Slide 1: In the kNOW Webinar: Water Utility Resilience + COVID-19 Response
In the kNOW Webinar Water Utility Resilience + COVID-19 Response June 2, 2020
Slide 2: Welcome & Introductions
Welcome & Introductions Why this issue is Important Adam Hosking, Jacobs, Vice President, Global Director for Water Resources Incorporating Climate Resilience Planning into Asset Management Rob Taylor, Energy Manager, WSSC Water Laurens van der Tak, PE, D. WRE, Jacobs, Technology Fellow | Wate
Slide 3: Defining Resilience
Defining Resilience… Resilience is the ability to anticipate and resist the effects of a disruptive event or trend, minimise adverse impacts, respond effectively, maintain or recover functionality, and adapt in a way that allows for learning and thriving. 3 ©Jacobs 2020
Slide 4: Water Utility Resilience
Water Utility Resilience Disruptive events Minimize impacts Adapt, learn & trends and thrive Adaptive actions Pandemic Recognise the Continuity of Climate change opportunity operations plans Cyber attack ‘Build back better’ Response and recovery Aging infrastructure Share learnin
Slide 5: Where are We Now? What's Next?
Where are We Now? What’s Next? Build Back Anticipate Resist Absorb Adapt Better Shock or other disruptive event Resilient utilities use shocks and disruptions to transform themselves, so that they thrive and “build back better” Anticipate Resist Absorb Adapt High resilience Current baseline level of
Slide 6: Incorporating Climate Resilience Planning into Asset Management
Incorporating Climate Resilience Planning into Asset Management : WSSC Water’s Climate Change Vulnerability Assessment, Adaptation and Mitigation Plan Robert Taylor/WSSC Water Laurens van der Tak/Jacobs
Slide 7: WSSC Water Service Area (Maryland)
WSSC Water Service Area (Maryland) One of the largest water/wastewater utilities in the nation Serves 1.8 million customers in Maryland’s Montgomery and Prince George’s Counties Founded in 1918 -102 years! Provides 170 MGD drinking water Collects 200 MGD wastewater Treats 70 MGD wastewat
Slide 8: Climate Change Vulnerability Assessment, Adaptation, and Mitigation Planning Project
Climate Change Vulnerability Assessment, Adaptation, and Mitigation Planning (CCVAAMP) Project Climate Analysis & Projections Vulnerability Assessment Adaptation Analysis Mitigation Planning (GHG Inventory and Action Plan) 1 2 3 4 5 6 Develop Climate Identify Develop Adaptation Plan Adaptati
Slide 9: Climate Analysis and Projections
Climate Analysis and Projections ©Jacobs 2020
Slide 10: Climate Change Impacts Rainfall, Extreme Storms and Sea-Level Rise
Climate Change Impacts Rainfall, Extreme Storms and Sea-Level Rise Precipitation - Driven Coastal Stormwater/ Riverine Sea-level rise Storm surge Drainage 2- to 10-year storms 100-year storms Tidal flooding Tropical storms Localized flooding Recurrent flooding from Regional flooding Coastal flooding
Slide 11: Climate Projections for WSSC Water Service Area (100 yr. storm)
Climate Projections for WSSC Water Service Area (100 yr. storm) 24-hour rainfall depth projected to increase 15% by 2065 2065 12 10.6 Current 10 9.7 9.2 2040 8.4 2065 8 Precipitation (Inches) 2100 6 4 0 100-year 24-hr Storm 11 ©Jacobs 2020
Slide 12: Sea-Level Rise Projections for WSSC Water Service Area
Sea-Level Rise Projections for WSSC Water Service Area: High Tide (MHHW) projected to increase from 2.0 ft to 4.0 f in 2065 7.0 4.0-ft 6.5 6.0 2065 5.5 Observed Monthly Mean Higher High Water 5.0 4.0-ft Precipitation (Inches) 4.5 Projected MHHW 4.0 2.9-ft 3.5 3.0 2.0-ft 2.5 2.0 1.5 Mean Higher Hig
Slide 13: Facility Vulnerability Assessments and Adaptation Planning
Facility Vulnerability Assessments and Adaptation Planning ©Jacobs 2020
