  1. Slide 1: KGHM Group Investor Presentation

    Slide 1: KGHM Group Investor Presentation

    KGHM Group Investor Presentation Ipopema 7th October 2021

  2. Slide 2: Cautionary Statement

    Slide 2: Cautionary Statement

    Cautionary Statement This presentation was prepared by KGHM Polska Miedź S.A. (KGHM). The presentation is strictly of an informational nature and should not be construed as containing investment advice. The users of this presentation are solely responsible for their own analysis and assessment of th

  3. Slide 3: Key information about the KGHM Group

    Slide 3: Key information about the KGHM Group

    Key information about the KGHM Group

  4. Slide 4: KGHM Group in brief

    Slide 4: KGHM Group in brief

    KGHM Group in brief One of the world’s largest producers of copper and 709 thousand tonnes A diversified portfolio of silver with 60 years of of payable copper production assets at various stages of experience in mining and by the KGHM Group in 2020, development located in mining- metallurgy (1.1% h

  5. Slide 5: A top ten copper producer and a leading Polish exporter

    Slide 5: A top ten copper producer and a leading Polish exporter

    KGHM: a top ten copper producer and a leading Polish exporter The Group has a global reach and plays a significant role on the global copper and silver markets Seventh Cu Second Ag largest largest copper silver producer producer Other KGHM Group products:  Molybdenum  Platinum  Copper  Lead  Rh

  6. Slide 6: KGHM among the biggest copper and silver producers

    Slide 6: KGHM among the biggest copper and silver producers

    KGHM among the biggest copper and silver producers1) Mined Copper production 2020 2) Silver production 2020 3) 1.73 50.3 1.26 43.5 1.18 32.8 1.11 27.8 1.00 24.6 0.78 21.6 0.71 21.5 0.53 18.8 0.47 17.3 0.46 [in million metric tonnes] 13.5 [million ounces] 1) KGHM results as reported in its consolidat

  7. Slide 7: A proud history of mining and metallurgy

    Slide 7: A proud history of mining and metallurgy

    A proud history of mining and metallurgy Discovery of the copper deposit brought about a fundamental change in the region’s economy thanks to the growth of KGHM Polska Miedź S.A. As a result of M&A activities, capped by the acquisition of Quadra FNX, KGHM became a truly global copper producer aimed

  8. Slide 8: Core production assets in Poland – stable output and earnings

    Slide 8: Core production assets in Poland – stable output and earnings

    Core production assets in Poland – stable output and earnings Underground copper mines, fully integrated production Legnica Smelter and Refinery Polkowice-Sieroszowice Mine LME grade A-registered cathodes 36 years LOM Capacity of ca. 120 kt electrolytic Cu/year 1)  Copper in extracted ore in 2020:

  9. Slide 9: Key international assets

    Slide 9: Key international assets

    Key international assets Existing operations and growth potential from projects Producing assets Potential growth projects Sierra Gorda (55% stake), Chile Sierra Gorda Oxide, Chile 23 years LOM 2020 production stats: 11 years LOM  Open-pit mine  Cu production  The project aims at processing the o

  10. Slide 10: Sierra Gorda

    Slide 10: Sierra Gorda

    Sierra Gorda Sierra Gorda is an open pit copper and molybdenum mine located in Chile’s Antofagasta region in the Atacama desert. Sierra Gorda is a Joint Venture of:  KGHM Polska Miedź S.A. – 55% share  Sumitomo Metal Mining – 31.5% share  Sumitomo Corporation – 13.5% share Schedule of Sierra Gord

  11. Slide 11: H1 2021 highlights - KGHM Group

    Slide 11: H1 2021 highlights - KGHM Group

    H1 2021 highlights - KGHM Group

  12. Slide 12: Payable copper production by the KGHM Group

    Slide 12: Payable copper production by the KGHM Group

    Key production highlights H1 2021 381 Payable copper production +8.6% H/H by the KGHM Group [kt] higher by 8.6% (h/h) Payable copper production Payable copper production +31% H/H  KGHM Polska Miedź: KGHM Polska Miedź [kt] Sierra Gorda1) [kt] higher production from +4.4% H/H 39 51 293 28 purchased c

  13. Slide 13: Operating results

    Slide 13: Operating results

    Operating results Production C1 cost Expenses by nature Silver production 2) Payable copper production [t] C1 – KGHM Polska Miedź S.A. – KGHM Polska Miedź S.A. [kt] -5% H/H [USD/lb] incl.the 708 676 +33% H/H 2.12 minerals extraction 1.59 tax External +8.6% H/H 1.02 0.38 Electrical services 1.21 1.10

  14. Slide 14: Key financial indicators – KGHM Group

    Slide 14: Key financial indicators – KGHM Group

    Key financial indicators – KGHM Group H1 2021 Doubled adjusted EBITDA Group adjusted EBITDA2) Group revenues [mn PLN] +32% H/H [mn PLN] for the KGHM Group +100% H/H compared to H1 2020 5 313 14 506 10 948 Higher adjusted EBITDA compared to H1 2020 7 761 5 649 (+PLN 2 662 mn; +100%), of which by segm

