Coppermoly Limited · ASX:COY
Coppermoly — Investor Presentation (May 2009)
29 slides from Coppermoly's investor presentation, May 2009
Slide 1: Building project value
“Building project value” Coppermoly is focused on exploring for and developing copper – gold –molybdenum deposits in highly prospective Papua New Guinea. Investor Presentation- May 2009
Slide 2: Presentation Agenda
Presentation Agenda • Company Highlights • Company Objectives • Mt Nakru Copper - Gold Projects • Simuku Copper – Molybdenum Project • Corporate Profile • Summary
Slide 3: Company Highlights
Company Highlights • Since ASX listing in Jan 2008, major exploration and drilling programmes successfully completed at both Simuku and Mt.Nakru • Three large, advanced and well defined copper-molybdenum-gold systems • Inferred Mineral Resource of 200 million tones at 0.47% copper equivalent* (0.3%
Slide 4: Papua New Guinea
Papua New Guinea Copper Production in PNG averages around 200,000t per annum. (US $1 4b) go Lihir - 40 Moz AuEq ‘id 44 ¢ Frieda - 1005 Mt at 0.5% Cu, 0.3g/t Au A Porgera - ie) ° A 25 Moz Au Yandera - A 371 Mt at 0.49% CuEq « seas A Panguna - 944Mt at 0.48% Cu, 0.56g/t Au + Simuk OkTedi- — em sas 10M
Slide 5: Highlights - Excellent Locations for Development
Highlights - Excellent Locations for Development • Road access to both projects. • Deep water port at provincial capital of Kimbe. • Good local infrastructure and relatively easy logistics. • Topography not extreme (200m to 800m elevation) • Landowners work on projects
Slide 6: Company Objectives
Company Objectives • Build project value through: – Simuku Project: Undertake further drilling to expand the estimated resource, delineate the areas of higher grade copper and then commence a pre-feasibility study. – Mt Nakru Project: Undertake resource drilling at Nakru-1 and Nakru- 2 to expand on
Slide 7: New Britain – New Copper-Molybdenum Province
New Britain – New Copper-Molybdenum Province
Slide 8: Nakru Copper-Gold Project
Nakru Copper-Gold Project Seven new diamond drill Nakru Drill & Trench Results holes completed in 2008 Nineteen Drill Holes Completed ¾ 74m at 0.78% copper ¾ 27.7m at 1.90% copper including 6.7m at 3.80% copper ¾ 205m at 0.4% copper Ten kilometers of bulldozer trenching ¾ 19m at 4.3% copper ¾ 4m at
Slide 9: Nakru Copper-Gold Project
Nakru Copper-Gold Project EL 1043 Nakru Chargeability (ms) at 350m Depth argeability (ms) >30 25 - 30 20 - 25 18-20 16-18 14-16 12-14 10-12 8-10 6-8 4-6 <4 BEER GOEROB NAK017 ‘ee NAKO15: WS NAKO14 AKOOZ»
Slide 10: Nakru 1
Nakru 1 Drillhole NAK017: Sulphides at 30m depth with 28.4m at 1.10% copper and 0.27 g/t gold beneath a gold Oxide Zone where NAK16 intersected 17m at 0.58 g/t gold.
Slide 11: Major Untested Target
17m at 0.58 g/t Au MAJOR 0.11 % Cu UNTESTED Oxide Zone TARGET Au + Mo + As + Ag, Pb, Zn, Te 16m at 0.74 g/t Au 0.14 % Cu 61m at 0.32 g/t Supergene Copper Au Enrichment Zone 28m at 0.27 g/t Au 5m at 1.2 g/t1.1 Au % Cu 2.1 % Cu 11m at .33 g/t Au 0.62 % Cu Nakru 1, N – S Drill Section Schematic Plan
Slide 12: Nakru 1 Interpreted Chargeability - sulphide mineralisation
Nakru 1 Interpreted Chargeability (ms) - sulphide mineralisation Section 10 MT. NAKRU NEW UNTESTED DRILLED AREA TARGET NAK001 NAK017
Slide 13: Nakru 1
Nakru 1 • Plan view of Chargeability target largely un-tested by drilling
Slide 14: Nakru 1 and Nakru 2 3D Geophysics
Nakru 1 (right) and Nakru2 (left) 3D Geophysics
Slide 15: Nakru 2 Diatreme Breccia
Nakru 2 Diatreme Breccia • Large 700m diameter area of surface mineralisation • First ever two diamond drill hole completed
Slide 16: Nakru 2 Trench
Trench Nakru 2, 88m at 1.2% Cu, 0.33 g/t Au 19.9% Cu sample in trench Massive Copper 6.7m at 3.8% Cu Sulphide breccia Sulphides near surface 0.19 g/t Au outcrop 1.66% Zn 7m at 3.36% Cu 9.5 g/t Ag 0.19 g/t Au 37.6 ppm Mo 2.0% Zn 11.4 g/t Ag 57 ppm Mo 21m at 0.83% Cu NAK200 2 112.5m 9m at 0.53% Cu 3m
Slide 17: Nakru 2 Geophysical & Drilling High Priority Target Zones
