Anglo American Plc · LSE:AAL

Anglo American — Investor Presentation (2002)

35 slides from Anglo American's investor presentation, 2002

  1. Slide 1: Anglo Coal Australia

    Anglo Coal Australia

  2. Slide 2: Group Structure

    Group Structure A n g lo A m e rica n p lc P la tin um G o ld Coal D ia m o n ds F e rro us /B a se F o rre st In d u s trial M e ta ls P ro d u c ts M in e ra ls S o u th A m e rica S o u th A frica A n g lo C o al A u s tra lia C a llid e D a rtb ro o k K a yu g a 1 00% 7 7% P ro je ct M o u ra D

  3. Slide 3: Anglo Coal Australia

    Anglo Coal Australia Australia’s third largest coal producer Investment in Australia totals USD 1.3bn Plans to invest a further USD 400m on Australian mine development over the next 5years Australia is essential to Anglo Coal’s long-term growth

  4. Slide 4: Major Australian Producers

    Major Australian Producers 60 50 Rio Tinto Thermal Coal (Mt) 40 30 Glencore BHP Billiton 20 Anglo 10 MIM 0 0 10 20 30 40 50 60 Coking Coal (Mt)

  5. Slide 5: 2001 Performance – On Target

    2001 Performance – On Target  Overall stretch target achieved in first full year  All business units “On Target” or better  Operating profit USD 173m and above plan, ROCE 19%  Strong cash flow  Unit cost and production on target  Achieved sustainable cost savings of USD 12m in 2001

  6. Slide 6: Products & Markets

    Products & Markets Sold over 29 Mt of coal in 2001 Diverse product range Strategy is to double managed production by 2007

  7. Slide 7: Thermal Coal Demand

    Thermal Coal Demand 500 South Asia 450 400 350 Pacific Million Tonnes 300 250 200 Americas 150 Other 100 Europe 50 EC 0 998 999 000 001 002 003 004 005 006 007 008 009 010 1 1 2 2 2 2 2 2 2 2 2 2 2

  8. Slide 8: Metallurgical Coal Demand

    Metallurgical Coal Demand 250 200 South Asia Million Tonnes 150 Pacific 100 Americas 50 Other Europe EC 0 1998 1999 2000 2001 2002 2003 2004 2005 2006

  9. Slide 9: Anglo Coal Australia – Core Strategies

    Anglo Coal Australia – Core Strategies One Team – One Business Skilled workforce Continuous improvement Growth Australian opportunities Indo-Pacific expansion

  10. Slide 10: In the Community

    In the Community Responsible corporate citizen Sponsor of Queensland Community Fund Sponsor of Camp Quality Providing scholarships & training Industry leader in safety

  11. Slide 11: Leader in Safety

    Leader in Safety 30 30 25 25 20 Anglo CoalCoal Anglo Aust. Aust. 20 Aust. CoalCoal Aust. Industry Industry 15 15 Aust. Mining Aust. Industry Mining Industry 10 10 5 5 0 0 Opencut Underground Total Opencut Underground Total Industry Comparison – LTIFR 2000/2001 (per million hours)

  12. Slide 12: LTIFR – Qld & NSW Underground Mines 2000-2001

    LTIFR 0 40 80 120 160 Cordeaux Nardell German Creek Central German Creek Central Dartbrook German Creek Southern German Creek Southern Moranbah North Oaky Creek No. 1 Crinum Ulan Bellambi West Appin Glennies Creek Oaky North U/G Angus Place Queensland Mines Kestrel Clarence New South Wales Mines Cha

  13. Slide 13: LTIFR – Qld & NSW Open Cut Mines 2000-2001

    LTIFR 0 20 40 60 80 Callide Callide Jellinbah Jellinbah Oakleigh South Walker Charbon Donaldson Invincible Curragh Moura South Blackwater Burton German Creek German Creek Queensland Mines Ebenezer Blackwater New South Wales Mines Gregory Newlands Ensham Saraji Meandu Coppabella Ravensworth/Narama Je

