E3 Lithium Ltd · TSXV:ETL

E3 Lithium — Investor Presentation (March 2025)

24 slides from E3 Lithium's investor presentation, March 2025

  1. Slide 1: E3 Lithium

    = E3 LITHIUM TSX.V: ETL | OTCQX: EEMME | FSE: OW3

  2. Slide 2: Forward Looking Statements

    THE FUTURE OF CANADIAN LITHIUM. TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 Forward Looking Statements This presentation contains forward-looking statements and forward-looking information within the meaning of applicable Canadian securities laws regarding E3 Lithium Ltd. (“E3 Lithium” or the Company’). Fo

  3. Slide 3: Delivering on Strategy

    £3 Une UUW OF TSX.V: ETL | OTCQX: EEIMMF | FSE: OW3 CANADIAN LITHIUM Delivering on Strategy FOCUS Become revenue generating by establishing reliable and sustainable production through the development of the Clearwater Project. To build a portfolio of robust crow ail is Significant untapped resources

  4. Slide 4: Delivering on Value

    THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 CANADIAN LITHIUM Delivering on Value North American Strategic Critical Mineral Asset The Canadian Leader for Lithium-in-brine Pathway for Energy Independence with local supply |

  5. Slide 5: The Team

    £3 THE FUTURE OF TSX: ETL | OTCQX: EEIMMF | FSE: OW3 CANADIAN LITHIUM The Team Experienced and highly skilled team committed to maximizing shareholder value Management Team Chris Doornbos, P.c20 Kevin Cartel, Peng Leigh Clarke , 1.8 Brian Ceeten, Eng Caroline Mussbach er, PEne Chief De VP, Goverment

  6. Slide 6: Clearwater Project Pre-Feasibility

    € THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 CANADIAN LITHIUM Clearwater Project Pre-Feasibility Major milestone to commercializing lithium in Alberta Initial production of 32,250 tonnes of LHM NPV of USS3.70 Billion (after-tax) Mineral reserves 1.29 Mt LHM (Proven & Probable) Zero liquid di

  7. Slide 7: Clearwater Project PFS Economics

    € THE FUTURE OF TSX: ETL | OTCQX: EEIMMF | FSE: OW3 CANADIAN LITHIUM Clearwater Project PFS Economics 32,250 tpa Initial Production PFS Metric Units Value 50 Year O eration Initial Production Tonnes LHM/year 32,250 p Average Production (50-year) Tonnes LHM/year 25,850 IRR (after-tax) NPVs (after-tax

  8. Slide 8: Peer Comparison: Industry-Leading Position on the Cost Curve

    €3 Peer Comparison: Industry-Leading Position on the Cost Curve ey Hardrock Available USD per tonne 30,000 25,000 20,000 15,000 10,000 5,000 THE FUTURE OF CANADIAN LITHIUM YU: Brine Available Y | Under Contract 500 Global Lithium Carbonate Equivalent Cost Curve (2030) 1,000 TSX.V: ETL | OTCQX: EEMMF

  9. Slide 9: Clearwater Site - Accessible Infrastructure

    € THE FUTURE OF TSX.V: ETL | OTCQX: EEIMMF | FSE: OW3 CANADIAN LITHIUM Clearwater Site - Accessible Infrastructure The Clearwater Project has access to robust infrastructure with over a century of oil and gas operational excellent supporting it. Two-lane Highway * Direct access from a secondary road

  10. Slide 10: Mineral Resources & Reserves

    £3 THE FUTURE OF TSX: ETL | OTCQX: EEMMF | CANADIAN LITHIUM Mineral Resources & Reserves FSE: OW3 Brine Production: Well and Pipeline Network Bashaw District Resources Li LCE LHM Original Lithium in Place (OLIP) (tonnes) (tonnes) (tonnes) TOTAL 3,046,800 16,218,100 18,421,000 Indicated Mineral Resou

  11. Slide 11: Clearwater Process Facility

    £3 THE FUTURE OF CANADIAN LITHIUM. TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 Clearwater Process Facility Lithium Hydroxide Plant DLE and Post DLE Treatment Pre-Treatment - Degassing Gas Compression and Injection Brine Inlet Emergency Flare ab me) > °> Aall((UU(UI| -fte This image is a graphical represent

  12. Slide 12: Lithium Production Flowsheet

    £3 THE FUTURE OF TSX.V: ETL | OTCQX: EEIMMF | FSE: OW3 CANADIAN LITHIUM Lithium Production Flowsheet Lithium Enriched Brine Direct Lithium Extraction Concentration and Purification Lithium Depleted brine reinjected into the aquifer ee d Brine transported via underground pipelines and degassed at the