Nakru 2, Geophysical & Drilling High Priority TARGET ZONES (ms) 25 MAJOR 20 TARGET 15 10 AREAS 3D – IP Chargeability Profile 5 250m depth slice Surface Profile 6.7m at 3.8% Cu 7m at 3.36% Cu 0.19 g/t Au 0.19 g/t Au 1.66% Zn 2.0 % Zn 9.5g/t Ag 11.4 g/t Ag 37.6 ppm Mo 57 ppm Mo 73m at 0.96 % Cu 52m at
Slide 18: Nakru Exploration Schedule
Nakru Exploration Schedule Task Date Landowner negotiations completed May 2008 Heavy machinery commissioned May 2008 Track access completed June 2008 Set-up camps June-August 2008 Trenching completed August-October 2008 Geophysical surveys September 2008 Release Assay Information November 2008 Evalu
Slide 19: Coppermoly Projects: Simuku
Coppermoly Projects: Simuku
Slide 20: Simuku Copper-Molybdenum Resource
Simuku Copper- Molybdenum Resource • Inferred Mineral Resource of 200 million tones at 0.47% copper equivalent* (0.36%Cu) defined in one third of known surface copper mineralisation • Yandera Indicated Resource 527 million tonnes at 0.38% copper equivalent (0.28% Cu, 104ppm Mo) • One hour drive from
Slide 21: Simuku Project
Simuku Project Mineralised System within a 15 km diameter volcanic rim Elevation 300m Elevation 2000m PANGUNA OK TEDI COPPER GOLD COPPER GOLD SYSTEM SYSTEM Elevation 300m 944Mt at 0.48% 663Mt at 0.76% Copper, 0.56g/t Gold Copper and 0.85g/t and 3g/t Silver(1972) Gold (2003) Simuku Geochemical zones
Slide 22: Simuku Results
Simuku Results Drilling Results (31 diamond holes) • 117m at 0.61% copper Surface Enrichment • Tobarum :18m horizon of 0.84% copper • Nayam: 12m horizon of 0.62% copper Primary Copper Zone • 56m at 0.77% copper at 240m depth Molybdenum Zone • 14m at 0.41% molybdenum Trench Results – 28 kilometres •
Slide 23: Simuku Gold Systems
Simuku Gold Systems TALELUMAS GOLD SYSTEM • Mt Talelumas: 5m at 5.0 g/t gold in trench • Daluavu River: 3.56 g/t gold in quartz vein KULU COPPER - GOLD SYSTEM • Isme Creek: 0.77 g/t gold, 0.33% copper, 1.6% zinc • Rapilli: 6 drillholes, primary copper of 0.2% • Rapisme: 0.7 g/t gold, 0.1% copper in
Slide 24: Simuku Exploration Schedule
Simuku Exploration Schedule Task Date Staffing arranged February 2008 Heavy machinery and vehicles March 2008 commissioned Track access begins March 2008 Drilling/Trenching begins April 2008 Additional drilling rigs commissioned June 2008 Releasing assay information July 2008 – March 2009 Re-evaluat
Slide 25: Experienced Board and Management
Experienced Board and Management Peter McNeil – Non Executive Chairman, (26 years experience with 23 years in PNG). Managed exploration on projects since 1988. Peter Swiridiuk – Managing Director, (18 years experience). Middle East, Mexico, PNG, Solomon Islands, Cyprus and Australian copper. Bob McN
Slide 26: Corporate Overview
Corporate Overview Listed on ASX January 2008 (Raised $8M) Code: COY Shares on Issue 82,015,288 Listed Options (30cents/April 2011) COYO 20,503,822 Unlisted Options (Director’s and Employees) 8,400,955 Fully Diluted Shares on issue 110,920,065 Share Price 5 cents Market Capitalisation $4.1M Market C
Slide 27: Why invest in Coppermoly?
Why invest in Coppermoly? • Excellent Board and management team focused on building project value • Large copper, gold and molybdenum systems in highly prospective and producing region • Highly significant assay and exploration results that demonstrate excellent high-grade primary and secondary mine
Slide 28: Disclaimer
Disclaimer This document is not a disclosure document nor does it constitute the provision of financial product advice. No representation or warranty is made as to the accuracy, completeness or reliability of the information. The information is provided expressly on the basis that recipients will ca
Slide 29: Notes
Notes: • Mineralisation at Simuku consists of copper, molybdenum, gold and silver. • Copper equivalent values have been calculated as (Cu + (7.6 x Mo) + (7818 x Au) + (101.3 x Ag)) • The copper equivalent* values for intersections are quoted in addition to individual metal values, as they provide th