  15. Slide 15: Financial results

    Slide 15: Financial results

    Financial results KGHM Polska Miedź S.A. Sales revenue Adjusted EBITDA Profit for the period [mn PLN] [mn PLN] [mn PLN] +37% H/H +63% H/H +466% H/H 12 144 740 8 897 1 996 3 157 4 226 Other 830 Silver 1 524 1 931 Copper and copper 9 408 products 6 5… 747 H1 2020 H1 2021 H1 2020 H1 2021 H1 2020 H1 202

  16. Slide 16: Consistent strong performance

    Slide 16: Consistent strong performance

    Consistent strong performance KGHM Polska Miedź S.A. KGHM Polska Miedź S.A. Revenues vs EBITDA PLN mn Copper production cost vs copper price 20000 30% 26% 26% Total unit cost of electrolytic copper production from own concentrate (PLN/t) 15000 23% 22% 23% 20% 20% C1 cost of producing copper in conce

  17. Slide 17: Cash flow

    Slide 17: Cash flow

    Cash flow KGHM Group [mn PLN] +4 629 - 390 - 212 -1 710 2 522 -1 663 1 268 -1 526 - 64 - 300 - 18 Cash as at Profit/loss before Exclusion of Income tax Change in Acquisition of Proceeds Interest paid Dividend Other Cash as at 01-01-2021 income tax income and costs paid working capital property, plan

  18. Slide 18: Net debt of the KGHM Group

    Slide 18: Net debt of the KGHM Group

    Net debt of the KGHM Group As at the end of Q2 2021 Main factors affecting net debt in the first half Net debt / adjusted EBITDA -56% of 2021 compared to 30 June 2020 1.6 1.4 0.9 Increases in debt 0.8 0.7  Cash expenditures on property, plant and equipment 30-06-2020 30-09-2020 31-12-2020 31-03-202

  19. Slide 19: The financial situation of the KGHM Group remains stable and safe

    Slide 19: The financial situation of the KGHM Group remains stable and safe

    The financial situation of the KGHM Group remains stable and safe 2021 Budget Total unit production cost of electrolytic copper from own concentrate KGHM Polska Miedź S.A.1) 20.2 [k PLN/t] 19.2 Investments Capital expenditures 1 036 2 853 of KGHM Polska Miedź S.A.2) [mn PLN] Other expenditures, incl

  20. Slide 20: Capital allocation

    Slide 20: Capital allocation

    Capital allocation Renewal of dividend payout 2020 Dividend Payout Dividend policy (17% of net profit) 300 mn PLN The Dividend Policy of KGHM Polska Miedź S.A. is part of its on-going (1.50 PLN/share - gross) efforts to ensure a balance between dividends paid out to 65% shareholders and opportunitie

  21. Slide 21: Group production and sales in H1 2021

    Slide 21: Group production and sales in H1 2021

    Group production and sales in H1 2021 Execution of annual targets 2021 Budget Production Copper in concentrate [kt] 195.1 390.0 KGHM Polska Miedź S.A. Silver in concentrate [t] 640 1 200 Electrolytic copper, total [kt] 293.2 573.0 Electrolytic copper from own concentrate [kt] 192.2 385.0 Metallic si

  22. Slide 22: Market risk management – copper hedging

    Slide 22: Market risk management – copper hedging

    Market risk management Hedged position on the copper market (as at 30 June 2021) Copper Hedged position – open as at 31 Dec 2020 In the first half of 2021 the Parent Entity Hedged position implemented in H1 2021 [kt] recorded a result on derivatives* and hedges in the amount of -PLN 936 million: 69

  23. Slide 23: Market risk management – currency, silver, interest rates

    Slide 23: Market risk management – currency, silver, interest rates

    Market risk management Hedged positions on the currency, silver and interest rate markets (as at 30 June 2021) USD/PLN Hedged position – open as at 31 December 2020 In the first half of 2021 transactions were [mn USD] Hedged position implemented in H1 2021 implemented on the forward currency market:

  24. Slide 24: Capital expenditures by KGHM Polska Miedź in H1 2021

    Slide 24: Capital expenditures by KGHM Polska Miedź in H1 2021

    A rationale and responsible investment program Capital expenditures by KGHM Polska Miedź S.A. in H1 2021 CAPEX execution in H1 2021 by area by category Mining Replacement Metallurgy Maintaining mine production Other activities Development Leasing IFRS 16 Development - uncompleted 1036 29% 726 *excl.