Slide 14: Flood Modeling Completed for Riverine and Coastal Facilities
Flood Modeling Completed for Riverine and Coastal Facilities Riverine: Above the Fall Line / Rainfall modeled with HEC-RAS Geologic “Fall Line” between Piedmont and Coastal Plain geologic provinces Coastal: Below the Fall Line, Storm Surge and SLR Modeled with MIKE21 14 ©Jacobs 2020
Slide 15: Water and Wastewater Facilities Investigated to Date for WSSC Water
Water and Wastewater Facilities Investigated to Date for WSSC Water Anacostia WWPS #1 Air Park WPS Anacostia WWPS #2 Decatur Street WWPS 200 + Facilities in GIS Broad Creek WWPS Hyattstown WRRF Riverine Coastal Western Branch WRRF Marlboro Meadows WWPS Hyattsville WWPS Parkway WRRF Facilities locate
Slide 16: Risk Assessment / Alternatives Development
Risk Assessment / Alternatives Development -Major assets located below new Design Flood Elevation 1. Identify all assets at risk below Flooding Scenarios Assets at Risk recommended design flood 190’ elevation (DFE). 185’ Flood Elevations 2. Determine Level of Service (LOS) 2065 Design 180’ of all as
Slide 17: Cumulative Risk Avoided Accounts for Climate Change
Cumulative Risk Avoided Accounts for Climate Change Over the Expected Life of Each Asset !"! = # !$% Annual Risk Avoided = Probability of Rlood event in given year ∗ Asset Replacement Cost ∗ 1−Strategy Failure Potential $48,000 $45,000 Includes: Increasing probability of floods from now to 2040 $4
Slide 18: Adaptation Strategies for Treatment Facilities and Pump Stations
Adaptation Strategies for Treatment Facilities and Pump Stations Strategy Resiliency Level No Action No Protection Sandbagging Low Temporary Barriers Moderate Seal Building/ Moderate/ Medium Control Room Construct Static High Barrier Flood-proof High Equipment Elevate Equipment Very High 18 ©Jacobs
Slide 19: Compare Strategy Costs to Cumulative Risk Avoided
Compare Strategy Costs to Cumulative Assets at Risk and Area Level Strategies All Assets At Risk Building/Area Cost of Cumulative Risk Quantity Strategy Costs Replacement Avoided Electrical Yard 7 $5,510,000 $452,000* $1,070,000 Costs < Generator Building 5 $20,520,000 $300,000 $390,000 Risks Pump S
Slide 20: CCVAAMP Vulnerability Assessment Results: Priority Ranking by Risk
CCVAAMP Vulnerability Assessment Results Priority Ranking Based On Risk Alone $1,600,000 $16,000,000 Facility Ranked by Cumulative Risk Avoided (Benefits = Avoided Asset Damage for All Assets) $1,400,000 $14,000,000 Cumulative Risk to All Assets $1,200,000 $12,000,000 Strategy Cost $1,000,000 $10,00
Slide 21: CCVAAMP Vulnerability Assessment Results: Return on Investment
CCVAAMP Vulnerability Assessment Results Priority Ranking Based Return on Investment: $ Net Return per $ Invested in Resilience $1,600,000 Facility Ranked by Return on Investment 140.0 (Net Return/Cost) $1,400,000 120.0 $ Net Return per $ Invested $1,200,000 100.0 Strategy Cost ($) Strategy Cost $1,
Slide 22: Design Guide for Protecting Facilities from Future Climate Extremes
Design Guide for Protecting Facilities from Future Climate Extremes Guidance for flood protection criteria − Criteria for design of new facilities and protection of existing facilities − Outfall tailwater design elevations for treatment process − Site stormwater design guidance based on climate pr
Slide 23: Greenhouse Gas Reduction (Mitigation) Progress
Greenhouse Gas Reduction (Mitigation) Progress ©Jacobs 2020
Slide 24: What a GHG inventory includes
What a GHG inventory includes… PFCs SCOPE 1 direct SCOPE 2 SCOPE 3 indirect indirect company production pf employee owned purchased business waste vehicles materials travel disposal fuel combustion purchased electricity product outsourced contractor for own use use activities owned vehicles 24 ©Jaco
