJECT EXTENSIVELY DRILLED Stage – Advanced; Diamond Drilled – JORC planned within 2 months; Scoping numbers High Grade zone prepared; Pre-Feasibility underway ECE MINE Size – Exploration Target* of 53 to 62 mt @ 35.2% to 41.1% Fe; includes high grade surface zone of Gandarel
Slide 9: Carrapato Iron Ore Project: Development Plan
CARRAPATO IRON ORE PROJECT DEVELOPMENT PLAN Period Activities Complete JORC Resource Estimate INITIAL PHASE DSO mine design and preliminary feasibility studies (4 – 5 months) Environmental Report and Plan of Economic Action underway Domestic off-take agreements and landowner engagement under
Slide 10: Potential Scoping Level Economics
CARRAPATO IRON ORE PROJECT POTENTIAL SCOPING LEVEL ECONOMICS Contract mining, third party infrastructure and toll treatment will be used where possible, with multiple options within the region, to minimise capex and fund operations from cashflow Scoping Study to be undertaken to validate managem
Slide 11: Favourable Acquisition Terms
CARRAPATO IRON ORE PROJECT FAVOURABLE ACQUISITION TERMS Exclusive agreement to acquire 100% of the project, subject to due diligence and final documentation Documentation expected to be completed within 3-4 months Acquisition price of US$38m (circa US$29m on an NPV basis) with payment terms al
Slide 12: BMG Peer Comparison
BMG PEER COMPARISON FAVOURABLE COMPARATIVE METRICS IN AN ESTABLISHED NICHE SECTOR BMG SAFM Centaurus Ponto Carrapato1 Verde2 Jambreiro2 Expl. Target* /Resource, Mt 53 – 62* 230.6 116.5 Grade, Fe ~ 40%* 44.5% 26.8% Mass Recovery ~ 50%* 45%-60% 35%-37% Final Product, Mt 21 – 25* ~ 47 - 504 173 Product
Slide 13: BMG's Northern MG Projects
BMG’S NORTHERN MG PROJECTS MEDIUM TO LONG TERM GROWTH HORIZON Gema Verde resource of 460 Mt to JORC standard - >85% BMG Rio Pardo Measured and Indicated 2-3Bt Contiguous with Honbridge Block 8 (2.6Bt resource) Rio Pardo Exploration Target* of 2 to 3 Bt based on 28 drill holes VALE Nova Aurora
Slide 14: Capital Structure
CAPITAL STRUCTURE ASX Codes: BMG/ BMGO Ordinary Shares* on Issue: 148 Million Tradeable Options: 137 Million (ex at 20c until 31/03/2014) Share Price: $0.03 (as at 30 May 2012) Market Capitalisation: ~$5m Cash: $0.57m (as at 31 March 2012) Debt: Nil *Escrowed Shares: 72.2 Million 14
Slide 15: Directors
DIRECTORS Mr. Peter O'Connor – Chairman MA Economics and Political Science, Trinity College, Dublin; called to the Irish Bar, King‟s Inns, Dublin (1964) Mr O'Connor has over 40 years experience in international investment management, and is chairman of a number of publicly quoted investment companie
Slide 16: Directors
DIRECTORS Mr. Anthony Augustine Trevisan – Non-Executive Director Mr Trevisan has over 30 years corporate experience in the establishment and management of companies, equity and debt financings, mergers and acquisitions, restructuring of mineral resources, petroleum and property based public compani
Slide 17: Disclaimers
DISCLAIMERS Exploration Results and Mineral Resources The information in this report that relates to Exploration Results, Exploration Targets, Mineral Resources or Ore Reserves is based on information compiled by Malcolm Castle, who is a Member of the Australasian Institute of Mining and Metallurgy
Brazilian Metals Group — Investor Presentation (June 2012) on 6ix