  25. Slide 25: Role of Deep Głogów in maintaining output in Poland

    Slide 25: Role of Deep Głogów in maintaining output in Poland

    Role of Deep Głogów (GGP) in maintaining output in Poland Deposit access program in KGHM’s concessioned areas Share of production from GGP in total production Active concessions and in Poland future potential Ore extraction dry weight from GGP [kt] +5% Q2/Q1 +43% H/H 982 1 030 2 012 1 410 13.2% 13.7

  26. Slide 26: Increase in share of RES to reduce CO2 emissions by 2030

    Slide 26: Increase in share of RES to reduce CO2 emissions by 2030

    By 2030 the increase in share of RES will lead to a substantial reduction in CO2 emissions Share of power source in supplies to KGHM Polska Miedź S.A. 2019: 2020: 2019 Own generation sources covered 22.42% of KGHM’s 3 TWh total power needs in 2020 Natural Market Own source Gas (almost 1.5% more than

  27. Slide 27: The first photovoltaic power plants

    Slide 27: The first photovoltaic power plants

    The first photovoltaic power plants projects PVPP Piaskownia Obora Installed power 8 MW Projected avoided emissions Estimated production 8.5 GWh over 25 years:  CO2 more than 80 kt  SOx more than 70 tonnes  NOx more than 70 tonnes  CO more than 30 tonnes  PM more than 4 tonnes PVPP HMG I-III co

  28. Slide 28: Sustainable development

    Slide 28: Sustainable development

    Sustainable development TOE “UTURE |S MAD= OF COPPER

  29. Slide 29: COVID – It's worth getting vaccinated

    Slide 29: COVID – It's worth getting vaccinated

    COVID – consistent corporate messaging: It’s worth getting vaccinated We are effectively fighting the spread of the COVID-19 virus and fulfilling the expectations of KGHM’s employees and of society ASSISTANCE ENCOURAGEMENT VACCINATIONS In all of KGHM’s Divisions Every vaccinated employee of Vaccinat

  30. Slide 30: We produce copper responsibly

    Slide 30: We produce copper responsibly

    We produce copper responsibly Achievements in 2021:  The Głogów and Legnica smelter/refineries were certified by The Copper Mark – an international program providing a credible The granting of The Copper assurance framework to promote Mark, participation in the responsible production practices CDP

  31. Slide 31: Employee safety as a strategic priority

    Slide 31: Employee safety as a strategic priority

    Employee safety as a strategic priority for the KGHM Group H1 2021 Safety and development Accident ratios1)  ISO 45001:2018 Granting of an Occupational Health and Safety -29% Change2) in LTIFR in KGHM Polska Miedź S.A. Management System Certificate  Leader’s Gold Card of Workplace 18.6 -44% Change

  32. Slide 32: Copper - a strategic material

    Slide 32: Copper - a strategic material

    Copper - a strategic material in a carbon neutral and circular economy Metal in a circular Lower GHG emissions 22 million tonnes economy Amount needed in the years While adding 0.4% GHG, Nearly 50% of copper 2020 – 2050 to make the copper contributes to reducing produced in the EU is obtained Europe

  33. Slide 33: Raw materials a key to sustainable development

    Slide 33: Raw materials a key to sustainable development

    Raw materials a key to sustainable development as well as care for the environment and ensuring life’s comforts to employees and society In working towards our goals we We want to wisely invest our profits in new concentrate on creating added value while at the technology, innovative solutions, best

  34. Slide 34: Sustainable value chain in the KGHM Group

    Slide 34: Sustainable value chain in the KGHM Group

    Sustainable value chain in the KGHM Group Raw materials Extraction Production Logistics Stakeholders Commerce Tailings Rational deposits Commerce based Product life cycles based Responsible use of Reduction of the Reduction of Customers, management - on Fair Trade on the Circular Economy raw materia

  35. Slide 35: Ethical standards

    Slide 35: Ethical standards

    Ethical standards KGHM Polska Miedź S.A. KGHM Ethics Hotline. Protection for whistleblowers. KGHM is a Company based on strongly-rooted  The Platform is available in four languages values and principles, which guide our  Available at https://liniaetyki.kghm.com/web/liniaetyki/ home for employees,

  36. Slide 36: Ethical standards

    Slide 36: Ethical standards

    Pokłady możliwości Ethical standards KGHM Polska Miedź S.A. We follow We avoid the principle of We take responsibility conflicts “Zero tolerance for the quality of our We care about the of interests for corruption” products and services We care about security of information our Company’s property an

  37. Slide 37: Environmental protection

    Slide 37: Environmental protection

    Environmental protection Primary obligations of KGHM Polska Miedź S.A. We supply metals and related products We keep abreast of new technologies in order to achieve the environmental to reduce industrial impact on the goals of contemporary society, environment and introduce them including actions on

  38. Slide 38: SO2 and dust emissions

    Slide 38: SO2 and dust emissions

    Emissions by the divisions of KGHM Polska Miedź S.A. SO2 and dust emissions1) SO2 emissions by KGHM Polska Miedź S.A. Dust emissions by KGHM Polska Miedź S.A. [tonnes] [tonnes] 80 000 –78% Reduction of SO emissions over the last 10 years 2 12 000 –75% Reduction of dust emissions over the last 10 yea