  13. Slide 13: 2025 - Demonstration Facility

    THE FUTURE OF £3 CANADIAN LITHIUM TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 2025 - Demonstration Facility Objectives * Demonstrate DLE at a larger scale utilizing a design that will operate very close to commercial CONTENTS: ALBERTA LITHIUM * Confirm the operation of an integrated system operating all pr

  14. Slide 14: Pathway to Lithium Commercialization

    Q2: THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 CANADIAN LITHIUM Pathway to Lithium Commercialization * The schedule is largely dependant on the receipt of permits and the timing of project financing. * £3 Lithium is committed to aggressively chasing the project schedule, however, there is no

  15. Slide 15: Advantages of Alberta Lithium Brines

    THE FUTURE OF £3 CANADIAN LITHIUM TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 Advantages of Alberta Lithium Brines Abundant Lithium Resources large lithium-in-brine resources repurposing from well-known and long producing assets (almost 80 years) Geopolitical Stability allowing for secure and reliable acce

  16. Slide 16: Building a Secure and Responsible Future

    THE FUTURE OF CANADIAN LITHIUM Building a Secure and Responsible Future é Water Recycling, Water Usage * Zero Liquid Discharge philosophy will result in no process water discharged into the environment + Process water for the operation will be sourced from recycling and make- up water from waste bri

  17. Slide 17: Pure Lithium Joint Development Agreement

    THE FUTURE OF £3 CANADIAN LITHIUM TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 Pure Lithium Laboratory in Boston, MS Pure Lithium Joint Development Agreement Why Pure Lithium and E3 Lithium: The Potential for Low- Cost, High-Performance Batteries Concentration and Purification Purified E3 lithium concentrat

  18. Slide 18: Developing a Pipeline of Projects

    THE FUTURE OF £3 CANADIAN LITHIUM TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 Come: dencle, [Z Bashaw District Resource Area CO Clearwater . . s s Edmonton I i Cties 7 Developing a Pipeline of Projects 4 | mia vote 4 Airports Bashaw District contains over 16 MT LCE (Measured and Indicated Mineral Resource)

  19. Slide 19: Expanded Valuation Proposition

    THE FUTURE OF CANADIAN LITHIUM TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 Expanded Valuation proposition Estevan Lithium District * Saskatchewan is a growing lithium jurisdiction * 3 holds a central position of approximately 67,000 hectares of land within the Estevan Lithium District * Recent Inferred Min

  20. Slide 20: Lithium Demand: North America

    £3 THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 CANADIAN LITHIUM Lithium Demand: North America Canada’s local supply chain ~250,000 tonnes LHM/year* Demand Supply Balance North America HONDA $15 billion EV assembly with battery and cathode (POSCO) with 36 GWh capacity <> EV and cathode facilit

  21. Slide 21: Capital Structure

    THE FUTURE OF CANADIAN LITHIUM TSX.V: ETL | OTCQX: EEMMF | Capital Structure CAPITAL STRUCTURE Working Capital 23M Shares Outstanding (basic) 75.3M Warrants Outstanding 3.8M Options Outstanding 6.5M Shares Outstanding (f.d.) 85.6M TSX VENTURE - QUOTED IN CAD as of ETL 01/06/2025 Share Price $1.05 Ma

  22. Slide 22: Total Capital Raised and Non-Dilutive Funding

    £3 CEN ADIANcrTARUM TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 $114.2M Total Capital Raised $46M Available (grants and cash as of Q3 2024) Only 75M Shares Outstanding Non-Dilutive Capital Raises Alberta Innovates $0.2M 2017-2019 $4.8M Alberta Innovates $1.8M ' Strategic Innovation Fund $27M 1 1 NRCan (CMR

  23. Slide 23: Why Invest in E3 Lithium

    THE FUTURE OF € CANADIAN LITHIUM TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 Why Invest in E3 Lithium 1: These details ore port of E3 Lithium’s Clearwater Pre-Feasibility Study, outlined within the June 20, 2024 Technical Report “Clearwater Project NI 43-101 Technical Report on Pre-Feasibility Study, Basha

  24. Slide 24: Get in touch

    £3 E3 LITHIUM Get in touch [email protected] www.e3lithium.ca TSX.V: ETL | OTCQX: EEMMEF | FSE: OW3

E3 Lithium — Investor Presentation (March 2025) on 6ix