Warren Resources Inc

Warren Resources — Enercom 2015: The Oil and Gas Conference

31 slides from Warren Resources's conference presentation, Aug 19, 2015

  1. Slide 1: Enercom 2015: The Oil and Gas Conference

    Enercom 2015: The Oil and Gas Conference August 19 Wilmington Field, California Atlantic Rim, Wyoming Tunkhannock, Pennsylvania Ensuring Stability, Growing Shareholder Value

  2. Slide 2: Forward-Looking Statements

    Forward-Looking Statements Forward-Looking Statements. This presentation includes forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. Certain statements in this presentation are forward-looking and are bas

  3. Slide 3: Warren's Core Assets

    Warren’s Core Assets Area Net Acreage 1H15 Net Production Proved Reserves as of 12/31/14 Appalachian Basin 5,289 60.2 MMcf/d 212 Bcf Los Angeles Basin 2,460 2,828 Bbls/d 16.8 MMBbls Washakie Basin 73,355 14.6 Mmcf/d 115 BCF Total 81,104 92 Mmcfe/d 428.1 Bcfe Dry-gas plays Oil plays Washakie Basin La

  4. Slide 4: A Focused Business Strategy

    A Focused Business Strategy Right-size Capital Spending $21 MM front end loaded capex budget for 2015 tracks cash flow Optimize Operating Metrics and Asset Intensity Reduced LOE and G&A per Mcfe by 22% and 18% respectively over past two quarters Days to drill in Marcellus reduced 15% based on the la

  5. Slide 5: Recent Major Milestones: Reinforcing Financial Stability

    Recent Major Milestones: Reinforcing Financial Stability May 2015 GSO/Franklin Square Financing Replaced existing bank facility and added $202 MM of new money Retired $22 MM of unsecured debt $30 MM delayed draw feature Flexibility to pay down and redraw a portion of proceeds from closing of pending

  6. Slide 6: Pro Forma Capitalization

    Pro Forma Capitalization As of June 30, 2015 Pro Forma Adjustment (upon WY sale closing) Pro Forma Long Term Debt ($MM) ($MM) ($MM) Credit Facility(1) $172.5 ($42)(1)(2) $130.5 Exchange 1st Lien $47.2 -- $47.2 Unsecured High Yield $230.4 -- $230.4 Total Debt $451.7 ($42) $409.7 Cash $16 -- $16 Delay

  7. Slide 7: 2015 Guidance

    2015 Guidance1 2015 Capex Budget 2015 Production Guidance 1 No adjustment made for pending Wyoming CBM sale 2 1.4 bcf of gas was curtailed during 1Q Investing in the Future of Energy NASDAQ (WRES) 7 Full Year ending December 31, 2015 Oil (MBbl) 900 – 1,000 Gas (MMcf)2 28,000 – 30,000 Total - Gas Equ

  8. Slide 8: Second Quarter Accomplishments

    Second Quarter Accomplishments Per Mcfe LOE and G&A down 22% and 18%, respectively, over the past two quarters Achieved production at top end of guidance with Marcellus and CA business units outperforming projections Conducted completion operations on two upper Marcellus wells that are currently flo

  9. Slide 9: Financial Hedges

    Financial Hedges Natural Gas Hedges(1) Oil Hedges(1) Open hedges as of 8/04/15. Price forecast as of 8/14/2015. Investing in the Future of Energy NASDAQ (WRES) 9 $51.87 $52.99 $52.99 $51.67 $50.00 $50.00 $53.73 $66.49 $67.27 $70.90 $71.50 $71.50 $47.55 $44.11 $46.90 $49.12 $50.63 $52.02 $- $10.00 $2

  10. Slide 10: Sales Agreements - Marcellus

    Sales Agreements - Marcellus Investing in the Future of Energy NASDAQ (WRES) 10 NE PA Natural Gas Hedge Realization(1) NE PA Basis Differential Hedges(1) Open hedges as of 8/04/15. 0 10,000 20,000 30,000 40,000 50,000 60,000 Physicals Sales Agreement, NYMEX - $1.65/Mmbtu: 30,000 Mmbtu/day P&G Contra

  11. Slide 11: Marcellus Operations

    Marcellus Operations Investing in the Future of Energy NASDAQ (WRES) 11

  12. Slide 12: Operational Update and Efficiency Improvements

    Operational Update and Efficiency Improvements Days vs. Depth Continually capturing operational efficiencies while remaining focused on additional tangible improvements to increase productivity 2015 Capex: $13 million Drilling Recap Two high quality locations drilled to test Upper Marcellus 5% under

  13. Slide 13: Field Infrastructure and Marketing

    Field Infrastructure and Marketing Operational infrastructure system in place to support full field development including Upper Marcellus development Ample takeaway capacity of 285,000 gross MMBtu/d on entire position UGI’s Auburn I and Auburn II pipelines gives ability for Bi-directional flow to tw

  14. Slide 14: Multiple Upside Opportunities in the Marcellus

    Multiple Upside Opportunities in the Marcellus Increase EURs booked in proved reserves by proving-up greater recovery factor of OGIP Current production supporting 3P recovery factor Prove Upper Marcellus potential with two test wells Flowback results validate potential Improvement in natural gas rea

  15. Slide 15: Proving-up greater recovery factor of OGIP

    Proving-up greater recovery factor of OGIP Key Points Marcellus Production Performance Actual production continues to outperform NSAI proved estimates Decline from production shallower than 3P estimates with continued performance expected to be in line with the 3P estimates Recently completed lower