  39. Slide 39: Lead and copper emissions

    Slide 39: Lead and copper emissions

    Emissions by the divisions of KGHM Polska Miedź S.A. Lead and copper emissions Lead emissions by KGHM Polska Miedź S.A. Copper emissions by KGHM Polska Miedź S.A. [tonnes] [tonnes] 400 350 350 –77% Reduction of lead emissions over the last 20 years 300 –70% Reduction of copper emissions over the las

  40. Slide 40: CO2 emissions by KGHM Polska Miedź

    Slide 40: CO2 emissions by KGHM Polska Miedź

    CO2 emissions by KGHM Polska Miedź S.A.1) ETS2) direct emissions + non-ETS equivalent [kt CO2] 2 000 1 800 1 714 1 600 1 678 average 1 539 1 532 1 521 1 519 1 508 1 400 1 492 1 489 1 482 1 481 1 476 1 470 1 466 1 430 1 407 1 200 1 000 800 Scope 1 -16% yoy 600 Direct emissions by KGHM Polska Miedź S.

  41. Slide 41: We are preparing a Climate Policy

    Slide 41: We are preparing a Climate Policy

    WE ARE PREPARING A CLIMATE POLICTY The KGHM Group has committed to preparing a Climate Policy which will comprise medium-term (2030) and long-term (2050) quantitative goals, including among others:  decreases in GHG emissions (Scope 1, 2 and 3)  improved energy efficiency and greater use of renewa

  42. Slide 42: Reasons to invest in KGHM

    Slide 42: Reasons to invest in KGHM

    Reasons to invest in KGHM A leading player on the copper A reliable producer, A diversified portfolio of and silver market in terms of mine a trusted business partner assets at various stages of output and size of documented and a company committed to development to guarantee resources, in mining-fr

  43. Slide 43: Investor Relations Department

    Slide 43: Investor Relations Department

    Investor Relations Department https://kghm.com/en/investors [email protected] | [email protected] T +48 76 74 78 280 | F +48 76 74 78 205

  44. Slide 44: Supporting slides

    Slide 44: Supporting slides

    Supporting slides TOE “UTURE |S MAD= OF COPPER

  45. Slide 45: Macroeconomic environment – H1 2021

    Slide 45: Macroeconomic environment – H1 2021

    The KGHM Group vs the sector Macroeconomic environment – H1 2021

  46. Slide 46: Macroeconomic environment: commodities and currencies prices

    Slide 46: Macroeconomic environment: commodities and currencies prices

    Macroeconomic environment Commodities and currencies prices Copper prices reached a historic daily fixing maximum on 10 Cena Price(USD/t) (USD/t) Avg. Śr. ann. (USD/t) roczna (USD/t) [PLN/t] May of 10 724.5 USD/t. The average copper price amouted to [USD/t] Cena Price(PLN/t) (PLN/t) Avg. Śr. ann. (P

  47. Slide 47: Precious metals prices in H1 2021

    Slide 47: Precious metals prices in H1 2021

    Precious metals prices in H1 2021 The first half of 2021 was a calm time for these metals compared to the price volatility of 2020 Silver in H1 2021 remained stably above 25 USD/koz t After the volatility of 2020 the gold/silver ratio fell below the long term average Srebro Silver(USD/troz) (USD/koz

  48. Slide 48: Copper prices more than double the spring 2020 minimum

    Slide 48: Copper prices more than double the spring 2020 minimum

    Copper prices more than double that of the minimum in spring 2020 Commodities price index already 25% higher than prior to the pandemic Over the course of 12 months the copper price rose The industrial metals price index has risen by more than by 126% and reached a historic maximum on 10 May 50% sin

  49. Slide 49: Higher economic activity in H1 2021

    Slide 49: Higher economic activity in H1 2021

    Higher economic activity in H1 2021 especially in the eurozone Industrial PMI in the USA and Europe rose above 60. Average Industrial PMI in the eurozone was 63.4. In China meanwhile forward indicators fell slightly in June. Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-1

  50. Slide 50: Economic growth forecast of the IMF from July 2021

    Slide 50: Economic growth forecast of the IMF from July 2021

    Economic growth forecast of the IMF from July 2021 Eurozone Poland Canada 2020: -2.7% 2020: -5.3% 2020: -6.5% 2021F: 4.6%  +0.2 p.p. 2021F: 4.6%  +1.1 p.p. 2021F: 6.3%  +1.3 p.p. 2022F: 5.2%  +0.7 p.p. 2022F: 4.5%  -0.2 p.p. 2022F: 4.3%  +0.5 p.p. World 2020: -3.2% 2021F: 6.0%  0.0 p.p. 2022F