  14. Slide 14: Callide

    Callide rr Gladstone Power Station (NRG) Gladstone 7 Qid Alumina Refinery (QAL) To “ Brisbane S RUSTRALIA @)@Callide Power Stations To Moura

  15. Slide 15: Capcoal (German Creek)

    Capcoal (German Creek) 150 o N EW LA N D S 148o EA STERN C REEK M ackay Dalrym ple Bay/ NT Suttor Creek Hay Point QLD E n la rg e d Lake Elphinstone A re a Lacewood Hail Creek WA SA NSW Wards W ell N O RTH G O O N YELLA BURTON Bee C reek V IC RIVERSID E G O O N YELLA SO UTH Kem m is/Walker T WA LKER

  16. Slide 16: Capcoal (cont’d)

    Capcoal (cont’d) Produces 5 Mtpa hard coking coal Two underground mines and one open cut mine German Creek employs 758 people All coal is exported to steel companies The new Grasstree Mine to extend mining life

  17. Slide 17: Moranbah

    Moranbah 150 o N EW LA N D S 148 o EA STERN C REEK M ackay Dalrym ple Bay/ NT Suttor Creek Hay Point QLD E n la rg e d Lake Elphinstone A re a Lacewood Hail Creek WA SA NSW Wards Well N O RTH G O O N YELLA BURTON Bee Creek V IC RIVERSID E G O O N YELLA SO UTH Kem mis/W alker T WA LKER W est N ebo MO

  18. Slide 18: Moranbah (cont’d)

    Moranbah (cont’d) Produces 5 Mtpa hard coking coal Coal is exported to various steel manufacturers in Asia One of Australia’s most productive underground longwall mines Moranbah employs 448 people

  19. Slide 19: Jellinbah

    Jellinbah 150 o N EW LA N D S 148o EA STERN C REEK M ackay Dalrym ple Bay/ NT Suttor Creek Hay Point QLD E n la rg e d Lake Elphinstone A re a Lacewood Hail Creek WA SA NSW Wards W ell N O RTH G O O N YELLA BURTON Bee C reek V IC RIVERSID E G O O N YELLA SO UTH Kem m is/Walker T WA LKER W est N ebo

  20. Slide 20: Moura

    Moura B O U N D A R Y H IL L SO U T H B L A CK W AT ER M ine D eposit MOURA CA L L I D E Coal M easures R O L L ESTO N TH EO D O R E Coal F ired G eneration D A W SO N M O N TO Railway (high capacity) Railway (low capacity) TA R O O M WAN DOAN TA RO N G A CL A N D W I L K I E CREEK M IL L M ERR AN J

  21. Slide 21: Dartbrook

    Dartbrook M urrurundi Aberdeen DARTBROOK M uswellbrook DARTBROOK No. 2 G L O U CE S T E R Mount P leasant GU N N EDA H Scone B A SI N Stratford Bengalla B ASIN Aberdeen D RAYTO N Mount P leasant Ben galla M uswellbrook N o. 2 Duralie Bayswater No. 2 Ulan Bayswater N o. 2 DR AYTO N M ount Arthur Nort

  22. Slide 22: Dartbrook (cont’d)

    Dartbrook (cont’d) Produces approx 3.4 Mtpa of thermal coal All coal is exported to Asia Low sulphur product Dartbrook employs 293 people Kayuga seam project extends mine life

  23. Slide 23: Drayton

    Drayton M urrurundi Aberdeen DA RTB R O O K M uswellbrook G L O U CE S T E R M ount P leasant No. 2 G U N N ED A H B A SI N Scone DA RTB R O O K B A SI N Bengalla D R AY T O N Stratford Aberdeen LID DELL PO W E R Bayswater No. 2 D R AY T O N STATIO N Mount P leasant M uswellbrook N o. 2 Duralie Ben

  24. Slide 24: Drayton (cont’d)

    Drayton (cont’d) Mine produces approx 5 Mtpa of thermal coal Dragline and truck & shovel mining Export – approx 3 Mtpa Domestic – approx 2 Mtpa Drayton employs 264 people Saddlers Creek identified as replacement reserve

