Stronghold Digital Mining Inc

Stronghold Digital Mining — Investor Presentation (September 2022)

10 slides from Stronghold Digital Mining's investor presentation, Sep 13, 2022

  1. Slide 1: Stronghold Investor Presentation September 2022

    Slide 1: Stronghold Investor Presentation September 2022

    Pictured: Actual Reclaimed Waste Coal Site in Russellton, PA Stronghold Investor Presentation September 2022

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer The information, financial projections and other estimates contained herein contain “forward-looking” statements as that term is defined in Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended by the Private Securities L

  3. Slide 3: Stronghold's Differentiated Business Model

    Slide 3: Stronghold's Differentiated Business Model

    Stronghold’s Differentiated Business Model 3 The value of vertical integration 1 Own and Operate Power Generation Assets ➢ Maximizes efficiency and reduces costs ➢ Provides downside protection and ability to sell to grid (improving grid stability) ➢ Currently similar or better economics selling powe

  4. Slide 4: Stronghold's Power Assets

    Slide 4: Stronghold's Power Assets

    Stronghold’s Power Assets 4 Own and operate two power generation assets 2 1 Scrubgrass Reclamation Facility ➢ 85 MW specialized waste coal reclamation plant ➢ Established maximum achievable control technology standards ➢ Capacity for >20,000 miners with ~2 EH/s 1 2 Panther Creek Reclamation Facility

  5. Slide 5: Datacenter Manufacturing, Development, and Management

    Slide 5: Datacenter Manufacturing, Development, and Management

    Datacenter Manufacturing, Development, and Management ➢ ~100 MW of modular datacenter containers constructed and installed ➢ Helps reduce costs and mitigate impact of supply-chain constraints 5 StrongBox Manufacturing Development and Management ➢ Increases operational control and accelerates hashing

  6. Slide 6: ESG Leader through Coal Refuse Reclamation

    Slide 6: ESG Leader through Coal Refuse Reclamation

    ESG Leader through Coal Refuse Reclamation 6 Before AfterReclamation Process ~840 piles with potentially billions of tons of coal refuse Stronghold has already reclaimed ~1,000 acres of previously unusable land Eliminate coal refuse from environment with each Bitcoin mined 1. Remove coal refuse from

  7. Slide 7: Recap of Recent Deleveraging Transactions: What We Did

    Slide 7: Recap of Recent Deleveraging Transactions: What We Did

    Recap of Recent Deleveraging Transactions: What We Did ➢ Strategically approached NYDIG to restructure equipment financing in July given decline in collateral value ➢ Eliminated ~$67.4mm of outstanding principal in exchange for returning NYDIG-financed miners (~2.5 EH/s of YE 2022E hash rate capacit

  8. Slide 8: Recap of Recent Deleveraging Transactions: Why We Did It

    Slide 8: Recap of Recent Deleveraging Transactions: Why We Did It

    Recap of Recent Deleveraging Transactions: Why We Did It Shift value from debt to equity ➢ Eliminating ~$67mm of debt in exchange for assets with estimated market value of ~$40-50mm ▪ Effectively transferring ~$17-27mm of value to shareholders Enhance capital structure ➢ ~$79mm reduction in principa

  9. Slide 9: Path to Generate Improved Shareholder Value

    Slide 9: Path to Generate Improved Shareholder Value

    Path to Generate Improved Shareholder Value 9 1. Revenue range for miners based on a Bitcoin price range of $17,500 to $22,500 and a 225 EH/s network hash rate 2. Average of around-the-clock forward prices for the Penelec and PPL PJM zones, per Priority Power as of 9/9/22 Take advantage of historica

  10. Slide 10: Path to Generate Improved Shareholder Value (cont.)

    Slide 10: Path to Generate Improved Shareholder Value (cont.)

    Path to Generate Improved Shareholder Value (cont.) 101. Reflects Company’s go-forward plans Reduce cost structure and optimize plant operations Breakdown of Expected Cash Savings ➢ Nearing completion of Scrubgrass investment cycle ➢ Expect both plants to be down 1-2 weeks in late September / early

Source: SEC EDGAR · 8-K filed Sep 13, 2022