Bronco Resources Corp. · TSXV:BRON
Bronco Resources — Investor Presentation (November 2024)
15 slides from Bronco Resources's investor presentation, November 2024
Slide 1: Discovering High Grade Gold in Southern British Columbia
TSX-V: BRON Discovering High Grade Gold in Southern British Columbia CORPORATE PRESENTATION NOVEMBER 2024 301-1665 Ellis Street, Kelowna, BC, V1Y 2B3 | [email protected] | www.broncoresources.com 1`
Slide 2: Cautionary Statement
CAUTIONARY STATEMENT Readers should not rely on information in this presentation for any purpose other than for gaining general knowledge of Bronco Resources Corp. (“Bronco”). This presentation may include forward-looking statements as well as historical information. Forward-looking statements inclu
Slide 3: Company Structure
COMPANY STRUCTURE ▪ Currently Bronco holds 84% owner of Placer Mountain Gold Property. Which hosts a promising new gold Trading Symbols BRON.V discover in Southern BC. Issued & Outstanding 29,093,061 ▪ Bronco is currently diluting its partner down to a royalty interest and anticipates to hold 100% o
Slide 4: Placer Mountain Location
PLACER MOUNTAIN LOCATION Large land position near mapped southerly extent of the prolific Nicola 1 Group located only 30km south of Princeton, British Columbia TOTAL HOLDINGS: 14,455 HA ▪ Placer Mountain Property (Gold-Silver) ▪ KZ-21-05 intersected 3.00m of 39.20 g/t Au and 80.40 g/t Ag from 27.00
Slide 5: Prolific BC Mineral District
PROLIFIC BC MINERAL DISTRICT ▪ Property demonstrates significant potential of hosting a large-scale orogenic gold system. ▪ Numerous producing and past-producing mines including New Afton, Copper Mountain and Elk2. ▪ The Kodiak Zone and Main Vein are located near the geological contact between the E
Slide 6: Property Overview
PROPERTY OVERVIEW ▪ 14,455 Hectare land package located off Highway 3 – with pervasive active logging roads to access the Property. ▪ Well maintained roads and active logging will continue to open new areas for detailed exploration. ▪ Low-cost mining and exploration relative to other remote jurisdic
Slide 7: Placer Mountain History
PLACER MOUNTAIN HISTORY ▪ No recorded exploration before 2008. New logging led to the discovery of angular quartz vein float. ▪ 2008 to 2019 prospecting and soil sampling led to discovery of gold mineralization in float and soil. ▪ 2019 trenching discovered the Main Zone leading to the first drill p
Slide 8: Geochemistry Gold-in-Soil
GEOCHEMISTRY GOLD-IN-SOIL ▪ Placer Mountain Property has had considerable geochemical surveys including soil, stream, and SGH (soil gas hydrocarbons), which have led to the discoveries of the Kodiak Zone and Main Vein. ▪ New Kodiak Zone Au-in-soil is far more robust than the Main Vein. ▪ Gold-in-soi
Slide 9: Drilling Kodiak Zone
DRILLING KODIAK ZONE ▪ Drilling at the Kodiak Zone only tested 150 meters of the 1.5 kilometer Au in soil anomaly. All holes intersected gold bearing quartz- sulfide veining. ▪ Drilling in 2021 occurred during extreme weather and atmospheric rivers leading to limited options for drill moves. ▪ 2024
Slide 10: Drilling Kodiak Highlights
DRILLING KODIAK HIGHLIGHTS ▪ Kodiak zone hole KZ-21-05 intersected near surface of 3.0m of 39.2 g/t Au and 80.4 g/t Ag. ▪ Mineralization hosted is quartz sulphide veining including >25% sulphides sections (see photo). ▪ Numerous high-grade intersects along strike within 2021 drilling and remains ope
Slide 11: Trenching Kodiak Zone
TRENCHING KODIAK ZONE ▪ Trench 3 (TR-03) highlighted the potential for bulk tonnage mineralization with 44.5m of 0.70 g/t gold and 1.53 g/t silver. ▪ 110 continuous chip samples were taken covering 322m in 4 separate trenches. ▪ Trenching intersected numerous quartz-sulphide veins crosscutting iron
Slide 12: Main Vein Drilling Results
MAIN VEIN DRILLING RESULTS ▪ The inaugural 533m exploration program on the Placer Mountain Property was completed in December 2020 and the Phase II program in November 2021. ▪ Results included 1.0m of 48.60g/t Au from 15m downhole (PG-20-001) and 1.5m of 34.12g/t Au and 87.7g/t Ag from 62.8m downhol
Slide 13: Drilling Main Vein
DRILLING MAIN VEIN ▪ The Main Vein is crosscut by a logging road allowing easy drilling access ▪ Main Vein has now been traced in drill core for a total strike length of 385 meters. ▪ Main Vein remains open along strike in both directions to the east and west and potential for parallel vein swarms.
Slide 14: Management & BOD
MANAGEMENT & BOD Corbin Stewart – President and Chief Executive Officer, Director B.Sc. Geology. University of Regina. Mr. Stewart has 12+ years of mining, exploration, oil and gas, and capital markets experience. Mr. Stewart also has extensive technical and project management experience ranging fro
Slide 15: Contact information
Contact information Bronco Resources Corp. Contact Person: Corbin Stewart (CEO) Address: 301 – 1665 Ellis Street, Kelowna, BC, V1Y 2B3 E-mail: [email protected]
Bronco Resources — Investor Presentation (November 2024) on 6ix