  25. Slide 25: Forecast Production - 2002

    Forecast Production - 2002 Mine Saleable Type Anglo Production (100% Mt) Share Callide 10.7 Thermal 100% Capcoal 5.3 Metallurgical 70% Drayton 5.0 Thermal 88% Dartbrook 3.2 Thermal 77% Moranbah 5.1 Metallurgical 88% Moura 6.0 Thermal & Met 51% Jellinbah 3.7 PCI 23% TOTAL 39.0

  26. Slide 26: Improving our Competitiveness

    Improving our Competitiveness Competitive position is a key success factor Continuous improvement philosophy Internal and external benchmarking studies External learning Acquire long life operations with low cost structures

  27. Slide 27: Dragline Benchmarking

    Dragline Benchmarking Detailed comparative data analysis prepared with external consultants Analysis highlighted large potential for improvement in dragline productivity Target improvement areas identified for each dragline

  28. Slide 28: Dragline Productivity Improving

    Dragline Productivity Improving Annual Output (t) Target v RSL (end 2001) Improvements Result Rank vs Data Top Priority Actions to May 02 (150) Rank Dragline Base 1 BH BE1350W +14.4% 36 Payload On track (16%) 2 DR BE1370W +2.3% 64 Payload On track (15%) 3 CA M8750 -5.3% 82 Payload On track (15%) 4 C

  29. Slide 29: Longwall Production - 2001

    Mine Output (Mt) - 1 2 3 4 5 6 7 OAKY NORTH MORANBAH NTH Moranba KESTRAL h NEWLANDS S. BULGA ULAN WAMBO GC-SOUTHERN GC DARTBROOK Southern Dartbrook W. WALLSEND BAAL BONE APPIN KENMARE CRINIUM NEWSTAN OAKY CREEK WEST CLIFF N. GOONYELLA SPRINGVALE CUMNOCK 1 ANGUS PLACE ELOUERA GC-CENTRAL GC Longwall P

  30. Slide 30: Coal Reserves and Development

    Coal Reserves and Development ACA has mining plans across reserves totalling almost 800 Mt Many sites still have extensive areas that have not been fully explored Confident that reserves will grow significantly as the exploration program is intensified

  31. Slide 31: Qld Reserve Areas – Northern Bowen Basin

    Qld Reserve Areas – Northern Bowen Basin N ew lands Ea s tern MACKAY C reek D al rymple B ay G lenden H ay P oi nt S uttor C reek L anc ew oo d S arina Q ue e n sla nd H ail C reek W ards W ell A U S T R AL IA K em m is W alker N or th G o onyella B ee B ur ton C reek N ebo R ivers ide S o uth W alk

  32. Slide 32: Qld Reserve Areas – Southern Bowen Basin

    Qld Reserve Areas – Southern Bowen Basin C apella Yarra bee Go rdo ns to ne J ELLIN B AH E AS T R OCK H AMPT ON Ens ham C urragh E meral d B luff B luff C omet B lackwater D ingo P ort A lma D uari nga M ount B lac kw a ter M organ C ullin-la- ringo C oo k GL ADST ON E S o uth B lac kw ater To gara

  33. Slide 33: New South Wales Coal Reserve Areas

    New South Wales Coal Reserve Areas M urru r undi 0 25 50 kilo m e tre s A U S T R A L I A N SW S con e S tratfo rd DARTBROOK A ber deen M us w ellbro o k N o2 W ards R iver M uswell br ook U lan B YL O N G D R AY TO N D enman L iddell M t. O w en G lennies C reek M itc hells SADD LERS CREEK L em ing

  34. Slide 34: Future Directions

    Future Directions ACA and Mitsui joint ventures Dawson Valley projects China Indonesia

  35. Slide 35: Conclusion

    Conclusion Anglo Coal is committed to achieving its key strategic goals of: Growth Continuous, sustainable improvement Maintaining its leading position in safety Investment in Indo-Pacific

Anglo American — Investor Presentation (2002) on 6ix