  51. Slide 51: The production of miners in H1 2021

    Slide 51: The production of miners in H1 2021

    The production of miners in H1 2021 Copper production by miners, Q2 2021 vs Q2 2020 30% 20% 10% -3% -3% -7% -13% -13% 0% -10% 22% 19% 10% 7% 5% 2% 1% -20% Teck Freeport Grupa KGHM Codelco KGHM Polska Anglo Glencore Antofagasta BHP Southern Rio Tinto Vale McMoran Miedź S.A. American Copper Copper pro

  52. Slide 52: Production and financial results – 5 years data

    Slide 52: Production and financial results – 5 years data

    Production and financial results of the KGHM Group 5 years data

  53. Slide 53: Key production data – 5 years (KGHM Polska Miedź)

    Slide 53: Key production data – 5 years (KGHM Polska Miedź)

    Key production data – 5 years KGHM Polska Miedź S.A. Ore extraction Production of copper Production of Metallic silver production [mn t dry weight] in concentrate electrolytic copper [t] [kt] [kt] 536 522 565 560 419 502 1 400 1 323 424 401 399 32.0 31.2 393 1 191 1 218 1 189 30.3 29.9 29.7 2016 201

  54. Slide 54: Key production data – 5 years (Sierra Gorda)

    Slide 54: Key production data – 5 years (Sierra Gorda)

    Key production data – 5 years Sierra Gorda1) Payable copper production Silver production [kt] [t] 14 27.6 14.1 14.5 14.6 2016 2017 2018 2019 2020 81.8 TPM2) production [koz t] 59.5 22.9 28 23.2 31.2 31.4 51.5 53.4 53.3 2016 2017 2018 2019 2020 Molybdenum production [mn lbs] 19.7 11.2 12.2 14.7 9.0 2

  55. Slide 55: Key production data – 5 years (KGHM INTERNATIONAL)

    Slide 55: Key production data – 5 years (KGHM INTERNATIONAL)

    Key production data – 5 years KGHM INTERNATIONAL Payable copper production Silver production [kt] [t] 1.7 1.6 1.6 2.4 1.7 89.8 2016 2017 2018 2019 2020 81 78.8 76.5 66.9 TPM production [koz t] 92.1 74 67.6 85.2 66.1 2016 2017 2018 2019 2020 Molybdenum production [mn lbs] 0.8 0.7 0.6 0.8 0.4 2016 201

  56. Slide 56: Sales revenue and net profit – 5 years

    Slide 56: Sales revenue and net profit – 5 years

    Sales revenue and net profit – 5 years KGHM Group Revenues Net profit [mn PLN] [mn PLN] 23 632 22 723 20 358 20 526 19 156 1 787 1 658 1 525 1 421 1 225 * 2016 2017 2018 2019 2020 2016 2017 2018 2019 2020 * Net profit of 2016 excluding impact of impairment of non-current assets, loans and impairment

  57. Slide 57: EBITDA and EBITDA margin – 5 years

    Slide 57: EBITDA and EBITDA margin – 5 years

    EBITDA and EBITDA margin – 5 years KGHM Group EBITDA by segments 1) EBITDA margin 2) [mn PLN] KGHM Polska Miedź S.A. KGHM INTERNATIONAL Sierra Gorda (55%) Others 6 623 5 753 26% 5 229 25% 4 972 23% 22% 4 666 21% 2016 2017 2018 2019 2020 2016 2017 2018 2019 2020 1) Sum of segments; adjusted EBITDA =

  58. Slide 58: Net debt and net debt/EBITDA ratio – 5 years

    Slide 58: Net debt and net debt/EBITDA ratio – 5 years

    Net debt and net debt/EBITDA ratio – 5 years KGHM Group Net debt Net debt/adjusted EBITDA [mn PLN] [ratio] 7 262 7 000 6 891 6 577 1.6 1.6 1.5 4 834 1.3 0.9 2016 2017 2018 2019 2020 2016 2017 2018 2019 2020 58

  59. Slide 59: Basic items of the consolidated financial statements

    Slide 59: Basic items of the consolidated financial statements

    Basic items of the consolidated financial statements KGHM Group Consolidated data [unless otherwise indicated] 2016 2017 2018 2019 2020 Sales revenue [mn PLN] 19 156 20 358 20 526 22 723 23 632 Adjusted EBITDA [mn PLN] 4 666 5 753 4 971 5 229 6 623 Profit/(loss) for the period [mn PLN] -4 449 1 525

  60. Slide 60: Production and financial results of the KGHM Group FY 2020

    Slide 60: Production and financial results of the KGHM Group FY 2020

    Production and financial results of the KGHM Group FY 2020

  61. Slide 61: Summation of the year 2020 in the KGHM Group

    Slide 61: Summation of the year 2020 in the KGHM Group

    Summation of the year 2020 in the KGHM Group Main macroeconomic factors and aspects of the Group in the age of the COVID-19 pandemic compared to 2019 Macroeconomic environment1) Production and C1 cost Financial results +3% +1.1% +4% Copper price Copper production Increase in revenues to PLN 23 632 m