  16. Slide 16: Upper Marcellus Results

    Upper Marcellus Results Both locations have been flowing back for 2+ weeks Combined rate of 17,500 Mcf/day flowing to sales ~3% of completion fluid recovered Expect to see continued cleanup and improvement in the performance of the wells Pads and infrastructure in place to support full development L

  17. Slide 17: Northeast Takeaway Expansion Projects

    Northeast Takeaway Expansion Projects Source: FERC and Bentek Investing in the Future of Energy NASDAQ (WRES) 17 6 7 8 9 10 11 12 13 14 15 Jan-15 Jan-16 Jan-17 Jan-18 Jan-19 Jan-20 Bcf/day Existing capacity Niagara Expansion TCO East Side Leidy Southeast Constitution Pipeline DTI/IRQ NIMO AGT-AIM No

  18. Slide 18: California Operations

    California Operations Investing in the Future of Energy NASDAQ (WRES) 18

  19. Slide 19: Wilmington Field Overview

    Wilmington Field Overview Key Points Operated by Warren 2,476 gross, 2,460 net acres Average net daily production (2Q 2015): 2,747 Bbls/day Proved Reserves(1): 16.8 MMBbls Horizontal / sinusoidal development to drill “highly targeted wells” in 5 stacked pay zones Use modern technology to maximize re

  20. Slide 20: Wilmington Field Development

    Wilmington Field Development Team has been very successful in capturing efficiency gains during development and is keenly focused on decreasing production costs for 2015 and beyond: Targeting Operating Expense Reduction of $5 MM to $6 MM from 2014 to 2015 and 20% reduction in supplier service costs

  21. Slide 21: Wyoming Assets

    Wyoming Assets Investing in the Future of Energy NASDAQ (WRES) 21

  22. Slide 22: Wyoming Deep Potential: Producing Zones

    Wyoming Deep Potential: Producing Zones Following the pending sale of the Wyoming CBM asset Warren will retain 70% of pre-existing deep rights ~39,000 net acres in the Atlantic Rim area potentially prospective for oil bearing formations including: Sussex (oil) Shannon (oil) Niobrara (oil) Frontier (

  23. Slide 23: Financial Overview

    Financial Overview Investing in the Future of Energy NASDAQ (WRES) 23

  24. Slide 24: Historical Financial Results

    Historical Financial Results Investing in the Future of Energy NASDAQ (WRES) 24 1 See reconciliation to US GAAP in Appendix 2 TTM thru June 30, 2015 0 20 40 60 80 2009 2010 2011 2012 2013 2014 TTM Chart Title Oil Production (Mmcfe/d) Gas Production (Mmcfe/d) 28.7 90.2 33.3 35.2 62.5 26.3 28.7 Produc

  25. Slide 25: Why Invest in Warren Resources, Inc

    Why Invest in Warren Resources, Inc High Quality Assets Low decline water flood oil production with best in class lifting expense, ~$20/Bbl Core of the core Marcellus Shale position Moderate decline profile outperforming 3P projections One of the lowest cost operators for the Marcellus, $0.87/Mcf Hi

  26. Slide 26: Appendix

    Appendix Investing in the Future of Energy NASDAQ (WRES) 26

  27. Slide 27: Proved Reserves: YE 2014 Asset Summary

    Proved Reserves: YE 2014 Asset Summary Natural Gas Reserves Estimated Proved Reserves Composition Oil Reserves By Category Commodity Mix Estimated Proved Reserves of 428 Bcfe 76% gas, 60% proved developed (PDP/PDNP) Source: Warren reserve report as of 12/31/14. 203.3 124.1 - 125 250 375 500 Gas PDP/

  28. Slide 28: 2014 Reserve Summary

    2014 Reserve Summary Change in Proved Reserves (SEC pricing) Bcfe Balance at 12-31-13: 202.5 Discoveries & Extensions 26.4 Revisions 17.2 Purchase (Marcellus) 204.8 Production (22.8) Balance at 12-31-14: 428.1 YE 2013 to 12-31-14 Change: 111% Reserve Replacement Ratio (Organic) 191% Net Oil Net Gas

  29. Slide 29: Non-GAAP Disclosure

    Non-GAAP Disclosure Warren reports its financial results in accordance with accounting principles generally accepted in the United States of America ("GAAP"). However, management believes certain non-GAAP measures provide useful information for investors as the Company utilizes non-GAAP measures int

  30. Slide 30: Non-GAAP Reconciliation: EBITDA

    Non-GAAP Reconciliation: EBITDA Note: Totals may not foot due to rounding differences. Investing in the Future of Energy NASDAQ (WRES) 30 Trailing 12 months ($MM) 2011 2012 2013 2014 6/30/15 Net Income/Loss $21.6 $15.5 $30.4 $24.0 ($182.5) Interest Expense 3.2 3.3 3.0 9.6 20.2 Income Taxes (0.1) - 0

  31. Slide 31: PV-10 Reconciliation

    PV-10 Reconciliation1 Non-GAAP Reconciliation: Year-end 2014 SEC PV-10 1) PV-10 reconciliation to Standardized for Warren as of year-end 2014 Investing in the Future of Energy NASDAQ (WRES) 31 For the Year Ended December 31, 2014 (in 000s) Proved developed $395,682 Proved developed non-producing $64

Warren Resources — Enercom 2015: The Oil and Gas Conference on 6ix