Slide 25: GHG Emissions Impacts of Current Projects
GHG Emissions Impacts of Current Projects (tonnes CO2e/Yr) Patuxent Solids (2019) 200 Patuxent UV (2019) 1,100 Increased Patuxent Production (20 MGD) (2019) -2,700 Rocky Gorge Pump and Force Main (2020) -100 HVAC/Lighting Upgrades (2019) -2,600 Office Equipment (2019) -100 Telecommuting (ongoing) -2
Slide 26: GHG Emissions Reductions (Goal: 60% reduction by 2035)
GHG Emissions Reductions (Goal: 60% reduction by 2035) WSSC Emissions Projections (2005 - 2035) Impact of Project, Strategies, Wind Contract and RECs vs. WSSC Water Goal 200,000 150,000 GHG Emissions (tonnes CO2e/yr) 100,000 50,000 0 -50,000 -100,000 -150,000 2005 2006 2007 2008 2009 2010 2011 2012
Slide 27: Your turn: Poll Question #1
Your turn… Poll Question #1 27 ©Jacobs 2020
Slide 28: Applying Resilience Strategy and Tools to COVID-19 Response
Applying Resilience Strategy and Tools to COVID-19 Response Richard Windsor, Richard Windsor, Asset Management Lead, TEAM2100, UK Scott Haskins, Jacobs, Water Market Lead, Strategic Consulting
Slide 29: TEAM2100 Overview Description and Purpose
TEAM2100 Overview Description and Purpose Our Pathfinder Our Vision Our Values Mission Principles To increase the resilience of What we are Be a world-class asset communities, wildlife and Integrated, Collaborative and management enterprise business within London and Innovative the Thames Estuary th
Slide 30: TEAM2100 Overview Description and Purpose
TEAM2100 Overview Description and Purpose 2100 Plan Delivering the Thames Estuary UK’s largest single flood risk programme of works, Environment Agency; one of worth over £300m Pathfinder Project for the The need Our assets The value from our assets What we do Environment Agency River flows
Slide 31: What Does the System Protect?
TEAM2100 Overview Description and Purpose What Does the System Protect? People & Property Industry Infrastructure 1.3 million residents 40,000 commercial and 400 schools industrial properties Over 500,000 homes 16 hospitals £275 bn 8 power stations property value Habitat More than 10
Slide 32: TEAM2100 Continual Improvement and Resilience
TEAM2100 Continual Improvement and Resilience Continuous Improvement Act Plan Check Do Business Strategies Continuous Improvement Act Plan Emergency UAIM Lean Improvement preparedness Performance Check Do Maintenance Excellence ISO Re-Certification Act Plan Innovation ISO 55001 Check Do WSAA Org
Slide 33: The 'new normal' challenges in the COVID-19 Pandemic
Continual Improvement and Resilience The ‘new normal’ challenges in the COVID-19 Pandemic A new focus on emergency operations and teleworking Depressed economy and business function Pressure from customers to be more sensitive to costs and affordability Need to optimize and fund capital proj
Slide 34: Identifying Adaptive and Resilient Solutions
Continual Improvement and Resilience Identifying Adaptive and Resilient Solutions Deploying proven approaches: strategic planning, decision analysis, financial forecasting, asset management/maintenance, and risk management increases the likelihood of your organization’s ability to adapt. TEAM210
Slide 35: Recovery Will Occur Over a Range of Timeliness
Recovery Will Occur Over a Range of Timeliness and Support Continuity of Operations This Week Next Month Next Quarter Recovery Business Continuity Prioritize OPEX/CAPEX Continuity Contingency Planning Transition Planning Performance Analytics Optimizing/ Review Timetables & Scheduling Resilience Del
Slide 36: Scenario Planning Helps Define COVID-19 Response Strategies