  62. Slide 62: Metals production

    Slide 62: Metals production

    Metals production KGHM Group Payable copper production Silver production [t] [kt] -4.5% Y/Y  Slightly lower production vs 2019: 1 417 1 352 − by KGHM Polska Miedź due to the lower grade +1.1% Y/Y and thickness of the mined deposit, as well as due to the restricted supply of copper scrap in the firs

  63. Slide 63: Production results

    Slide 63: Production results

    Production results KGHM Polska Miedź S.A. Ore extraction Production of copper Electrolytic copper Metallic silver [mn t dry weight] in concentrate [kt] production [kt] production [t] –0.7% Y/Y –1.6% Y/Y -0.9% Y/Y -5.5% Y/Y 29.9 29.7 1 400 565 560 1 323 From 399 393 purchased 48.7 47.9 147 147 metal-

  64. Slide 64: Production initiatives implemented in KGHM Polska Miedź

    Slide 64: Production initiatives implemented in KGHM Polska Miedź

    Production initiatives implemented in KGHM Polska Miedź S.A. Full integration of processes in management of the supply chain  Implementation of an integrated material planning system based on the structure of where Integrated planning of costs arise material needs  Implementation of systemic tools

  65. Slide 65: Production results – Sierra Gorda

    Slide 65: Production results – Sierra Gorda

    Production results Sierra Gorda1) Payable copper production Silver production +87% Y/Y [kt] [t] +37% Y/Y  Higher extraction by 27.6 14.6 the Sierra Gorda mine 3.7 7.5 81.8 led to higher production of copper, 59.5 Q4 2019 Q4 2020 2019 2020 silver and gold in 2020 compared to TPM production +1% Y/Y 2

  66. Slide 66: Production results – KGHM INTERNATIONAL

    Slide 66: Production results – KGHM INTERNATIONAL

    Production results KGHM INTERNATIONAL Payable copper production Silver production -29% Y/Y [kt] [t]  Lower silver production -13% Y/Y in the Sudbury Basin due 2.4 1.7 to lower extraction and 0.6 0.6 lower silver content in 76.5 66.9 ore Q4 2019 Q4 2020 2019 2020  Lower gold production by -22% Y/Y

  67. Slide 67: Sales revenue – KGHM Group

    Slide 67: Sales revenue – KGHM Group

    Sales revenue KGHM Group Revenues from contracts with customers +4% Y/Y Revenues from contracts with [mn PLN] customers [mn PLN] 22 723 +1 345 +306 23 632 23 632 22 723 -48 -433 -261 1 603 1 956 2 703 3 084 Revenues for Change in sales Change in Change in Decrease in Other Revenues for 2019 volumes

  68. Slide 68: Sales revenue – KGHM Polska Miedź

    Slide 68: Sales revenue – KGHM Polska Miedź

    Sales revenue KGHM Polska Miedź S.A. Sales revenue Higher revenues from sales by PLN 1 643 million (+9%) [mn PLN] were achieved in 2020 compared to 2019 mainly due to: +9% Y/Y  higher metals prices (copper +3%, silver +27%) 19 326 17 683  a more favourable USD/PLN exchange rate (+2%) 1 615 Other 1

  69. Slide 69: The financial situation of the KGHM Group remains stable and safe

    Slide 69: The financial situation of the KGHM Group remains stable and safe

    The financial situation of the KGHM Group remains stable and safe 2020 Budget Total unit production cost of electrolytic copper from own concentrate KGHM Polska Miedź S.A.1) 19.3 [k PLN/t] 17.8 Investments Capital expenditures 2 331 2 250 KGHM Polska Miedź S.A.2) 3) [mn PLN] Other expenditures, incl

  70. Slide 70: C1 unit cost

    Slide 70: C1 unit cost

    C1 unit cost1) KGHM Group C1 – KGHM Polska Miedź S.A. C1 – Group [USD/lb] [USD/lb] -7% Y/Y incl.the minerals  The decrease in C1 cost in KGHM Polska 1.74 1.62 extraction tax Miedź versus 2019 was due to the 0.47 0.48 weakening of the PLN vs the USD and to -6% Y/Y 1.28 1.14 higher silver and gold pr

  71. Slide 71: Expenses by nature

    Slide 71: Expenses by nature

    Expenses by nature KGHM Polska Miedź S.A. Expenses by nature [mn PLN] Expenses by nature higher by +3% Y/Y 15 386 PLN 490 million yoy 14 896 Minerals extraction tax 1 625 recognised in expenses 1 520 by nature 3 778 3 974 Purchased metal- 4 296 Minerals 3 941 extraction bearing materials 3 771 3 636

  72. Slide 72: Operating results – adjusted EBITDA

    Slide 72: Operating results – adjusted EBITDA

    Operating results KGHM Group Change in adjusted EBITDA1) +27% Y/Y Adjusted EBITDA [mn PLN] [mn PLN] 6 623 6 623 +686 5 229 +839 211 -30 5 229 1 346 -101 241 660 608 709 2019 KGHM KGHM Sierra Other 2020 4 458 Polska Miedź S.A. INTERNATIONAL Gorda 3 619 Higher EBITDA for the year by PLN 1 394 million

