Fairmount Santrol Holdings Inc

Fairmount Santrol — Corporate Update (July 2017)

14 slides from Fairmount Santrol's corporate update, Jul 24, 2017

  1. Slide 1: FMSA Kermit Presentation

    FMSA Kermit Presentation JULY 2017 Exhibit 99.2

  2. Slide 2: Forward-Looking Statements

    Forward-Looking Statements This presentation contains forward-looking statements. These statements can be identified by the use of forward-looking terminology including “will,” “may,” “believe,” “expect,” “anticipate,” “estimate,” “continue,” or other similar words. These statements discuss future e

  3. Slide 3: Core Differentiators for Long-Term Value Creation

    Commitment to People, Planet & Prosperity Technology & Innovation Broad Product Portfolio Strengthened by new Kermit, TX facility Operational Scale & Efficiencies Extensive Distribution and Unit Train Capabilities Core Differentiators for Long-Term Value Creation FAIRMOUNT SANTROL

  4. Slide 4: Market Supply / Demand Dynamics

    Market Supply / Demand Dynamics INVESTMENT THESIS FMSA’s footprint will be well-suited to meet demand for both local/regional sands in the Permian and highest quality Northern White Sand across all basins Permian basin demand expected to grow ~15-20M tons in 2018 and reach ~45-50M tons by end of 201

  5. Slide 5: FMSA Kermit Details

    Located in Winkler County, TX (Permian basin) near Kermit ~3,250 acres under lease with reserves of ~165M tons Fine mesh sand reserves (40/70 and 100 mesh), with ~75% 100 mesh Capacity of approximately 3 million annual tons of frac sand Facility expected to be in operation by beginning of Q2 2018 Ma

  6. Slide 6: FMSA Kermit Addresses Permian Sands' Known Risks

    Location has easy access to Highway 115 and other major roads Evaluating habitat in line with our legacy sustainable development principles & practices Leased acreage contains contiguous mining space Power and water easily accessible FMSA Kermit Location FMSA Kermit Location FMSA Kermit Addresses Pe

  7. Slide 7: Benefits from Expanded Capacity in Kermit

    Benefits from Expanded Capacity in Kermit

  8. Slide 8: Expands Product Offerings for Nearly Every Well Design

    High-Purity Northern White Silica Sands Precured Resin- Coated Sand Curable Resin- Coated Sand Texas Gold® Frac Sand RAW SAND Propel SSP ® RESIN-COATED SAND TRANSPORT TECHNOLOGY Regional Frac Sand Tier 2 regional sand Highest strength Increased flowback protection Highest flowback protection Increas

  9. Slide 9: Expands Capacity to Meet Growing Market Demand

    Expands Capacity to Meet Growing Market Demand FMSA KERMIT BENEFITS Lease will add approximately 165 million tons of reserves to bring company total to nearly 900 million tons, allowing for long-term organic growth Locations, grade mixes and logistics capabilities provide flexibility to meet changes

  10. Slide 10: Expands Footprint in Key Basins Through Facilities and Terminals

    Expands Footprint in Key Basins Through Facilities and Terminals FMSA Terminal FMSA Mining & Processing Unit Train Destination Unit Train Origin (Mining & Processing) Coating Operation New Kermit facility will strengthen FMSA’s position in Permian basin for tier 3 local sands FMSA KERMIT BENEFITS Ca

  11. Slide 11: Strategic Location to Serve All of Permian Basin

    Strategic Location to Serve All of Permian Basin Oil & Gas Terminals Unit Train Destination FMSA Mining & Processing Well Site New FMSA Kermit facility is well- positioned to serve both the Delaware and Midland basins Delaware Basin Midland Basin FMSA KERMIT BENEFITS

  12. Slide 12: Unique Opportunity for FMSA

    Unique Opportunity for FMSA Local Permian supply strengthens FMSA’s position by adding a low-cost, in-basin solution near the Delaware basin that complements our strong position in the Midland basin Meets key success criteria for new supply in the Permian basin including access to water, existing ro

  13. Slide 13: FMSA Kermit – Timeline for Delivery

    Q3 ‘17 Q4 ‘17 Q1 ‘18 Q2 ‘18 Lease and capital expenditures ~$70-75M Lease and capital expenditures ~$30-35M Staffing Plant Plant Construction Plant operational by beginning of Q2 2018 FMSA Kermit – Timeline for Delivery Total investment = $100M-$110M Finalized leasehold agreement Permits filed Equip

  14. Slide 14: Why Invest in FMSA?

    STRONG MARKET DRIVERS KEY LONG-TERM DIFFERENTIATORS AND VALUE CREATORS Industry Leader Well-Positioned for Growth WHY INVEST IN FMSA? Technology & innovation Broad product portfolio - strengthened by Kermit facility Operational scale & efficiencies Distribution & unit train capabilities Dynamic onsh