Continual Improvement and Resilience Scenario Planning Helps Define COVID-19 Response Strategies External drivers Flattening the Curve Midrange Laissez Faire Market uncertainties result in unclear Less complete early results and More suport for companies to generate Access to Capital interest rates
Slide 37: Applying Tools and Strategies
Applying Tools and Strategies Proven Approaches & Tools Help Manage the New Risks Approaches that can help make informed decisions amid current uncertainty include: Short-term and long-term demand Strategic planning and financial forecasting Systems for financial planning and Scenario planning deliv
Slide 38: Industry Collaboration - Organizational and Asset Management Benchmarking
Industry Collaboration - Organizational and Asset Management Benchmarking Focus Areas: Strategy & Planning Facilitated Workshop Finance & Decision-Making Pre- Organizational Report Life Cycle Delivery Workshop Meeting Industry Report Information & Systems Reporting Leading Practice Con
Slide 39: Industry Collaboration - Organizational and Asset Management Benchmarking
Industry Collaboration – Organizational and Asset Management Benchmarking Organizational Process Benchmarking Value proposition for Clients Enabling Business and Customer Value Demonstrate to customers and regulators that utilities through better Asset Management are effective and efficient. Con
Slide 40: Industry Collaboration - Business Process Improvements
Industry Collaboration- Business Process Improvements Utility Analysis and Improvement Methodology Business Processes Describes Major Features Who is involved in the business process LEAN Six Sigma (swim lanes) 19 participating utilities Research and Develop “To Be” processes for: Work flow (seq
Slide 41: Industry Collaboration - Maintenance Excellence
Industry Collaboration - Maintenance Excellence The UPTIME ELEMENTS Framework by ReliabilityWeb is an Industry Framework TEAM2100 Training & Networking Peer Conferences Maintenance Excellence Maturity Assessment Chartering OR Implementation Plans 9 8 7 MP 6 DB 5 4 3 2 1 0 IM TEAM2100 Avera
Slide 42: TEAM2100 Maturity Assessments – Value Proposition
TEAM2100 Maturity Assessments – Value Proposition “I’ve seen it first hand. You gather up a diverse group of employees, put them in a room and allow them to discuss and ultimately score the assessment questions. Through this practice, the team gains a greater understanding of the business processes
Slide 43: Tools and Strategies Applied - Risk Management
Tools and Strategies Applied - Risk Management Risk Identification Program Risks Project Risks TEAM2100 major Operational Risks risks include: Asset Risks Securing partnership funding Risks identified during workshops in medium-term are evaluated in relation to other Risk risks; filters highest ri
Slide 44: Collaboration, Diversity, Innovation
TEAM2100 Tools and Strategies Applied – Collaboration, Diversity, Innovation Align organization, culture, tools and processes to future strategic direction Insights workshops – fostering diversity Positive challenge – ‘zones of uncomfortable discussion’ Leadership example, team empowerment S
Slide 45: TEAM2100 Results of Resilience, Tools and Strategies Applied
TEAM2100 Results of Resilience, Tools and Strategies Applied Improved decision-making (MODA, Prioritization, updated Strategic Plan, Process Improvements) Implementing AM Improvement recommendations; leading practices ISO55001 AM certified – focus on world class Over £30m of efficiencies rec
Slide 46: Your turn: Poll Question #2
Your turn… Poll Question #2 46 ©Jacobs 2020
Slide 47: Questions & Answers
Questions & Answers Or send to: [email protected]
Slide 48: PDH certificate information
A PDH certificate will be provided to those who participated in the live webinar.
Slide 49: Thank You!