  73. Slide 73: Financial results – profit for the period

    Slide 73: Financial results – profit for the period

    Financial results KGHM Group 1797 Profit for the period +26% Y/Y [mn PLN] consolidated net profit for 2020 Higher Group profit by PLN 376 million (+26%) mainly due to: [million PLN]  a higher net result on sales  a higher result on involvement in joint ventures + 909 + 238 + 80 1 797 - 47 - 137 -

  74. Slide 74: Higher EBITDA, higher net profit

    Slide 74: Higher EBITDA, higher net profit

    EBITDA and profit for the period KGHM Polska Miedź S.A. Adjusted EBITDA Profit for the period Higher EBITDA, [mn PLN] [mn PLN] +23% Y/Y +41% Y/Y higher net profit 4 458 3 619 1 779  EBITDA higher by 23% 1 264 vs the corresponding period of 2019  Higher net profit by PLN 515 mn (+41%) 2019 2020 201

  75. Slide 75: Cash flow

    Slide 75: Cash flow

    Cash flow KGHM Group [mn PLN] +1 172 +2 395 - 667 +2 756 2 522 -3 457 - 207 - 266 - 177 - 43 1 016 Cash as at Profit/loss Exclusion of Income tax paid Change in Acquisition of Acquisition of Proceeds from Interest paid Other Cash as at 31 Dec 2019 before income income and working capital property, p

  76. Slide 76: Net debt of the KGHM Group

    Slide 76: Net debt of the KGHM Group

    Net debt of the KGHM Group As at the end of 2020 Main factors affecting net debt in 2020 Net debt / adjusted EBITDA Increases in debt 1.5 1.7 1.6 1.4 0.9  Cash expenditures on property, plant and equipment (PLN 3 458 mn) 31-12-2019 31-03-2020 30-06-2020 30-09-2020 31-12-2020  The minerals extracti

  77. Slide 77: Capital expenditures in 2020

    Slide 77: Capital expenditures in 2020

    A rationale and responsible investment program Capital expenditures by KGHM Polska Miedź S.A. in 2020 CAPEX execution in 2020 by area by category Mining (66%) Replacement (31%) Metallurgy (30%) Maintaining mine production (35%) Other activities (1%) Development (34%) Leasing IFRS 16 (3%) Development

  78. Slide 78: CAPEX execution in key projects

    Slide 78: CAPEX execution in key projects

    CAPEX execution in key projects Construction of Damówka Large-diameter BATAs Replacement of Major SW-4 shaft pumphouse with drillholes machine park components reverse water in mines and piping maintenance Outfitting Maintaining Modernisation of mines Equipment Development Development mine of Głogów

  79. Slide 79: Selected development projects

    Slide 79: Selected development projects

    Selected development projects CAPEX execution 2020 Tailings Segregation PLN 389 mn and Thickening Station PLN 161 mn Development of Żelazny Most TSF Program to adapt the technological installations Southern Quarter to BAT Conclusions Construction and start-up of the following completed: 88% of physi

  80. Slide 80: Advancement of key investments

    Slide 80: Advancement of key investments

    Advancement of key investments Mining machinery Modernisation of WPA II deduster  Main installations and equipment of the deduster  Purchase of 161 machines, incl. 26 – Lubin process line built (exchangers, reactors, bag filters, mine, 62 – Polkowice-Sieroszowice mine, chimneys, ventilators, separ

  81. Slide 81: Pro-ecological investments

    Slide 81: Pro-ecological investments

    Pro-ecological investments KGHM Group Over 186 spent in 2020 by KGHM [including more than PLN 43 million on construction of an installation to eliminate on pro-ecological aresenic and mercury from gases at the Solinox investments1) installation in the Legnica Smelter/Refinery million PLN under the B

  82. Slide 82: Actions to reduce environmental impact

    Slide 82: Actions to reduce environmental impact

    Actions to reduce environmental impact KGHM INTERNATIONAL Actions taken by entities of the KGHM INTERNATIONAL LTD. Group in 2020 to protect the environment PLN 6 mn +20% Y/Y PLN 18 mn -36% Y/Y Carlota (USA) Robinson (USA) [incl. nearly PLN 3 mn due to environmental permits held] Actions related to m

  83. Slide 83: Advancement of the KGHM Group's strategy

    Slide 83: Advancement of the KGHM Group's strategy

    Advancement of the KGHM Group’s strategy

  84. Slide 84: 4 strategic directions for KGHM's development

    Slide 84: 4 strategic directions for KGHM's development

    4 strategic directions for KGHM’s development The review of the Strategy of KGHM Polska Miedź S.A. for 2019-2023 # 4E ELASTICITY, EFFICIENCY FLEXIBILITY ECOLOGY, SAFETY AND SUSTAINABLE E-INDUSTRY DEVELOPMENT 84

  85. Slide 85: Strategic priorities

    Slide 85: Strategic priorities

    Strategic priorities #1 Higher #2 Energy #3 International assets 2.0 #4 Long-term production independence financial strategy #5 Ecosystem #6 Technologies #7 New quality innovation of the future Safety and for KGHM development 85

  86. Slide 86: Strategy in practice (1)

    Slide 86: Strategy in practice (1)

    Strategy in practice Selected key operating initiatives (1) AREA MAIN TARGET SELECTED EFFECTIVENESS MEASURES Maintenance of cost-effective domestic and foreign production Level of production in Poland of Average yearly Yearly average of daily ore mined Cu in ore with an annual C1 metallurgical produ

  87. Slide 87: Strategy in practice (2)

    Slide 87: Strategy in practice (2)

    Strategy in practice Selected key operating initiatives (2) AREA MAIN TARGET SELECTED EFFECTIVENESS MEASURES Increase the efficiency of the KGHM Group through innovation Increase expenditures on Ensure that all of the innovation Level of funds for R&D and innovation and R&D work projects are realise

  88. Slide 88: Strategy in practice (3)

    Slide 88: Strategy in practice (3)

    Strategy in practice Selected key operating initiatives (3) AREA MAIN TARGET SELECTED EFFECTIVENESS MEASURES Implementation of systemic solutions aimed at increasing Ensure financial stability of Increase in the efficiency of Minimum level of achievement the KGHM Group’s the Polish-based Group suppo

  89. Slide 89: Key elements of the Strategy advanced in 2020

    Slide 89: Key elements of the Strategy advanced in 2020

    Key elements of the Strategy advanced in 2020  High production from domestic assets (mined production  Enhanced Energy efficiency Production 442 kt; metallurgical production 560 kt) Efficient  Continuation of digital transformation under the KGHM  Stable production from international assets (Sie

  90. Slide 90: Strategy – actions to protect our climate

    Slide 90: Strategy – actions to protect our climate

    Strategy – actions to protect our climate  Every year, KGHM’s metallurgical plants generate 650-700 thousand tonnes of mastic slag – all of Utilisation of which is processed into a full-fledged product, for example in road building Circular Economy  Over the last 10 years, KGHM Metraco has utilise

  91. Slide 91: Strategy execution after 2 years - summary

    Slide 91: Strategy execution after 2 years - summary

    Strategy execution after 2 years - summary We are adapting our activities to changes Our response to increase in competitiveness in the Flexibility Efficiency in our environment production and mining sector and Industry 4.0.  Domestic mine production remains at the level of 450 kt of copper in ore;

  92. Slide 92: Governance

    Slide 92: Governance

    js: == COs S xi oi =a m4 =O nS) ul mo) Governance

  93. Slide 93: Transparent Group structure

    Slide 93: Transparent Group structure

    Transparent Group structure General Shareholders Meeting Supervisory Board Management Board KGHM Polska Miedź S.A. (Lubin, Poland) (Listed on Warsaw Stock Exchange since 1997) KGHM International Ltd. Production Development Group of subsidiaries (Vancouver, Canada) Development divisions projects Oper

  94. Slide 94: Committed to solid corporate governance

    Slide 94: Committed to solid corporate governance

    Committed to solid corporate governance Independent directors on the Supervisory Board (10 directors total) KGHM’s Corporate Governance is guided by international standards and follows best practices: Independent Directors 2 Employee Elected  All members of KGHM’s Supervisory Board are appointed by

  95. Slide 95: Shareholder structure of KGHM Polska Miedź

    Slide 95: Shareholder structure of KGHM Polska Miedź

    Shareholder structure of KGHM Polska Miedź S.A. Ownership structure Geographical ownership structure [% of shares] No. of Percentage Share in Shareholder shares/ of share total number votes capital of votes 6% 7% Polish State Treasury 63,589,900 31.79% 31.79% 2% Nationale-Nederlanden OFE 10,104,354

  96. Slide 96: Events for investors

    Slide 96: Events for investors

    Events for investors 2021 Date Upcoming events 28 Sep PKO BP Investor’s Day: CEE Metals & Energy 4 Oct Erste Bank Finest CEElection Investor conference 2021 8 Nov Goldman Sachs 13th Annual CEEMEA One-on-One Conference 16 Nov Q3 results 17 Nov Q3 results conference TBA Investor chat with CFO 7-10 Dec

  97. Slide 97: Investor Relations Department

    Slide 97: Investor Relations Department

    Investor Relations Department https://kghm.com/en/investors [email protected] | [email protected] T +48 76 74 78 280 | F +48 76 74 78 205

Source: Internet Archive copy of kghm.com

More decks from KGHM Polska Miedz S.a.

All 79 KGHM Polska Miedz decks